HomeMy WebLinkAboutAPPLICATION Patio Roof 418 Pawnee Lane 2023-06-08Application Details
Application Terms
This document is NOT a permit and does not constitute approval or authorize any construction or
changes to the above location.
Application Date:06/08/2023
Acceptance Date:
Residential Alteration
06/08/2023
418 Pawnee Lane, Estes Park, CO
80517
Job Site Address:
Category:
Type:Residential Remodel
Property Owner:Gregg and Suzanne Jurgens
418 Pawnee LaneMailing Address:
Estes Park, CO 80517
Phone:(970) 481-7522
Email:
Description of Work:
Construct a covered roof over an existing concrete patio
Contractors:
McLain Construction Inc. (970) 412-7471Primary
Occupant:
Applicant:
Name:
Phil McLain
Phone:
(970) 412-4771
Email:
phil@mclainbuilt.co
m
Name: Phone: Email:
Residential Remodel
23-EP-00289
Estes Park
170 MacGregor Ave Suite 230, Estes Park, CO
80517
(970) 577-3726 (970) 586-0249
Fields
# 1/2 Baths:0
# Bedrooms:0
# Stories:0
Basement - Unfinished
SqFt:
Designed Occupant
Load:
0
Garage SqFt:
New Home:False
Required Setback
Front:
Required Setback
Right:
UTSD/EPSD OR
SEPTIC:
unknown
# 3/4 Baths:0
# Full Baths:0
Basement - Finished
SqFt:
Construction Type:VB
Estimated Valuation:$40,000.00
Main Floor SqFt:0
Required Setback
Back:
Required Setback Left:
Total Square Footage:
Submitted by: pvillano@safebuilt.com