HomeMy WebLinkAboutPLANS Remodel 1047 Mogan St 2023-11-10Re v i s i o n 1 - 1 0 - 3 1 - 2 3 BURROW RESIDENCE GARAGE EXPANSION 1047 Morgan Street Estes Park, CO 80517 Existing House Existing Garage 12'-0"6'-0" 5 ¾ "± Maintain exist elec meters G Maintain exist gas meter OH E OH E Existing RV Garage SS SS SS GC to locate all utilities prior to construction CO MH Site Plan Scale: 1" = 20'-0"plan true 0 10 20 30 40 Morgan Street Mo r g a n S t r e e t EZONE EZONE EZONE EZONE EZONE 15 ' - 0 " se t b a c k setback Remove (1) existing tree A1 Title Sheet, Site Plan and Notes A2 Demolition Plan A3 Floor Plan A4 Foundation and Wall Framing A5 Structure and Roof Framing A6 Exterior Building Elevations A7 Sections and Details Sheet IndexPermit Information APPLICABLE CODES: 2015 International Residential Code (IRC) 2023 National Electric Code (NEC) MUNICIPALITY:Town of Estes Park PARCEL #:2530317031 SCHEDULE:0616117 OWNERS: Terry and Gail Burrow 1047 Morgan St Estes Park, CO 80517 LOT AREA: 0.26 Acres 11,185 sf ± ZONING CLASSIFICATION: E Estate Setbacks Front and Rear 15'-0" Sides (west side) 10'-0" Maximum Height 30'-0" Min Building Width 20'-0" OCCUPANCY: Single-Family Residence CONSTRUCTION TYPE: Type V-B (IBC Classification) - not-sprinklered FLOOR AREA:Existing Conditioned House 1,305 sf Porches 203 sf 2-car Garage 496 sf Existing RV Garage 372 sf Demolition RV Garage Perimeter 21 sf Proposed Addition RV Garage Expansion 244 sf Revised Area of RV Garage 595 sf BUILDING HEIGHT:Existing prior to addition 18'-6" Proposed with addition 19'-2" FEMA FLOOD ZONE:X - Area of Minimal Flood Hazard STRUCTURAL DESIGN CRITERIA: Project Elevation: 7687' Ground Snow Load (Pg): Tabular: 60 psf at 7000'; 70 psf at 8000' Interpolation: 60 + 10x0.687 = 67 psf Roof Snow Load: Importance Factor (Is) = 1.0 Exposure Factor (Ce) = 1.0 (Exposure C) Thermal Factor (Ct) = 1.1 (Heated Structure) Pf = 0.7 x Ce x Ct x Is = 0.77 x 67 psf = 52 psf Sloped Roof Load (Ps) - low slope 50 psf Roof Dead Load (no solar anticipated this project): 15 psf Floor Live Load: 40 psf N/A Floor Dead Load (no concrete): 10 psf N/A Deck Live Load (no hot tub): 66 psf N/A Deck Dead Load: 10 psf N/A Wind Speed (Vult) 171 mph Exp C Altitude Correction Factor: 0.81 Seismic Design Category: B Minimum Roofing Classification: Class B Class B roof & ice barrier: Required Assumed Soil Bearing Pressure: 2,500 psf Electronic Documents Documents and Resources are available on the project web site… http://www.intersticearch.com/burrow/ Color Legend In these drawings colors represent... Demolition New Construction Items that have no color represent existing conditions to be maintained. Furniture and Appliances by Owner - Not In Contract Vicinity Map Estes Park, Colorado Not to Scale north Project Site 1047 Morgan St Morgan St 36 LAKE ESTES Project Narrative The existing house is approximately 30 years old. A secondary RV garage was added to the house approximately 20 years ago. This proposed project expands the RV garage 6'-0" to the east and 2'-0" to the north to more easily accommodate the Owner's equipment. The existing roof, south wall, east wall and a portion of the north wall of the RV Garage will be demolished - except the east wall construction and window will be retained for reuse in the new construction. The General Contractor shall take care to safely maintain the electrical service with is overhead above the RV garage and paneled on the remaining portion of the north wall. The conventional concrete foundation and slab-on-grade will be expanded as illustrated. A new portal frame will be constructed around the garage door opening to the south. The existing east wall construction and window will be reinstalled. ½" OSB Sheathing will be added to the interior faces of both the east and west walls for lateral resistance. Vertical microlam beams will be added to the interior west wall to mitigate a structural hinge condition (existing) where the high walls of the RV garage was built on top of the then existing lower walls of the conventional 2-car garage. The north wall will be rebuilt including a new man-door. The roof will be rebuilt using pre-engineered 2x wood trusses with ⅝" OSB sheathing installed across the bottom of the trusses. New finishes and colors will match existing. The RV garage is and will remain unconditioned space. The roof is to be minimally insulated as shown. General Contractor Architect INTERSTICE ARCHITECTURAL STUDIO Joe Calvin, AIA (970) 420-8264 PO Box 155 joe@intersticearch.com Estes Park, CO 80517 Owners Terry and Gail Burrow 1047 Morgan Street Estes Park, CO 80517 Byron Francis 504 Pine River Ct Estes Park CO 80517 (970) 518-8789 byron@buildestes.com 36 7 7 Morgan St Stan l e y A v e Prospect Ave Ba i l e y L n S o u t h S a i n t V r a i n Structural Consultation SKYPOND ENGINEERING Matthew Khachaturian, PE 312 E Elkhorn Ave Estes Park, CO 80517 (504) 940-8278 mtk@skypond engineering.com 10'-0" 15 ' - 0 " se t b a c k setback 2' - 0 " General Notes 1. Do not scale drawings for dimensions. Dimensions are typically to face of masonry or concrete and face of framing member, unless otherwise noted. 2. Clean-up of rubbish and debris resulting from work shall be collected regularly from project site and legally disposed of. 3. All weather-exposed surfaces shall have a weather-resistive barrier to protect the interior wall covering and exterior openings shall be flashed in such a manner as to make them weatherproof. 4. Contractors are responsible for all materials and quantities shown in these drawings graphically as well as those called for by note. 5. The Contractor shall obtain all necessary permits to complete the proposed work and shall comply with all local, state, and federal regulations. 6. All materials and construction shall be completed in accordance with the requirements of Town of Estes Park and the 2015 IRC. 7. Provide shoring, temporary bracing, barricades and other measures as necessary to ensure a safe building construction site. Establish a protected access route to the main house -- coordinate with Owner. 8. Take spacial care with work in proximity to overhead electrical lines. Coordinate with Utility. Coordinate the shutoff of power and other utilities with the Owner. 9. GC provide concrete splash blocks at all downspout locations. 10. Contractor to verify existing conditions and review discrepancies or inconsistencies of site and drawings with Architect prior to commencing construction. 11. Field verify all rough openings and wall widths prior to ordering or fabrication of materials. 12. Contractor shall take care during demolition to protect all items and materials to remain. Repair all damage caused by demolition to any areas of the property to its bid-time condition. Protect adjacent areas from damage, dirt, dust and fumes. 13. Provide blocking in all walls as required for door stops and shelving -- verify locations with Owner prior to drywall and/or OSB structural sheathing installation. 14. Existing information indicates no presence of asbestos or other hazardous materials. Contractor to base bid on this assumption. In the event that such materials are discovered, the Contractor shall abide by all abatement laws and codes as an equitable scope change is negotiated. 15. Provide shop drawings to the Architect for review of roof trusses and overhead door. 16. Maintain existing building address numerals on south face of existing 2-car garage. Location, size, etc to be reviewed and approved by the Fire Authority. 17. Electrical systems beyond the design provided on Sheet A3 of these drawings shall be design-build by Electrical Contactor. N 87°53'00" E 86.3' S 0 2 ° 2 7 ' 0 0 " W 1 0 0 . 3 ' N 0 8 ° 1 4 ' 0 0 " E 8 5 . 1 ' Proposed garage Expansion 15'-0" G G N 46 ° 3 4 ' 0 0 " E 3 0 . 0 1 ' N 83°18'00" E 116.0' Existing concrete driveway Expand driveway to east (about 3'-0") with (2) expansion joints as shown Extend depressed low point in driveway to maintain surface drainage to east Maintain existing building address numerals REINFORCING STEEL: a. All detailing, fabrication, and placement of reinforcing steel shall be in accordance with the "ACI Manual of Concrete Practice". b. Reinforcing bars shall conform to ASTM Specification A615 and shall be Grade 60, except ties, field bent bars where permitted by Note on Plan, or bars to be welded which shall be Grade 40. c. At splices, lap bars 36 diameters. At splices in masonry, lap bars 42 diameters. At corners, make horizontal bars continuous or provide corner bars. Around openings in walls and slabs, provide (2) #5's extending 2'-0" beyond edge of opening. d. Except as noted on the Drawings, minimum concrete protection for reinforcement shall be in accordance with ACI 318. e. Welded wire fabric shall conform to ASTM Specification A-185. ANCHOR BOLTS: Shall conform to ASTM F1554 Grade 36 with a min ½" diameter by 12" length. Anchor bolts shall be placed within 12" from building corners, concrete cold joints, and sill plates and shall be spaced at a maximum of 48" oc. Additional anchor bolt details shall be in accordance with the Drawing. Sill plates shall be held down at all anchor bolts with 3" x 3" x 3/16" plate washers. HOLD DOWNS Refer to Foundation Plan Sheet A4 and Portal Wall Detail Sheet A7 BACKFILLING: Do not backfill against foundation walls until all adjacent floor framing is in place and securely anchored or until adequate temporary shoring is installed. COORDINATION: Electrical and Plumbing Contractors shall review sleeve locations and other blockouts as needed in formwork before concrete is placed. FOUNDATION DESIGN: Design of individual and continuous footings is based on a maximum allowable bearing pressure of 2500 lbs per square foot (dead load plus full live load) placed on the undisturbed natural soils, compacted structural fill or native stone, below frost depth. CAST-IN-PLACE CONCRETE: a. All concrete design is based on the "Building Code Requirements for Reinforced Concrete" (ACI 318). b. All structural concrete shall have minimum 28-day compressive strengths as follows: Footings 3000 psi; slabs on grade 3500 psi. c. Concrete shall be proportioned utilizing Type 1/11 cement. Concrete susceptible to freezing shall be formulated for maximum frost resistance in accordance with "ACI Manual of Concrete Practice". d. Contractor shall notify Architect of cold joint locations prior to or during concrete forming. e. Cold weather and/or hot weather concreting procedures shall be provided, if conditions warrant, as recommended in the "ACI Manual of Concrete Practice". f. All anchor bolts shall be located at a minimum of 5 bolt diameters from concrete edge. Concrete footing and foundation shall have min frost protection of 30" to grade. Exterior deck piers shall be poured to elevations as shown on plans. g. Contractor verify top of footing and top of concrete elevations with existing and proposed grade. h. Saw-cut slab control joints shall be min 1" deep & min 12'-0" oc or less as may be shown on Plans. j. Place new slabs over 10-mil poly vapor barrier over 4" free-draining gravel over compacted soil. Refer to Sections for below-slab insulation. Foundation Notes Framing Notes STRUCTURAL WOOD FRAMING: a. Except where noted otherwise, all 2" lumber shall be Douglas Fir-Larch S4S #2 or better, and all solid timber beams and posts shall be Douglas Fir-Larch #1. Any proposed reclaimed lumber certified or graded by qualified professional to have equal or better properties than Douglas Fir Larch #1. b. 2x6 studs shall be Douglas Fir-Larch #2 or better. 2x4 studs shall be Stud grade or better Douglas Fir-Larch or Hem-Fir unless noted otherwise on the Drawings. c. Top and bottom plates shall be Douglas Fir-Larch #2 and better. d. Provide solid blocking at supports for wood joists. Within floor joist spaces beneath solid or built-up columns noted on Plans, blocking of area equivalent to column above shall be provided for proper load transfer. e. Provide solid blocking between joists above wall framing below and below wall framing above. f. Provide wind/seismic anchors at supports for all roof joists and trussed rafters. Anchor type shall be approved by Structural Engineer. g. Except as noted otherwise, minimum nailing shall be provided per the Nailing Schedule on Sheet A5. h. 2x6 studs shall be nailed to top plate with (2) 16d end nails and to sill plate with (3) 8d toenails or (2) 16d end nails. j. Panel identification index and/or thickness shall be as noted on the Drawings. Screw and glue plywood floor sheathing to floor joists with adhesive conforming to Manufacturer's directions. k. Unless otherwise noted, steel connectors such as those manufactured by the Simpson Strong-Tie Company shall be used to join rafters, trusses, joists, or beams to other members at flush-framed conditions. Connector conditions not otherwise noted shall utilize hangers of a size specifically designed for the member supported, as shown in mfgr's published tables. The floor joist and roof truss mfgrs shall specify specific hangers on their shop drawings. l. All wood framing members in contact with concrete or CMU shall be either redwood or pressure treated. m. All architecturally exposed beams to be weather-resistant with stained finish. n. Any non-detailed connections shall conform to the 2015 IRC. o. All I-Joists shall be Roseburg RFPI 40 series or equivalent. p. All glulam members shall be 2400f-2.0E. Exterior Walls: a. All exterior walls are 2x6 studs at 16" oc unless noted or dimensioned otherwise. Exterior bearing wall heights above 10'-0" are to be constructed of 2x6 Hem Fir #2 Studs at 16" oc. b. Sheath with APA Structural 1 Exposure C on exterior w/ blocking w/ 8D nails @ 4"oc edges/12" oc field & 1/2" gypsum board w/ #6 drywall screws 4"oc edges / 12"oc field on interior c. Provide (2) 2x10 header with (1) trimmer and (2) king studs at all new door & window openings unless otherwise noted. d. At beam bearing locations in stud walls, provide multiple-stud posts equal to width of bearing member unless noted otherwise. Overframing: a. Shaded areas on Roof Plan represent overframing. Provide 2x6 or 2x8 rafters at 16" oc with 2x4 cripple posts at 48" oc max to trusses/framing below (stagger posts) use (2) 2x8 at ridge & valley members. Interior Walls: a. Interior walls shall be 2x4 studs full height at 16" oc unless noted or dimensioned otherwise. b. Sheath with ½" Gypsum board w/ #6 drywall screws 4"oc edges / 12" oc field on both sides c. Provide (2) 2x4 header with (1) 2x4 trimmer and (2) 2x4 king studs at each side of door & window openings typical unless noted otherwise on Plan. Roof Sheathing: a. ⅝" OSB or CDX plywood, APA 40/20 Exposure C b. All nails to be 8d Common or 10d Box. c. Sheathing to be nailed within 4 feet of the perimeter and ridge of the roof 3" o.c. edge and field. d. All other panels nailed 6" o.c. edge, 12" o.c. field. Nailing Schedule Joint Description Number of Common Nails Number of Box Nails Nail Spacing ROOF FRAMING Blocking to Rafter (Toe-Nailed)(2) 8d (2) 10d each end Rim Board to Rafter (End-Nailed)(2) 16d (3) 16d each end WALL FRAMING Top Plate to Top Plate (Face-Nailed)(2) 16d (2) 16d per foot Top Plates at Intersection (Face-Nailed)(4) 16d (5) 16d joints-each side Stud to Stud (Face-Nailed)(2) 16d (2) 16d 24" oc Header to Header (Face-Nailed 16d 16d 16" oc along edges Top or Bottom Plate to Stud (End-Nailed)(3) 16d (3) 40d per stud Bottom Plate to Floor Joist, Bandjoist, Endjoist or Blocking (Face-Nailed)(2) 16d (2) 16d per foot FLOOR FRAMING Joists to Sill, Top Plate or Girder (Toe-Nailed)(4) 8d (4) 10d per joist Bridging to Joist (Toe-Nailed)(2) 8d (2) 10d each end Blocking to Joist (Toe-Nailed)(2) 8d (2) 10d each end Blocking to Sill or Top Plate (Toe-Nailed)(3) 16d (4) 16d each block Ledger Strip to Beam (Face-Nailed)(3) 16d (4) 16d each joist Joist on Ledger to Beam (Toe-Nailed)(3) 8d (3) 10d per joist Band Joist to Joist (End-Nailed)(3) 16d (4) 16d per joist Band Joist to Sill or Top Plate (Toe-Nailed)(2) 16d (3) 16d per foot 1 1 October 31, 20231 10/31/23 Sheet Number A1 Joseph E Calvin Date Sheet Title Title Sheet, Site Plan and Notes October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC SAFEbuilt APPROVED Subject to inspection and compliance to all relevant Adopted Building and Municipal codes. Changes in Plans MUST be approved. D.GRAHAM 11/02/2023 I-CODES 2015 23-EP-00575 PRINT PLANS IN COLOR AND HAVE FOR INSPECTOR AT TIME OF INSPECTION REVIEWED FOR BUILDING AND STRUCTURAL. ELECTRICAL INSPECTIONS PER THE STATE OF COLORADO. BRACED/ WALL SHEAR WALL AND SHEATHING INSPECTION REQUIRED FOR ALL NOTED INTERIOR AND EXTERIOR WALLS ©2023 Interstice Architectural Studio, LLC Demolition Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 NE Demolition 3D View Scale: 1/4" = 1'-0" nort h 0 1 2 4 6 8 SE Demolition 3D View Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8 Maintain existing building address numerals 1'-0" 1'-11" Remove existing overhead door - evaluate track for possible reuse Remove portion of slab to facilitate raising foundation Completely remove south wall Maintain west wall Maintain gutter - salvage high gutter for reinstallation Completely remove south wall Excavate to accommodate expanded foundation Carefully salvage east wall construction with siding intact for reinstallation Carefully salvage east wall construction with siding intact for reinstallation Salvage downspout for reinstallation - gutter above may be salvaged as well, but length will need to be extended for reinstallation 4'-2" 4'-4½" Existing former window opening will be closed in final construction Maintain existing window within salvaged east wall Remove upper portion of north east and south foundation walls to accommodate new slab expansion Completely remove roof structure above Maintain upper wall framing and top plate Maintain floor slab Maintain portion of north wall, electrical utilities, and portion of NW foundation wall as shown Take care to maintain and safely work around overhead electric service Demolition General Notes 1. Provide temporary building and site barricades and construction fencing where and when appropriate. 2. The Contractor shall be responsible for legally disposing of all removed items and materials not to be reused or returned to the Owner. 3. Contractor shall protect all adjacent improvements/properties from damage and erosion. Any disturbed areas shall be restored to a minimum of their original condition per the erosion and sedimentary control plan. 4. Salvageable materials to be removed such as east wall construction, overhead door track, downspout and gutter, siding and trim, shall be retained and and stored on site northeast of building for reuse. Coordinate on-site storage of all reused items and materials with Owner. 5. Conditions depicted on these drawings have been compiled from available information and must be verified with on-site conditions. Notify Architect of any discrepancies between these drawings and the actual conditions. 6. Existing information indicates no presence of asbestos or other hazardous materials. Demolition Contractor to base bid on this assumption. In the event that such materials are discovered, the Contractor shall abide by all abatement laws and codes as an equitable scope change is negotiated. 7. Coordinate all utility shut-off with Owner. Maintain access to non-work areas. Provide tenting, barricades, etc to protect surrounding conditions to remain from construction activity. Maintain safe egress from nearby bedrooms when occupied during work. 8. Contractor shall clean-up work premises each day and thoroughly clean at completion of work. 2-car Garage Bedroom BedroomKitchen Dining Living LaundryBedroom Bath Bath Maintain safe egress from bedroom when room is occupied 10/31/23 Sheet Number A2 Joseph E Calvin Date Sheet Title Demolition Plan October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC REVIEWED BY SAFEBUILT 11/02/2023 ©2023 Interstice Architectural Studio, LLC Floor Plan Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 NE New 3D View Scale: 1/4" = 1'-0" nort h 0 1 2 4 6 8 SE New 3D View Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8 3 3 6'-6"11'-6" 18'-0" 3'-0"12'-0"3'-0" 32 ' - 0 " 2' - 0 " 1'-4"3'-2"9'-6" 14'-0"3'-8½" 2' - 0 " Maintain electric service Maintain egress window New 3'-0" x 6'-8" insulated hollow metal man door with hinges, lockset, threshold, sweep and weatherstripping New wall construction 2x6 studs at 16" oc with min ½" exterior OSB sheathing Reinstall existing 2x4 framed east wall along with exterior sheathing and siding, and with existing east window Expanded RV Garage 595 sf New 4" reinforced concrete slab - See Sections Sheet A7 - match slope of existing Sawcut control joints at changes of slope and at locations shown Existing concrete slab Exposed upper edge of new foundation wall New LED light fixtures installed on ceiling sheathing or high on side walls LVL wall stiffeners - See Sheet A5 New ½" OSB sheathing full extent of side walls 1 A7 typ 2 A7 South portal wall framing and hold downs - see dtl 2/A7 Maintain west wall framing 2-car Garage Bedroom BedroomKitchen Dining Living LaundryBedroom Bath Bath South portal wall framing See dtl 2/A7 New 12'-0"W x 13'-0"T insulated overhead door - possible reuse of existing door track - review product information with Owner for approval B K Key and button switches for garage door opener Ceiling outlet for garage door opener 10/31/23 Sheet Number A3 Joseph E Calvin Date Sheet Title Floor Plan October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC A4 REVIEWED BY SAFEBUILT 11/02/2023 36" LANDING LIGHT REQUIRED OUTSIDE OF DOOR AT LEAST ONE GFCI PROTECTED RECEPTACLE REQUIRED IN EACH GARAGE BAY. ©2023 Interstice Architectural Studio, LLC Fondation Plan1Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8Slab Plan2Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8Walls Plan3Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 Fondation 3D View4Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8Slab 3D View5Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8Walls 3D View6Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8 2' - 0 " 3'-6½"14'-0" 34 ' - 0 " 6'-0"9'-1"2'-2"±9"VIF 3'-1"2'-11" 32 ' - 0 " r e i n s t a l l e x i s t i n g w a l l 2' - 0 " Ne w 2 x 6 w a l l 14'-0" 1'-4"3'-2"9'-6" 4'-2" existing wall 3'-6½" Control joist & change of slope Sawcut control joint Sawcut control joint 1'-4"3'-2"9'-6" Match top of concrete foundation wall to top of exiting foundation Simpson HDU4-SDS2.5 hold down bolt cast into concrete - coordinate exact location with framing 2' - 0 " Lower top of wall 8" to receive expanded slab Foundation wall and footing re: Section 1/A7 for dimensions and reinforcing Foundation wall and footing re: Section 1/A7 for dimensions and reinforcing Lower top of wall 12" to receive expanded slab Match top of concrete foundation wall to top of exiting foundation Simpson HDU4-SDS2.5 hold down bolt cast into concrete - coordinate exact llocation with framing 4" thick concrete slab w/ 6"x6" W2.1xW2.1 WWF mid depth & #4 cont at perimeter Extend thickened slab over edge of foundation wall Extend thickened slab through door opening Drill 6" deep holes into edge of existing slab at 32"oc and dowel with #4 x 16" long in epoxy 1 A7 typ 1 A7 typ 1 A7 typ 2 A7 Reinstall existing 2x4 framed east wall along with exterior sheathing and siding, and with existing east window Reinstall existing 2x4 framed east wall along with exterior sheathing and siding, and with existing east window Attach new`/existing walls with 10d nails 16"of from both sides of joint Sheath garage-side face full extent of existing west and reinstalled east wall with ½" OSB sheathing with 8d nails or typeW screws 4"oc at panel perimeter and 12"oc along studs in field (7)1¾"x9¼" (or 9½") x 14'-0"L LVLs at 48"oc to stiffen wall across existing hinge condition between lower and upper wall framing - attach through sheathing to horizontal plates with (6) ⅜" x 4" TimberLok screws - attach through sheathing to suds with 0.162" x 3½" ring shank screws at 12"oc - Keep LVLs min 1" above conc slab Portal wall framing with interior and exterior sheathing - refer to detail 2/A7 for requirements 10/31/23 Sheet Number A4 Joseph E Calvin Date Sheet Title Foundation and Wall Framing October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC REVIEWED BY SAFEBUILT 11/02/2023 MAINTAIN 1/2 DRYWALL FOR FIRE SEPERATION. Under Truss Sheathing1Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8Roof Framing Plan2Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8Roof Plan3Scale: 1/4" = 1'-0"plan true 0 1 2 4 6 8 Under Truss Shathing4Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8Roof Framing 3D View5Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8Roof 3D View6Scale: 1/4" = 1'-0"nort h 0 1 2 4 6 8 Extend gutter 2'-0" Reinstall existing gutter Reinstall existing downspout Reinstall existing roof vents 5/8" OSB Sheathing across bottom of trusses attach to trusses with 1⅞" long 6d coated nails or equivalent screws 6"oc Opening for attic access panel Double 2x6 at attic access panel3'-0" 1' - 1 0 ½" Ro o f Tr u s s e s T 2 2 4 " o c Pr e - E n g i n e e r e d 2x6 Eave Framing 1'-0" 6:12 Slope Dn 6:12 Slope Dn Overframing - reconstruct existing cricket End Wall Truss T1 Transition Truss T3 End Wall Truss T4 Refer to Sheet A7 for Truss Elevations Simpson H2.5A hurricane clips both bearings of at each truss - typAsphalt roof shingles to match existing - install over mfgr approved underlayment and over Ice and Water Shield at eaves Patch roofing at overframing Install min 20" wide galvanized flashing centered across valleys Reinstall existing gutter 5½" x 12" Gluelam beam 2 A7 Double 2x8 head at door below with (2) king and (1) jack studs each side 10/31/23 Sheet Number A5 Joseph E Calvin Date Sheet Title Structure and Roof Framing October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC REVIEWED BY SAFEBUILT 11/02/2023 South Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 East Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 North Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 West Elevation Scale: 1/4" = 1'-0" 0 1 2 4 6 8 Existing 2-car Garage Existing House RV Garage - existing wall structure, siding, etc. Reinstall existing gutter & downspout New eave construction New roof beyond Maintain overhead electrical surface - Take care with construction in proximity to overhead power lines Maintain existing address numerals New 3'-0" x 6'-8" insulated hollow metal man door with hinges, lockset, threshold, sweep and weatherstripping Siding and trim to match existing Fascias to match existing New foundation See Sheet A4 Maintain existing electric service 12 6 Asphalt roof shingles to match existing - install over mfgr approved underlayment and over Ice and Water Shield at eaves Existing crawlspace access panel Existing house Reinstall existing roof vents Siding and trim to match existing Take care working in proximity to existing overhead electrical Asphalt roof shingles to match existing - install over mfgr approved underlayment and over Ice and Water Shield at eaves Reinstall existing roof vents Reinstall existing east wall construction Reinstall existing gutter Reinstall existing gutter & downspout New 12'-0"W x 13'-0"T insulated overhead door Asphalt roof shingles to match existing - install over mfgr approved underlayment and over Ice and Water Shield at eaves Reinstall existing roof vents Extend driveway width - See Site Plan Sheet A1 Siding and trim to match existing Reinstall existing gutter Reconstruct overframing Reinstall exist gutter 10/31/23 Sheet Number A6 Joseph E Calvin Date Sheet Title Exterior Building Elevations October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC 36" LANDING REVIEWED BY SAFEBUILT 11/02/2023 South Portal Frame2Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6” 3½" 2'-7½"12'-2"2'-7½"3½" 12 ' - 6 " 1' - 0 " 1' - 0 " 1' - 1 0 " 8" Simpson HDU4-SDS2.5 18'-0" 4' - 6 " 18'-0" 1'-0"1'-0" 5' - 0 ⅛" 18'-0" 1'-0" 9'-6"8'-6" 4' - 9 " 4'-2" 14'-0" 3' - 6 " Truss T2 Qty: 15 Truss Elevations Scale: 1/4" = 1'-0" 0 1 2 4 6 8 14 ' ± m a t c h e x i s t i n g East Wall Section1Scale: 3/4" = 1'-0" 0 6”1’-0”2’-0”1’-6”2’-6” Truss T3 Qty: 1 as see from south Truss T4 Qty: 1 Truss T1 Qty: 1 Install purlins across this top edge of truss for eave framing 5½" x 12" x 17'-5"L Gluelam beam 14 ' - 0 " ± M a t c h E x i s t i n g Asphalt roof shingles to match existing - install over mfgr approved underlayment and over Ice and Water Shield at eaves ⅝" structural wood sheathing Pre-engineered roof trusses - see elevations at right Reinstall existing gutter and downspout - install additional eave flashing if gutter does not sufice New 1x8 or cementitious facia board to match existing James Hardie vented smooth soffit board install battens at joints Patch in new sheathing and siding to match existing above wall top plate Simpson H2.5A huricane clip at each truss Recommend new R21 HD FG batt insulation at roof (Garage is not conditioned space) 5/8" OSB Sheathing across bottom of trusses attach to trusses with 1⅞" long 6d coated nails or equivalent screws 6"oc Sheath garage-side face full extent of existing west and reinstalled east wall with ½" OSB sheathing with 8d nails or typeW screws 4"oc at panel perimeter and 12"oc along studs in field Sheath garage-side face full extent of existing west and reinstalled east wall with ½" OSB sheathing with 8d nails or typeW screws 4"oc at panel perimeter and 12"oc along studs in field Recommend Installation of R15 HD FG batt insulation at walls (Garage is not conditioned space) Reinstall existing 2x4 framed east wall along with exterior sheathing and siding, and with existing east window Inspect existing 2x6 sill plate to verify appropriate for reinstallation set on bed of sill sealant w/ anchor bolts and plate washer per Foundation Notes on Sheet A1 New concrete foundation #4 at 16"oc 6" 1' - 6 " alternate direction 2' - 1 0 " 8" (2) #4 cont #4 vert at 32"oc 1'-4" 8" #4 horz atLL 16"oc (2) #4 cont in footing 2" to 3" free-draining gravel 4" thick concrete slab w/ 6"x6" W2.1xW2.1 WWF mid depth & #4 cont at perimeter va r i e s ½" expansion joint mtrl - caulk Approx line of grade See Elevations Sheet A6 Free draining gravel wrapped in geotech fabric 4" perf PVC drain pipe wrapped in geotech fabric silt sleeve - slope 2% Concrete foundation refer to section at right for reinforcing Concrete footing Patch top of foundation wall Drill 6" into side of existing foundation insert #4 x 1'-10" bar with epoxy Drill 8" toto top of existing foundation insert #4 x 1'-2" bar with epoxy (2) anchor bolts with pate washers per Foundation Notes on Sheet A1 ½" OSB sheathing inside and out - refer to notes at right for attachment to plates, blocking, studs and gluelam ½" OSB sheathing inside and out - refer to notes at right for attachment to plates, blocking, studs and gluelam 3½"17'-5"3½" Attach ½" structural sheathing (shown by cross hatching) to perimeter members w/ 8d nails at 3"oc & to intermediate members w/ 10d nails at 12"oc (3) studs at door jambs Attach top plate to bottom of header beam w/ (2) rows 16d sinker nails at 3"oc Attach top plate to bottom of header beam w/ (2) rows 16d sinker nails at 3"oc Attach ½" structural sheathing to face of header beam w/ 8d common or galv box nails in 3" grid pattern Attach ½" structural sheathing (shown by cross hatching) to perimeter members w/ 8d nails at 3"oc & to intermediate members w/ 10d nails at 12"oc Simpson CS14x30" strap tieSimpson CS14x30" strap tie 12 6 12 6 12 6 12 6 Additional blocking may be installed by GC to facilitate attachment of sheathing and siding at roof height transition 10/31/23 Sheet Number A7 Joseph E Calvin Date Sheet Title Sections and Details October 13, 2023 of 7 BU R R O W R E S I D E N C E GA R A G E E X P A N S I O N 10 4 7 M o r g a n S t r e e t Es t e s P a r k , C O 8 0 5 1 7 Pr o j e c t : 2 3 1 2 – B U R R O W R E S I D E N C E G A R A G E E X P A N S I O N F i l e : " / V o l u m e s / P r o j e c t s / 2 3 1 2 B u r r o w G a r a g e / M o d e l / 2 3 1 2 C D . l a y o u t " M o d i fi e d : T u e , O c t 3 1 , 2 3 P r i n t : T u e , O c t 3 1 , 2 3 D r a w n b y : J E C C h e c k e d b y : J E C ©2023 Interstice Architectural Studio, LLC ENGINEERS STAMPED TRUSS PLANS TO BE ON JOB SITE REVIEWED BY SAFEBUILT 11/02/2023 *OPEN HOLE INSPECTION REQUIRED *ENGINEERS/DESIGN PROFESSIONAL STAMPED LETTERS OF INSPECTION REQUIRED *UFER GROUND INSPECTION REQUIRED UNLESS ONE IS EXISTING