Loading...
HomeMy WebLinkAboutPERMIT 690 Big Thompson Ave Floodplain Development 2010-10-01Received Date 2Qo.c1O.oj Town of Estes Park Permit Number 7-cOo2-0 Received By Application for Floodplain Development Permit Name of Applicant ate Address -.Phone S&.9 /9’/ Location of Proposed Development:7 c/e &o/t - Description of Development:fpc.1tpvlJ oIe.,cj-cj4’.iq 7/Jgaip (reidei3tial,non-residential,mobile homd,brige tiiity rosg,etc.) it-irL-1 daeA-t)cS -7tt.Q ‘S7horstm-’ev NOTE:Attach to the application the following information where applicable:Plans in duplicate, drawn to scale showing the nature,dimensions,and elevations of the area in question;existing or proposed structures,fill,storage of materials,drainage facilities;and the location of the foregoing.Specifically the following information is required:(1)Mean Sea Level (MSL) elevation of the lowest floor (including basement)of all structures;(2)MSL elevation to which any structure is floodproofed;(3)certification by a registered professional engineer or architect that the floodproofing methods meet the community floodproofing criteria;(4)a description of the extent to which any watercourse will be altered or relocated;and (5)base (100-year)flood elevation data for a development or subdivision greater than 50 lots or 5 acres. The following is to be completed by the Building OfficiaJJ The proposed development is located in the ,‘Floodway LI Flood-fringe The Base Flood Elevation at the development site is:742.3’feet Source Document:Fi&47 A’M c69 C/ti Y’F ‘,XS fAVpIF 8/P Plan Review MSL Elevation or depth number to which the structure is to be elevated:1v74.feet MSL Elevation or depth number to which the structure is to be floodproofed:A//A feet All necessary information and certificates are attached.LIi’es D No ACTION The proposed development is not in conformance with applicable Floodplain Management Standards (explanation attached).Permit is denied. The proposal is not in conformance with applicable Floodplain Management Standards (explanation attached)and the application is referred to the Board of Adjustment for variance action. I have reviewed the plans and materials submitted in support of the proposed development and find them in compliance with applicable Floodplain Management Standards.Permit is approved. ________ — Date Signature Building Construction Documentation Received The certified as-built MSL elevation of the lowest floor of the structure is feet. The certified as-built MSL floodproofed elevation of the structure is _________ feet Certificates of a Colorado registered professional architect,engineer or land surveyor documenting these elevations are attached.Yes U No Certificate of Compliance Issued:U Yes U No _______________________________ Date Signature 7.0D. FLOODPLAIN DEVELOPMENT PERMIT CONDITIONS OF PERMIT 1.This floodplain development permit is approved as submitted,and does not include any work not detailed on the approved plans and specifications. 2.The Engineer of Record,.#14/P.A SL (/-z’t ,shall be responsible for monitoring all construction activity within the floodway and/or the river channel.Upon completion of approved activity,the Engineer of Record shall submit a letter stating that all such activity was performed and completed in compliance with the approved plans and specifications. 3.This permit does not include the permanent placement of any fill in the river channel,at or below the one hundred year base flood elevation,which would alter existing channel configurations.Such fill requires an individual permit from the Army Corps of Engineers, and Town floodplain development permit. 4.Elevation certificates may be required. 5.Certificates of compliance may be required. 6.The Building Department shall be notified a minimum of two (2)working days prior to any construction activity in the river channel or other floodway. 7.The Engineer of Record,..4 ,shall be responsible for supervising the construction of the pedestrian bridge.The Town shall not issue a building permit nor perform inspections regarding the pedestrian bridge. 8.The General Contractor shall be responsible for contacting the Public Works Department prior to any construction activity in a public right-of-way. 9.The applicant shall read and agree to the previous conditions,acknowledging such by signing and dating below. Applicant:______________________________________Date:. Approved:___________________________________Date:. Building Official Revised 10/29/03