HomeMy WebLinkAboutPERMIT 690 Big Thompson Ave Floodplain Development 2010-10-01Received Date 2Qo.c1O.oj Town of Estes Park Permit Number 7-cOo2-0
Received By Application for
Floodplain Development Permit
Name of Applicant ate
Address -.Phone S&.9 /9’/
Location of Proposed Development:7 c/e &o/t -
Description of Development:fpc.1tpvlJ oIe.,cj-cj4’.iq 7/Jgaip
(reidei3tial,non-residential,mobile homd,brige tiiity rosg,etc.)
it-irL-1 daeA-t)cS -7tt.Q ‘S7horstm-’ev
NOTE:Attach to the application the following information where applicable:Plans in duplicate,
drawn to scale showing the nature,dimensions,and elevations of the area in question;existing
or proposed structures,fill,storage of materials,drainage facilities;and the location of the
foregoing.Specifically the following information is required:(1)Mean Sea Level (MSL)
elevation of the lowest floor (including basement)of all structures;(2)MSL elevation to which
any structure is floodproofed;(3)certification by a registered professional engineer or architect
that the floodproofing methods meet the community floodproofing criteria;(4)a description of
the extent to which any watercourse will be altered or relocated;and (5)base (100-year)flood
elevation data for a development or subdivision greater than 50 lots or 5 acres.
The following is to be completed by the Building OfficiaJJ
The proposed development is located in the ,‘Floodway LI Flood-fringe
The Base Flood Elevation at the development site is:742.3’feet
Source Document:Fi&47 A’M c69 C/ti Y’F ‘,XS fAVpIF 8/P
Plan Review
MSL Elevation or depth number to which the structure is to be elevated:1v74.feet
MSL Elevation or depth number to which the structure is to be floodproofed:A//A feet
All necessary information and certificates are attached.LIi’es D No
ACTION
The proposed development is not in conformance with applicable Floodplain Management
Standards (explanation attached).Permit is denied.
The proposal is not in conformance with applicable Floodplain Management Standards
(explanation attached)and the application is referred to the Board of Adjustment for variance
action.
I have reviewed the plans and materials submitted in support of the proposed development and
find them in compliance with applicable Floodplain Management Standards.Permit is approved.
________
—
Date Signature
Building Construction Documentation Received
The certified as-built MSL elevation of the lowest floor of the structure is feet.
The certified as-built MSL floodproofed elevation of the structure is
_________
feet
Certificates of a Colorado registered professional architect,engineer or land surveyor documenting these
elevations are attached.Yes U No
Certificate of Compliance Issued:U Yes U No
_______________________________
Date Signature
7.0D.
FLOODPLAIN DEVELOPMENT PERMIT
CONDITIONS OF PERMIT
1.This floodplain development permit is approved as submitted,and does not include any work
not detailed on the approved plans and specifications.
2.The Engineer of Record,.#14/P.A SL (/-z’t ,shall be responsible
for monitoring all construction activity within the floodway and/or the river channel.Upon
completion of approved activity,the Engineer of Record shall submit a letter stating that all
such activity was performed and completed in compliance with the approved plans and
specifications.
3.This permit does not include the permanent placement of any fill in the river channel,at or
below the one hundred year base flood elevation,which would alter existing channel
configurations.Such fill requires an individual permit from the Army Corps of Engineers,
and Town floodplain development permit.
4.Elevation certificates may be required.
5.Certificates of compliance may be required.
6.The Building Department shall be notified a minimum of two (2)working days prior to any
construction activity in the river channel or other floodway.
7.The Engineer of Record,..4 ,shall be responsible
for supervising the construction of the pedestrian bridge.The Town shall not issue a building
permit nor perform inspections regarding the pedestrian bridge.
8.The General Contractor shall be responsible for contacting the Public Works Department
prior to any construction activity in a public right-of-way.
9.The applicant shall read and agree to the previous conditions,acknowledging such by signing
and dating below.
Applicant:______________________________________Date:.
Approved:___________________________________Date:.
Building Official
Revised 10/29/03