HomeMy WebLinkAboutPERMIT 2260 Arapaho Rd Porch 2014-08-20Received Date
Town of Estes Park
(30fty%
Permit Number
Received By Lo g-Term Residential Application Building Permit
Application Expires ,1
Permit Ex '
Division of Building Safety 170 MacGregor Avenue P.O. Box 1200 Estes Park, CO 80517
General Information (970) 577-3726 " FAX (970) 586-0249 • www,estes.org
NOTE: Use this Form for Long-term Residences 30 days or more.
ob Address:
—77.0
Lot: A Block:_k) Subdivision:
Owner Name: e.-,e211,7,/
Address: ::-,::2- (:, 6 4 raf:,,.„410 kiii2,..44 o tii-iii4Siiie.ic i'"ilt....,i'lii
City) (State)
Contractor: .;--t3+- /1:7 „..:FfL,..,' i Cl- 4.— LSI Town License #:
Address:
Condo: No 0 Yes; Lot Size: sfiac
Parcel #: - CV 2
Phone:
(Street)
7
(Zip Code)
Phone: ri Ze""' 2
(Street) (City)
Email address QUIR ED): I "''' •y
The Following Applies to New Work Only — Complete all that apply: 0 New Buiiding 0 A(teraton 0 Addition Master Plan#
(State) (Zip (Zip Code)
uilding Uses): Bi Owner / Residence
Existing use: Proposed use:
ewer: Estes Park Sanitation EL Upper Thompson Sanitation
Plumbinejnvolved: No 0 Yes —State and Town Licenses Required; Plumbing Fixture Worksheet Required,
Fixures 0 Add 0 Relocate 0 Replace 0 Demolish Water Service: Existing 0 New - # of Meters:
Eteetric
volve
0 Rental —30 days or more 0 Accessory Dwelling
_ '
..... St of New Dwellings: ; # of New Kitchens:
,
0 Private. Septic — Requires Applicant to first:. go to the Health Department,
Meter Size:
No 0 Yes — State & Town License Required. State Permit. and Inspection Required. Temp Meter:
vie; 0 Existing 0 New ID Overhead 0 Underground # of Meters.: Meter Size: amps; Phase
pe af Heat:
LI" ding 'ght:
Ft
ob 0escription:
Gas
_
#Fc
Unfin
Furnace
Boiler
, Yes
Voltage
Fuel Gas Involved: 0. No 0 Yes — Qualifications and System Sizing Required.
Type: 0 Natural Gas 0 LPG 0 of Gas Appliances / C)utlets:
or is
Fin _
Unfin
(sf) Garage / Carport (sf) Porch w/ Roof
Fin ' Attached _ (sf)
Unfin Detached
Total Valuations (Labor a
irt4 144.K.11 iii./;(1") ) $
sf)
inches
o Raot
have stibtriitted the Minimum Submittal C. etklist for Residential Cok'truction .2009 IRC with this. application.
certify this application is true and correct and agree to perforrn the. work described according to plans/specifications submitted, reviewed and approve124ind compOsvvith
loral rdinances, state and federal taws as well as building codes: I certify that have the property owner's. authority and permission to apply for thrl;p4rnniiihikttfon/aRy,
UNDERSTAND THAT I AM RESPONSIBLE FOR ANY FEES OR EXPENSES INCURRED FOR PLAN REVIEW, PERMITS, INSPECT@ONS AND OTHER FEESA'SSOATED*ItH THIS
APPLICATION, Contractor 0 Owner 0 Owner's Agent
Signatu
b Description:
if4 /gE,//i ,!;•A/7 12(p
'
C
Date
Print Name
**•* Office Use Only
Applicable Code(*.
15r
upant Lot()
/ion.„„/
Variances:
Front
Setbacks
Type of Const. Occupancy Cliass(esK
FOon.r LoarJ(.s: Roo Loacl:
Side Rear River
Zoning ensiis 4 Hazards Geo Wildfire Flood
BuddingsOffisial ,/ iro iiri" -
Daze
,„./..
ereiii""/44/. —
JL
er
Light &Power
Planning
Building
ew
County "Fax
Cert of Occupalp "rro,
total
64.1/
/4" re3
ItyII<esi,;..tem GO, HiltIldlitg Pt°11W4q 0,101,!;..44:11110 P¢,11141.1.4 20 V ,\ PI)10
K
R-3 /U4 RESIDENTIAL PERMIT INSPECTION
B ADDRESS: 22(,0 "47,€,Q-A‘,0
)WNER: (749/(0.4/
CONTRACTOR: ye
RECORD
PERMIT #: 132 - 7/5
PHONE #: 970 2./5 -455-0
PHONE It: 9X, -
-SCR I PTION OF WORK: 7widia-24ap9e_ ,106.72,,9,,A2S773Ef2C1Aer Pe2e-Ce4-1
LIJRE TO COMPLY WITH ANY OF THE REQUIREMENTS ON THE FRONT ()L THIS CARD MAY DELAY INSPECTIONS
FOUNDATION SYSTEMS /
SITE REQUIREMENTS
UFER GROUND FOOTING
-R1-309F-1 I : lt-RS
SETI3 AUKS - HELD INSPECTION
/SETBACK CERTIFICATE, FOR PLANNING
FOUNDATION WALL
U
UFER GROUND FOUNDATION 'WALL
ELEVATTON - FIELD INSPECTION
ELEVATION CERTIFICATE FOR PLANNING
DAMP PROOFING / WATER PROOFING
FOUNDATION DRAIN
RADON SYSTEM PASSIVE ONLYINTERIOR
PADS / FOOTINGS
UNDERGROIJND WATER SERVICE
P1 UMI31NG UNDERSLAB
FOUNDATION WALL INSULATION
HYDRONIC SYSTEM UNDERSLAB
I 3NDERSLAB INSULATION
SEWER (SANITATWN DEVI
EX°FERIOR MEMBRANE SYSTEMS
:HEAR WALLS / HOLD DOWNS
ATER RESISTIVEBARRIER
AIR INFT.LTRATION BARRIER.
/INF W INSTALLIFLASPIING
STUCCO / STONE .LATH MIDROOE
GAS PIPING ROUGH
FILIE VENTJNG ROUGH
DUCT .ROUGH
PLUMBING ROUGH
FIREPLACE ROUGH
ROUGY.
HYDRONIC PIPING
FIRE BLOCKING / FIRE STOP
FRAMING
DRYWALL
RAFTER / WALL / FLOOR INSULATION
SHOWER PAN LINER
TOWN AND NON TOWN ENTITIES APPROVAL FOR OCCUPANCY / USE
ELECTRICAL FINAL
SANITATION DEPARTMENT
PUBLIC 'WORKS
PI..„ANNINGDEPARTVIENT____
WATER DEPARTMENT
CC. INTY 'WILDFIRE
LIGHT & POWER.
PLUMBING
ROOF FINAL.,
EVDC
FIRE DEPA.RT" ENT
1. 1VISION OF .BUILDING SAFETY FINAL APPROVALS
HVAC FINAL
BUILDING FINAL
EPMC
14•50.1VM0.11.11.10.M11411,
PO "ANT TELEPHONE NUMBERS
.s • ection. Rec ues 970-577-3731
aiming Div 970-577-372 l
Building Safety970-577-3722
EP Sanitation 970-586-286 )
Utility. Locate 800-922-1987'
Xcel
800-772-7858
Water .Depart 970-586-3608 State Electrical 970-577-3589
Public Works 97 -577-3588
UT Sanitation
Fne De
97 -5. )-4544 .2ount
ildfiie
970-577-0900
97 -498-5. ).
X:\BuildingDept\Forrns'\ A •Ul_SIGN-OFF-CARD.docx
T
A
PE IT INSPECTION CA
INSPECTION
'T LINE 970.577-3731
L INSPECTION REQUESTS MUST BE MADE BY 4:00 PM THE PREVIOUS WORK DAY,
2., FAILURE TO COMPLY WITH ANY OF THE REQUIREMENTS MAY DELAY INSPECrrIONS.
3. Each contractor shall have a business license from the EP Town Clerk prior to beginning work.
4. Toilet facilities shall be provided for construction workers.,
5. Site housekeeping shall be maintained. Inspections may he denied conditionsare deemed unsafe.
6. Do not request any construction inspection more than 1 business day out.
7. Partial inspection requests are acceptable.
8. Inspection requests can specify a two hour window but will not be guaranteed, except for concrete.
9. This card and the permit must be posted on the job site for all inspections and protected from the weather.
10. The temporary site address must be with the permit box and visible from the public right of way.
11, Town approved plans and inspection record sign off card must be on the job site for all inspections.
12. All work shall be performed and completed in strict compliance with the approved plans. The designer of record
and the building official shall approve any and all changes or revisions.
13. If an unapproved change is identified the inspection may be terminated immediately.
14. Work shall not proceed until the inspector has approved the necessary inspection.
15. Setback inspections will not be performed by the Town unless all lot comers are. clearly staked.
16. Foundation wall inspections will not be performed until a setback inspection has been approved.
17. A stamped letter from a professional land surveyor / engineer' may be required at foundation wall inspection,
18. The appropriate sanitation district must be contacted to make taps and "sewer service line" inspections.
19. The Town Water Department must be contacted to make water taps,
20. Electrical permits and inspections are provided by the State. Inspection approvals shall be signed on. this card,
21. Permit applicants are responsible for assuring safe access to the inspection site.
72. All equipment. and appliances shall be installed per their listings and the manufactures specifications.
23. Manufacturersinstallation instructions and applicable documents shall be provided before, or at rough inspec
24, installation instructions and other applicable documents shall be available for all inspections,
25. Ladders provided for inspection access shall meet OSHA regulations for type, size and use.
26. Do not call for a final inspection until the contractor affidavit has been approved by the Municipal Clerk,
27, The permanent address shall be illuminated or reflective and comply with R31931 Amended.
28. Failure to request final inspections and meet all permit conditions may result in legal action being taken.
29. All fees must be paid prior to requesting final inspections,
30. A final inspection will not be. done until the contractor affidavit has been accepted by the EP Town Clerk,
31. Different departments have different lead time for inspections. Their final approvals (when required) must on the
front of this card (see TOWN AND NON TOWN ENTITIES APPROVAL FOR OCCUPANCY/USE).
32. A re -inspection fee may be assessed when: 1) Inspection card and permit card are not posted: 2) The approved
plans are .not available.; 3) Access to the site is not provided for the inspector; 4) Inspections are requested prior to
the work being ready; 5) Previous corrections are not properly made; 6) Unapproved changes to approved plan.
Additional inspections will not be made until re -inspection fees are paid ind the receipt is with this inspection card,
KIBuildingDept\Forrns\R3-U1_SIGN-OFF-CARD.docx
i
Cr)
n(
b
m
x
U
re
N
LLI
Date Requested ILli
Date Inspected
JOB ADDRESS
REQUESTED BY
CONTACT INFO.
TYPE OF INSPECTIONS
/ -- C) aL ? )11-s E C Ayr-1-6-f) PF_
f�ft)3 pe___ 6 r.
oirf Permit#
Inspector
TOWN OF ESTES PARK
Building Division
i
TOWN LIC. #
to at4A-
WORK SHALL NOT PROCEED UNTIL APPROVED
When corrections have been made, call for re -inspection: 970-577-3731.
General questions: call 970-577-3726.
$100.00 Re -Inspection Fee Assessed [
Sr . 1 . 201 12:32114
Received Date"
Received 8'
Town of Estes Park
Application for Building Permit
Department of Building Safety 170 MacGregor Avenue P.O. Box 1200 Estes Park, CO 80517
General Information (970) 577.3726 • FAX (970) 5011-0249 • www.estes.org
No.107 P. 1
Permit Number 9 -1 1 3
Job Address: 7_' ..o cv6,.\ J \L 0 C,ek_ Lot Size: _ sf/ac
Lot _Block: ,Subdivision: -t'Y Zteark...LCACLO,AJ r
Owner Name: CA -Wu •e-- ,Q f Phone: f21 S — k s Z
Address: Z'.\'° A obiC1, 0 1�G,G` V. f`s Qc11L, Co kooS 1--1
Street (City) (State) (Zip Code)
Contractor: t \s�A\S Town License 11; Phone:_
Address, . -11 - '&..t ' 11 FLU OrGt1Lt. Go bog
IS
(Street) (Gty) (State) (Zip Code)
Parcel 0:
Approval on non Town entities Is the responsibility of the permit applicant. Please obtain the appropriate approval(s) of the
following authorities, as advised/highlighted by the Building Official. Each authority will have Its own requirements, policies
and procedures, and fees which are distinct and separate from Municipal requirements and fees. Permits will not be issued
prior to obtaining required approvals.
1, SANITATION DISTRICTS
Upper Thompson Sanitation District
Estes, Park Sanitation
❑ New Construction
❑ Adding, Relocating or Vacating Plumbing Fixtures
RAddlng Square Footage to Existing Building Footprint
Adding; or Vacating Septic System
0 Sand/OII Interceptor/ Grease Interceptor
kAMQ1.;-b5c1- \Wee-) gl I C C-1
pproved Date
2. LARIMER COUNTY HEALTH DEPARTMENT
❑ Curnmerciai Food / Drink Preparation
❑ Alcohol Sales (On Premise)
❑ Day Care (G Dr More Children Under Age 18)
❑ Septic System
[] Sewer Lift Stations
▪ Public Swimming Pools / Spas / Hot Tubs
Approved
Dale
3. ESTES VALLEY FIRE PROTECTION DISTRICT
CI
Approved
SANITATION COMMENTS;
filial ials v, . C,l •��
Date.
Note: New Interior Grease Traps are prohibited by the
Building Department and the Health Department.
HEALTH DEPT. COMMENTS:
FIRE DISTRICT COMMENTS::
\ Wien\Chaskka PhiilipslDeskt. " imitation. Hcalth, Piro Approval l:omi.doc Page 2 Revised 11Po2111111- KT