Loading...
HomeMy WebLinkAboutPLANS 500 Big Thompson Ave Columns 2005flue 23 05 0:00a Steve Lane 970.506.914S p.1 (ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS PROJECT:AROf1TEC1S SUPPLEMENTAL Town of Est.es Park Visitor Information Center IN$TRUCflON NO:5 500 Dig Thompson Avenue Estes Park,CO 80517 OWNER:ARCHITECT: Town of E.stes Park Basis Architecture P.C. TO: Dailman Construction Company CONTRACT DATED: June 27k,2005 The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these insbuctions indicates your acknoviledqement that there will be no change in the Contract Sum or Contract lime.If there will be an impact to Contract Sum or Contract Time,please intbmi the Architect in wribng within seven (7)days. Description: At the double log columns north ot the airlock,provide a caisson with an 18”X 30 base 36 deep,with a spread top 3Cr X 5Cr.Provide (5)#4 bars horizontal and (5)pair of #4 bars vert, similar to detail E-E/S2.0. At all other column locations to Include a stone pier above,provide a caisson per detail E-E/S2.0 with top dimensions 30”X 30’. Attachments: ISSUED BY: MaUhew frielser Date 8asis Arrhitecture P.C.