HomeMy WebLinkAboutPACKET Transportation Advisory Board 2024-06-26 June 26, 2024 TRANSPORTATIONADVISORY BOARD 12:00p.m. Town Hall | Room202 REGULARMEETING AGENDA 12:00 pm Public Comment(packet) 12:05 pm Trustee Liaison Update Trustee Igel 12:10 pm Approval of Minutes dated April 17, 2024and May 15, 2024(packet) 12:15 pm Downtown River Corridor Study (June 12 Presentation) Engineer Waters 12:40 pm Parking & Transit Updates Manager Klein a.2024 Season Rollout b.2024 Transit Season Grants c. Bustang to Estes Service 12:50 pm Engineering Updates Engineer Wittwer a.Graves Avenue Safe Routes to School Project 1:00pm Administrative Updates Director Muhonen a.2025 Provisional Strategic Plan Transportation Goals & Objectives(packet) b.2025 Capital Improvement Plan Priority Discussion (packet) c. TAB Bylaws Revision (packet) d.Big Horn Parking Structure Design e.Downtown Estes Loop Construction f.CDOT US 34/36 Overlay Project 1:30 pmUpdate on Past Public Comment 1:55 pmOther Business Adjourn 1 2 3 This is an urgent request to address the issue of speeding on Fish Creek Rd from the north end at Hwy 36 to the south end at Hwy 7. There is noticeably more traffic on Fish Creek Rd than ever before. One possible reason may be that GPS is routing traffic away from the downtown area due to the ongoing construction. Many of us who live on or near Fish Creek Road are concerned about drivers who ignore the posted speed limits of 35 mph from Hwy 36 to Little Valley Rd, and 30 mph from Little Valley Rd to Hwy 7. I timed myself traveling the distance from the first posted speed limit sign of 30mph at Little Valley Rd to the blind curve south at my property line of 2851 Fish Creek. On Thurs, May 23, I compared the times it took 55 vehicles to travel that same distance over a period of 2 hours. This was a light traffic time and day. The average speed of all vehicles was 38.40 mph. Breakdown of vehicle speeds in the 30mph zone: 2 vehicles @ 60mph+ = 4% 6 vehicles @ 50mph+ = 11% 14 vehicles @43mph = 25% 20 vehicles @ 37mph+ = 36% 7 vehicles @ 33mph+ = 13% 6 vehicles @ 30mph = 11% One additional note: as I observed the traffic on Fish Creek Rd, I saw a number of vehicles that ignored the stop sign at the bottom of Little Valley Rd ). 4 The frequent and excessive speeding is extremely dangerous to residents on and near Fish Creek Rd; to the drivers and passengers of all vehicles on the road; to the pedestrians and cyclists who travel on the Fish Creek Trail; to the cyclists riding on Fish Creek Rd, particularly where there is no shoulder and on a blind curve; to the abundant wildlife that frequent the area. There are also aggravations such as the higher noise level of speeding vehicles and increased pollution. Methods toensure compliance might include: Frequent surveillance/ticketing by City, County and State enforcers Cameras to record speed and license plate numbers Flashing speed limit signs Warning signs to create awareness of cyclists on the road, especially before blind curves . Please contact me if I can be of help. Please leave a message at 970-586-4948 or, Email me : carolmyers1949@msn.com Carol Myers 1208 Rambling Dr Estes Park 5 6 Town of Estes Park, Larimer County, Colorado, April 17, 2024 Minutes of a Regular meeting of the TRANSPORTATIONADVISORY BOARD of the Town of Estes Park, Larimer County, Colorado. Meeting held in the Municipal Building in said Town of Estes Park on the 17thday of April, 2024. Board: ChairBelle Morris; Vice-ChairKristen Ekeren; Members Jessica Ferko, Larry Gamble, Linda Hanick, and Mark Igel; Trustee Patrick Martchink; Staff Liaison Greg Muhonen Attending:Chair Morris; Vice-Chair Ekeren; MembersGamble,Hanick, and Igel; Trustee Martchink; Director Muhonen;Engineer Bailey; ManagerKlein; Manager Pastor;Recording Secretary McDonald; Paul Hornbeck, Community Development; Joan Hooper, Public Attendee; William Oster, Public Attendee Absent:Member Ferko Chair Morriscalled the meeting to order at 12:06 p.m. PUBLIC COMMENT Chair Morris read the two Public Comment Forms submitted by Joan Hooper (Resident, Public Attendee) regarding pedestrian safety concerns in construction zones and downtown traffic congestion from private vehicles. Discussion points included the need to accommodate downtown parking, particularlyfor eastbound drivers; the standard practice for construction contracts to address pedestrian accommodations;andthe confusion caused by temporary crosswalks, which could be alleviated by adequate signage and staffing at crosswalks and intersections. Director Muhonen will continue to work with the Downtown Estes Loop (DEL) contractor, Flatiron Construction (FCI),to address pedestrian safety concerns related to DEL construction. TRUSTEE LIAISON UPDATE With Trustee Martchink’s term expiring, he and TAB members exchanged mutual appreciation for his service as Trustee Liaison. APPROVAL OF MINUTES DATED FEBRUARY 21, 2024 It was moved and seconded (Gamble/Hanick)to approve the February 21, 2024, minuteswith a minor amendment, and it passed unanimously. PARKING& TRANSITUPDATES Manager Kleinreported that planning continues for the launch of the paid parking and transit seasonthat runs May 24-October 20, 2024. The reduced operational budget for transit will require some schedule modifications for the Gold and Silver Routes. The Brown Route will stop at the newly reopened Estes Park Aerial Tram; the Gold Route will 7 Transportation Advisory Board – April 17,2024 – Page 2 now stop at the Stanley Home Museum and Education Center. Manager Klein will be meeting with the YMCAof the Rockiesto discuss their transit service needs. The Car Park’s (TCP) new parking permit portal—updated for users nationwide and focused on monthly parking options—is still being refined to accommodate the Town’s seasonal parking permit needs. TCP also conducted a massive purge of duplicate registrations, primarily for the Town’s Local Permit holders. Bustang to Esteswill continue to offer its Saturday and Sunday service on US 36for $15 per riderfor the duration of the 2024 paid parkingand transitseason. Promotional materials will be accessible at the Estes Park VisitorCenter, and the service will befurther marketedon radio and in print throughout the region. The US 34 Transportation Management Organization (TMO) continues to develop and has been named GoNoCo. Board membership will feature 15 directors representing local agencies (9), the private sector (5), and the Colorado Department of Transportation (CDOT; 1), with Manager Klein representing the Town. The Electric Trolley Facility project will be discussed at a meeting later today.The Peak will offer Special Event service for the April 20 Bigfoot Days Festival.Manager Klein will present on the Town’s electric vehicle (EV) trolleys and EV charger program at the Community Roundtable on Sustainabilityeventto be hosted at the Estes Valley Community Centeron April 22. Discussion points included how hotels and local attractions can promote The Peak to their customers; parking kiosk relocations and the plan to place an additional kiosk in 2025; and the value of TAB member presence at the April 10 DEL Public Meeting. ENGINEERING UPDATES Engineer Baileyreported great progresson utility relocations in recent days for the Cleave Street Improvements (CSI) project. The Town’s Power & Communications team can now begin its work on April 23. Reclaimed asphalt pavement should be placed by June 30, allowing a clean pause for the project through early fall. Three bids for the Graves Avenue–Safe Routes to School(SRTS) project all came in over budget. Thanks to the “yes” vote to continue the 1A sales tax through 2034, Public Works staff is working with Finance on a budget amendment to ensure, with Town Board approval, that Town funds will cover construction of both sides of Graves Avenue. With construction starting in early June, the project should be completed before school resumes in August. There was brief discussion about the need for pedestrian crossing signage at business driveway access points. The Steering Committee for the 2045 Master Transportation Plan and 2030 Transportation Development Plan (MTP-TDP) will meet soon, with a public outreach meeting to follow. Kimley-Horn continues to report activity on the online map and transit survey tools. 8 Transportation Advisory Board – April 17,2024 – Page 3 The Visitor Center Parking Lot Redesign project is moving forward, with Kimley-Horn developing design alternatives for the TAB to discuss in May. Discussion points included the project’s goals of ensuring a functional, safe space for both transit and pedestrian activity; options for EV charging and micromobility; the recommendation that several concepts for the parking lot design be offered; and the ongoing problem of safely crossing US 34,for which options could be developed in the 2045 MTP. ADMINISTRATIVE UPDATES Director Muhonen summarized suggested revisions to the TAB bylaws regarding the meeting scheduleand number of members; any changes would requireTown Board approval. Discussion points included the possible language change from “regular” to “convened” meetings; the benefits of a consistent meeting timeand frequency; how the TAB can preserve its value and commitment to being the “voice of the people,” which helps to attract new members; the possibility of meeting together at any time as a public group, which need not be defined by bylaws; and whether a minimum or maximum member count should be established. Trustee Martchink advised that many of these details had recently been discussed by the Town Board. It was agreed that any change to the bylaws resulting from this discussion would be made by Director Muhonen and submitted directly to the Town Board for approval. Director Muhonen reminded the TAB that the current and future transportation spending decisions made by Public Works staff are guided by the Town’s Strategic Plan, Capital Improvement Program, and budget; therefore, relevant excerpts of these documentsand the Master Trails Planwere provided in the current packet for the TAB to review and discuss. Priorities could be established by staff for TAB endorsement, or TAB members couldrecommend to staff what the community considers priority.It was agreed that TAB members would bring their written recommendationsto the May meeting, so that staff could incorporate their input into the Public Works funding request in June.There was brief discussion about factors that influence the Town’s annual pavement condition index (PCI). Manager Pastor was introduced as the new Public Works Project Manager, and he briefly explained the Big Horn Parking Structure ideas to be discussed at the May 14 Town Board Study Session. Discussion points included expanding the structure with two additional levels with different access points; the Estes Park Housing Authority’s (EPHA) interest in developing the fourth level for elevator-access housing; and the opportunity to expand downtown living as envisioned in the 2018 Downtown Plan. TAB members were encouraged to sign up for the DEL project email updates and access the public meeting recordings using the project website link in the agenda. Director Muhonen will talk with Flatiron Construction (FCI) about maintaining a project completion percentage on the project website. TAB members were also encouraged to sign up for the CDOT US 34/36 OverlayProject email updates using the project website link on the agenda. 9 Transportation Advisory Board – April 17,2024 – Page 4 Director Muhonen congratulated Manager Klein on his selection as the Town’s new Parking & Transit Manager, effective March 24. UPDATE ON PAST PUBLIC COMMENT See Public Comment item above. OTHER BUSINESS Member Hanick updated the TAB on her discussion with the Estes Park Newcomers Club (EPNC) regarding a volunteer crossing guard program for kids crossing Colorado Highway 7 (CO 7). She was advised that the EPNC volunteer coordinator position is transitioning, but that the group affirmed interest in coordinating thispilot program. There being no further business, Chair Morris adjourned the meeting at1:53 p.m. Lani McDonald, Recording Secretary 10 Town of Estes Park, Larimer County, Colorado, May 15, 2024 Minutes of a Regular meeting of the TRANSPORTATION ADVISORY BOARD of the Town of Estes Park, Larimer County, Colorado. Meeting held in the Municipal Building in said Town of Estes Park on the 15th day of May, 2024. Board: Chair Belle Morris; Members Jessica Ferko, Larry Gamble, and Linda Hanick; Trustee Mark Igel; Staff Liaison Greg Muhonen Attending: Member Hanick; Trustee Igel; Director Muhonen; Engineer Bailey; Manager Klein; Engineer Waters; Manager Pastor; Recording Secretary McDonald; Anthony Pratt, Presenter (Kimley-Horn); Kristen Ekeren, Public Attendee, Joan Hooper, Public Attendee Absent: Chair Morris, Member Ferko, Member Gamble Due to the absence of chair and a lack of quorum, the Transportation Advisory Board meeting adjourned at 12:16 p.m. Guest/Consultant Anthony Pratt of Kimley-Horn was invited by the attendees to share his originally scheduled presentation on the Visitor Center Parking Lot Redesign and the 2045 Multimodal Transportation Plan & Transit Development Plan. /s/Lani McDonald, Recording Secretary 12 11 13 Circle.MatthewofreconstructiontheComplete2.A.22034.bynetworkstreet Towntheforgreateror80ofIndexConditionPavement averageaninresultwilleffortsrehabilitationStreet2.A. CARRYOVER)(2024Drive.ViewFartoAvenueProgram.SignageWayfindingtheImplement1.C.community. MorainefromAvenueElkhornWestofrehabilitationtheComplete2.A.1 ourforstreetsofnetworkqualityhighamaintainwillWe2. 2.PhaseSignageWayfindingDowntownConstruct/Install1.C.1improvements.transportation multimodalfundinginassisttomechanismslieuinfee andfeesimpactadoptingofpossibilitytheEvaluate1.B. projects.2034.throughapprovedfundingtaxsalesdirectedutilizing network.transportationmultimodalefficientandaccessible, reconstructiontrailSH7andUS34theof(design)1PhaseComplete1.A.1standardsdisabilityandsafetyadoptedwithcomply sustainable,aofmaintenanceanddevelopmentthevalueWe1. tonetworktrailpublicourmaintainandUpgrade1.A. riders.transitandmotorists,cyclists,pedestrians,forsystemstransportationmultimodalmaintainedwellandefficient,safe,haveWeTransportation consideration. underprojectthetotailoredappropriatelyispackagefinancing eachthatensuringbasis,casebycaseaonprojectscapital largeforstrategyfinancingeffectivemosttheconsiderwillWe3. decisions.financialdrivendatamakeWe2. future.theindevelopmentetc.vacancies,toapproachbudgeting budgetguidehelptopoliciesbudgetgeneralofsetaFinalize1.B.1funding,timeoneofusepolicies,reserveofconsideration includeshouldThisfuture.theindevelopmentbudget guidehelptopoliciesbudgetgeneralofsetaDevelop1.B. 2025.ofendthebysystem2025.bysystem(ERP)PlanningResourceEnterprise Board.theofphilosophyfinancialthereflectthat (ERP)PlanningResourceEnterprisetheofimplementationtheComplete1.A.1modernawithsystemaccountingcurrenttheReplace1.A.controlsandtools,policies,financialdatetoupmaintainWe1. emergencies.unanticipatedandneedsfutureforreservescashadequateincludingrevenues,availablewithexpendituresbalancingcondition,financialsustainableandstrongamaintainwillWeHealthFinancialTown economy.localtheandbusinesseslocaloursupport activelywillandlocallyshoppingofbenefitstherecognizeWe7. organizations.otherby ledeffortsdevelopmentworkforceandeconomicsupportWe6. areas.commercial Town'stheofallinrevitalizationandinvestmentsupportWe5. downtown.viableeconomically andattractive,vibrant,aofimportancetherecognizeWe4. 14 customers.andcommunityourservinginfrastructureutilitydatetoupandefficient,reliable,haveWeInfrastructureUtility 2025.Q4incommencetoconstruction foradvertiseandSegmentFinalTrailRiverFalltheofdesignComplete8.C.1 2025. Q4inconstructionforadvertisesource,fundinggrantotheror(SRTS)School toRoutesSafeathroughfundedIfUS36).andAvenueManfordbetweenDrive Communityofside(eastTrailUseMultiDriveCommunitytheDesign8.B.1 3.Phase entities.otherwithpartnershipinValleyEstesthein implementingtopriorPlanManagementParkingDowntowntheof4Phase connectivitytrailandsidewalkmaintainanddevelopwillWe8. ofimplementationforplantobeginningofconsandprostheEvaluate5.A.3 ).ratesand/orlotsparking funding.grantandfunds,spaceopenfunds,expansion paidofexpansion(includinglotparkingHornBigtheatstructureparkinglevel trailavailableusingTrailRiverFalltheComplete8.C. 3aforservicedebtannualthecovertoneededoptionsfundingEvaluate5.A.2 Objective)year(Multilot.parkingschools.publicParkEstesofmile planning.transportationallinstructures,parking HornBigtheatstructureparkinglevel3aconstructandfundingIdentify5.A.1onewithinnetworkfacilitypedestrianandbikeconnected ofrepurposingandvehiclesautonomousandelectricincluding functionallyabuildanddesigntofundingObtain8.B.changes,technologyofimpactspotentialtheconsiderWe7. Drive.SteamerandAvenueWonderview Plan.Trails betweenAvenue)Thompson(BigUS34onimprovementstransportation MasterValleyEstestheinprioritiestheImplement8.A. multimodalneededidentifiesthatstudycorridoraforfundinggrantSeek3.E.1 CARRYOVER)US36.andUS34alongoptionstransitregionaladditional system.transportation (20242026.inimplementationandbudgetingforPlanTransportationevaluatetopartnersotherandCDOTwithWork6.A.andparkingTown'stheextendandstrengthenthatpartnerships Multimodal2045thefromrecommendationsspecificSelect3.D.1 nationalandregional,local,leverageandidentifyWe6. options.connectivitytransitregionalenhancetoOrganizationManagement2030.byprogramsustaining TransportationGoNoCo34creatednewlytheandRTDwithCollaborate3.C.2selfaasservicesparkingdeliversthatmannerain PlanManagementParkingDowntowntheImplement5.A. CARRYOVER)(2024Plan.DevelopmentTransitthefromrecommendations assets.transportationandparkingTown'sthe oneyearthefortimelineimplementationancreateandfundingSeek3.C.1Drive.SteamerandAvenueWonderviewbetween ofsustainabilityenvironmentalandfinancialthepromotethat 34USonimprovementstransportationmultimodaldeliver technologyininvestmentsdrivendatastrategic,considerWe5. tostudycorridoraimplementandcommission,Fund,3.E. Loop.EstesDowntownthePlan.TransportationMultimodaltheImplement3.D. ofcompletionuponimpactsbusinessandflowtrafficevaluatingBegin3.A.1 CARRYOVER)(2024 service.transit options.transportationandparkingTown'sthe project.installationserviceandmainwaterthefollowingfacilitiespedestrian regionalandlocalroundyearforpotentialtheExplore3.C.aboutguestsandresidentswithcommunicateeffectivelyWe4. compliantADAprovideandStreet2ndofreconstructiontheComplete2.A.5 CARRYOVER)(2024Project.ImprovementsStreetCleavetheComplete2.A.4Improvements.MultimodalAvenue Morainetheofconstructionandclearance,environmental design,theforstrategiesfundingDevelop3.B. ParkwaySteamerofreconstructiontheComplete2.A.3Town.thethroughout Town.thethroughoutsafetypedestrian solutionsmultimodalwithcongestiontrafficmitigate andtrafficimproveandcongestiontrafficaddresswillWe3. topartnersStateandFederalwithCollaborate3.A. Stormwater Management Program Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / StormwaterNew Division:Capital Type: 30 Infrastructure Duration(Years):Board Goals: 2030 Estimated Start: 40 Useful Life(Years): $545,000 Annual Change in O&M: Throughout Estes Valley Development Code Area Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $111,320,000$22,264,000$16,698,000$2,227,000$16,698,000$7,793,000$0$177,000,000 Funding Sources NANANANA Unknown Total $177,000,000$0$0$0$0$177,000,000 All costs per SWMP.Annual O&M =$545k.Funding is dependent on establishing revenue streams(e.g., Funding Details: grants, sales tax, user fees).A dedicated sales tax may be possible via a stormwater initiative in 2024. Project Description and Justification The Stormwater Management Program will implement the O&M and capital recommendations of the adopted Stormwater Master Plan.Forming a Stormwater Utility(SWU)is critical to successful implementation(see2023Strategic Plan Obj. I.5.B.1).Generally, priority is a three-pronged approach:annual O&M; neighborhood drainage projects; and, larger projects (downstream to upstream).With no SWU, implementation will be piecemeal with decreased efficiency and effectiveness. Sheet 9 of 136Page 42 of 169 16 Community Drive Multi-Use Trail (North Segment) Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 2 Transportation Duration(Years):Board Goals: 2025 Estimated Start: 20 Useful Life(Years): $1,000 Annual Change in O&M: Community Drive, US 36 to Manford Avenue Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $600,000$100,000$100,000$0$160,000$0$0$960,000 Funding Sources NANANA State Grant orCommunityTotal LoanReinvestment $700,000$260,000$0$0$0$960,000 Costs per RMS grant application submitted Feb2022(plus inflation contingency).RMS2021not awarded Funding Details: Funding is dependent on that future grant award.Funding splits between LCOS and CRF TBD.Existing1 Trails program expires in2024. Project Description and Justification Trail extension along Community Drive, from the trail underpass at US36to the existing school sidewalks along Manford. Improves trail network connectivity with existing trails near the school campus.The2023Strategic Plan includes Obj.T.7.A.1 for the design of this trail if funded by the2022CDOT Revitalizing Main Street grant. Sheet 10 of 136Page 43 of 169 17 Community Drive Multi-Use Trail (South Segment) Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 2 Transportation Duration(Years):Board Goals: 2025 Estimated Start: 20 Useful Life(Years): $1,000 Annual Change in O&M: Community Drive (Graves Avenue to Brodie Avenue) Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $480,000$96,000$90,000$10,000 $50,000$110,000$0$836,000 Funding Sources NANANA State Grant orCommunityTotal LoanReinvestment $500,000$336,000$0$0$0$836,000 Funding is dependent on a future grant award.A CDOT SRTS grant application is anticipated for Q3 2024 Funding Details: Funding splits between LCOS and CRF TBD.Existing1A Trails program expires in 2024. Project Description and Justification Reconstruct existing asphalt path for children biking and walking to school.Improves trail network connectivity with existing trails near school campus.Compliments the Brodie Avenue Safe Routes to School(SRTS)funded project(trail south side)and the in-design SRTS project on Graves Avenue Sheet 11 of 136Page 44 of 169 18 Crags Bridge Rehabilitation Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 2 Transportation Duration(Years):Board Goals: 2026 Estimated Start: 10 Useful Life(Years): $1,000 Annual Change in O&M: Crags Drive over the Big Thompson River Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $410,000$82,000$65,000$4,000$84,000$0$0$645,000 Funding Sources NANANANA CommunityTotal Reinvestment $645,000$0$0$0$0$645,000 Possible sales tax funding with 1A STIP initiative renewal in 2024? Funding Details: Project Description and Justification 1of3bridges identified as needing significant rehabilitation via CDOT Off-System Bridge Inspection.Potential replacement in years via Stormwater Management Program if implemented.The other two bridges:Ivy Bridge has been replaced by DELoop; Rockwell bridge proposed to be replaced with FEMA grant. Sheet 12 of 136Page 45 of 169 19 Downtown Wayfinding - Ph 3 - Trail System Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2024 Estimated Start: 20 Useful Life(Years): $3,000 Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $260,000$0$20,000$0$20,000$0$0$300,000 Funding Sources NANANANA CommunityTotal Reinvestment $300,000$0$0$0$0$300,000 Funding Details: Project Description and Justification Downtown wayfinding signage program-design and implementation plan was adopted by TB in January2023.Phase1of this plan was completed in2023.This phase will be constructed in2024to provide pedestrial level wayfinding along the trail system Build out phased program. Sheet 13 of 136Page 46 of 169 20 Downtown Wayfinding- Phase 2 Downtown Loop Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2025 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $200,000$0$25,000$0$25,000$0$0$250,000 Funding Sources NANANANA CommunityTotal Reinvestment $250,000$0$0$0$0$250,000 Funding Details: Project Description and Justification Fourteen(14)signs for pedestrian and vehicle wayfinding in the downtown area within the current Estes Park Loop project limits. Sheet 14 of 136Page 47 of 169 21 Downtown Wayfinding- Phase 4 Building Mounted Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2027 Estimated Start: 20 Useful Life(Years): $1,000 Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $96,000$0$12,000$0$12,000$0$0$120,000 Funding Sources NANANANA CommunityTotal Reinvestment $120,000$0$0$0$0$120,000 Funding Details: Project Description and Justification Additional building mounted pedestrian scale wayfinding signs located in areas where larger signage is not feasible. Sheet 15 of 136Page 48 of 169 22 Downtown Wayfinding Phase 5- Auto Directional Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): $1,000 Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $500,000$0$30,000$0$40,000$0$0$570,000 Funding Sources NANANANA CommunityTotal Reinvestment $570,000$0$0$0$0$570,000 Funding Details: Project Description and Justification Vehicular wayfinding signs to direct users to parking areas and destinations.These signs will replace the parking pilot signs that were installed in2021. Sheet 16 of 136Page 49 of 169 23 Downtown Wayfinding Phase 6- Destination Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2030 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $220,000$0$30,000$0$30,000$0$0$280,000 Funding Sources NANANANA CommunityTotal Reinvestment $280,000$0$0$0$0$280,000 Funding Details: Project Description and Justification Vehicular wayfinding signs to direct users to parking areas and destinations.These signs will replace the parking pilot signs that were installed in2021. Sheet 17 of 136Page 50 of 169 24 Fall River Trail- Final Segment 2024 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 3 Transportation Duration(Years):Board Goals: 2024 Estimated Start: 20 Useful Life(Years): $1,000 Annual Change in O&M: Along Fall River Road and Fish Hatchery Road Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $250,000$0$0$0$0$0$0$250,000 Funding Sources NANANANA CommunityTotal Reinvestment $250,000$0$0$0$0$250,000 Costs per2023TAP grant application submitted in April2023.Award decision expected 2023.Funding Funding Details: dependent on that future grant award.Funding split between LCOS and1A Trails TBD. Project Description and Justification Construct final segment of Fall River Trail along Fall River Road and Fish Hatchery Road.Revise final plans developed under separate CIP.This segment proposed to close the gap between previously constructed and funded FRT projects, providing a continuous trail between downtown EP and RMNP.This item addresses2023Strategic Plan Obj.T.7.B.1. Sheet 18 of 136Page 51 of 169 25 Moraine Ave/Mary's Lake Rd Roundabout Improvements Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 3 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): $2,000 Annual Change in O&M: Intersection of Moraine Ave (US36) and Mary's Lake Rd Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $3,200,000$640,000$500,000$20,000$1,500,000$110,000$0$5,970,000 Funding Sources NANANA Federal Grant orCommunityTotal LoanReinvestment $4,776,000$1,194,000$0$0$0$5,970,000 Funding dependent on future grant award and2024renewal of1A Sales Tax STIP/TREX initiatives.Curre Funding Details: funding out of Community Reinvestment fund. Project Description and Justification Improve intersection capacity and safety with new roundabout.Combine with separate CIP project proposal for Moraine Avenu Multimodal Improvements? The2023Town Strategic Plan includes Objective2.C.1to begin advance planning with RMNP and other stakeholders to develop stronger FLAP grant applications. Sheet 19 of 136Page 52 of 169 26 Moraine Avenue Multi-Modal Improvements Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 3 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): $5,000 Annual Change in O&M: Moraine Ave (US36) from west of Crags to Marys Lake Road Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $11,314,000$1,640,000$2,590,000$0$2,499,000$960,000$0$19,003,000 Funding Sources NANANA Federal Grant orCommunityTotal LoanReinvestment $15,733,000$3,270,000$0$0$0$19,003,000 Costs per2019FLAP grant application.Funding dependent on future grant award and2024renewal of1A Funding Details: Sales Tax STIP/TREX initiatives.FLAP grant not awarded in2016&2019.Update scope, schedule, and budget for2025grant cycle. Project Description and Justification Add bike lanes, turn lanes, roundabout (Elm Road), and trail.Combine with separate CIP project proposal for roundabout at MaryÓs Lake Road intersection? The2023Town Strategic Plan includes Objective T.2.C.1to begin advance planning with RMNP and other stakeholders to develop stronger FLAP grant applications. Sheet 20 of 136Page 53 of 169 27 Moraine Avenue Riverwalk Underpass Ramps Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 2 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): $1,000 Annual Change in O&M: Location:Along Fall River downtown, from 1/2block west of Moraine Avenue to1/2block east of Moraine Avenue Project Costs ConstructionDesignConstr MgmtLegalROWContingencyOtherTotal $3,500,000$400,000$300,000$80,000$500,000$300,000$0$5,080,000 Funding Sources NANA Other Funding Federal Grant orCommunityTotal LoanReinvestment $2,800,000$1,780,000$500,000$0$0$5,080,000 Funding is dependent on a future grant award(FEMA?), a future Stormwater Utility, and renewal of the1 Funding Details:A Sales Tax initiative(2024).Existing1A programs expire in 2024. Project Description and Justification Construct a riverwalk underpass beneath Moraine Avenue.Construct after downstream river improvements(FEMA grants) ar designed and constructed.Merge budget, scope, and schedule with the Bridge, Channel, and Bike Path Improvement CIP project, including pending project scoping via FEMA FMA grant? Sheet 21 of 136Page 54 of 169 28 N St Vrain Avenue (US36) Multi-Modal Improvements Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationNew Division:Capital Type: 2 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): $2,000 Annual Change in O&M: N St Vrain Avenue (US36), Community Drive Roundabout to SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $3,000,000$350,000$300,000$50,000$400,000$250,000$0$4,350,000 Funding Sources NANANA State Grant orCommunityTotal LoanReinvestment $3,480,000$870,000$0$0$0$4,350,000 Funding is dependent on future grant award and the renewal of the1A Sales Tax initiative in 2024.Existin Funding Details: 1A programs expire in 2024.Current funding out of CRF. Project Description and Justification Construct multi-use trail along the south side of N St Vrain Avenue(US36)from Community Drive roundabout to4th Street (new)and from4th Street to SH7(replacement).Construct2nd westbound travel lane from Community Drive roundabout to4t Street.Coordinate w/relocation of campground at Fairgounds and completion of the roundabout. Sheet 22 of 136Page 55 of 169 29 STIP Major St Rehab 2024 - 3rd St, N Ct, S Ct Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2025 Estimated Start: 20 Useful Life(Years): $0 Annual Change in O&M: Third Street, North Court, South Court, Second Street, First Street Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $1,800,000$92,000$100,000$10,000$180,000$48,000$0$2,230,000 Funding Sources NANANA Water Fund CommunityTotal Reinvestment $1,930,000$300,000$0$0$0$2,230,000 Funding is dependent on the renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2023as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Concept design began in2019on the heels of completing the4th Street project.Pilot projects for some of the concepts/option began in2020.Full implementation of pavement reconstruction and sidewalk improvements are joint project with EP Water Utility--and EP Water Utility will reimburse PW for costs related to their work. Sheet 23 of 136Page 56 of 169 30 STIP Major Street Rehab 2024 (W. Elkhorn Avenue) Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2024 Estimated Start: 20 Useful Life(Years): $0 Annual Change in O&M: W. Elkhorn, Moraine Avenue (US36) to Old Ranger Drive Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $350,000$10,000$10,000$0$35,000$0$0$405,000 Funding Sources NANANANA SalesTax1AST Total $405,000$0$0$0$0$405,000 Use 1A STIP funding. The existing 1A STIP expires in 2024. Costs per Loop project estimates. Funding Details: Project Description and Justification Mill and overlay of West Elkhorn (formerly US34B). Sheet 24 of 136Page 57 of 169 31 STIP Major Street Rehab 2026 (TBD) Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2027 Estimated Start: 20 Useful Life(Years): $0 Annual Change in O&M: Selected Road in Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $426,000$67,000$66,000$7,000$66,000$33,000$0$665,000 Funding Sources NANANANA CommunityTotal Reinvestment $665,000$0$0$0$0$665,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 25 of 136Page 58 of 169 32 STIP Major Street Rehab 2027 Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): $0 Annual Change in O&M: Selected road in Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $435,000$68,000$68,000$7,000$68,000$34,000$0$680,000 Funding Sources NANANANA CommunityTotal Reinvestment $680,000$0$0$0$0$680,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 26 of 136Page 59 of 169 33 STIP Major Street Rehab 2028 Project Information Public WorksJeff Bailey Project Manager Department:: Engineering / TransportationReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2028 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Selected road in Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $435,000$68,000$68,000$7,000$68,000$34,000$0$680,000 Funding Sources NANANANA CommunityTotal Reinvestment $680,000$0$0$0$0$680,000 Funding is dependent on renewal of the1A Sales Tax Initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scopt TBD. Sheet 27 of 136Page 60 of 169 34 STIP Overlay & Patch Program 2024 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2024 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Throughout Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $227,000$40,000$15,000$0$30,000$0$0$312,000 Funding Sources NANANANA SalesTax1AST Total $312,000$0$0$0$0$312,000 Use 1A STIP funding. Existing 1A STIP expires in 2024. Funding Details: Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 28 of 136Page 61 of 169 35 STIP Overlay & Patch Program 2025 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Throughout Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $490,000$70,000$70,000$0$70,000$0$0$700,000 Funding Sources NANANANA CommunityTotal Reinvestment $700,000$0$0$0$0$700,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 29 of 136Page 62 of 169 36 STIP Overlay & Patch Program 2026 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Throughout Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $525,000$75,000$75,000$0$75,000$0$0$750,000 Funding Sources NANANANA CommunityTotal Reinvestment $750,000$0$0$0$0$750,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 30 of 136Page 63 of 169 37 STIP Overlay & Patch Program 2027 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Throughout Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $560,000$80,000$80,000$0$80,000$0$0$800,000 Funding Sources NANANANA CommunityTotal Reinvestment $800,000$0$0$0$0$800,000 Funding is dependent on the renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 31 of 136Page 64 of 169 38 STIP Overlay & Patch Program 2028 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Throughout Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $595,000$85,000$85,000$0$85,000$0$0$850,000 Funding Sources NANANANA CommunityTotal Reinvestment $850,000$0$0$0$0$850,000 Funding is dependent on the renewal of the1A Sales Tax initiative in 2024.Existing1A programs expries Funding Details: in2024.Revisit budget, scope and schedule in2024as the new ballot initiative is refined.Current funding is moved to CRF. Project Description and Justification Each year a number of streets will be addressed based on Pavement Condition Index(PCI)evaluation.Project location and specific scope TBD. Sheet 32 of 136Page 65 of 169 39 STIP Parking Lot Rehabilitation 2024 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2024 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Any public parking lot Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $102,400$0$0$0$12,000$0$0 $114,400 Funding Sources NANANANA SalesTax1AST Total $114,400$0$0$0$0$114,400 Use 1A STIP funding. Existing 1A STIP expires in 2024. Funding Details: Project Description and Justification Each year one or more parking lots will be addressed based on Pavement Condition Index(PCI)evaluation.Project location a specific scope TBD in coordination with P&T Division. Sheet 33 of 136Page 66 of 169 40 STIP Parking Lot Rehabilitation 2025 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Any Town-owned parking lot Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $182,000$26,000$26,000$0$26,000$0$0$260,000 Funding Sources NANANANA CommunityTotal Reinvestment $260,000$0$0$0$0$260,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year one or more parking lots will be addressed based on Pavement Condition Index(PCI)evaluation.Project location a specific scope TBD in coordination with P&T Division. Sheet 34 of 136Page 67 of 169 41 STIP Parking Lot Rehabilitation 2026 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Any Town-owned parking lot Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $196,000$28,000$28,000$0$28,000$0$0$280,000 Funding Sources NANANANA CommunityTotal Reinvestment $280,000$0$0$0$0$280,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year one or more parking lots will be addressed based on Pavement Condition Index(PCI)evaluation.Project location a specific scope TBD in coordination with P&T Division. Sheet 35 of 136Page 68 of 169 42 STIP Parking Lot Rehabilitation 2027 Project Information Public WorksTrevor Wittwer Project Manager Department:: Engineering / TransportationExtend Useful Life Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 10 Useful Life(Years): $0 Annual Change in O&M: Any Town-owned parking lot Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $210,000$30,000$30,000$0$30,000$0$0$300,000 Funding Sources NANANANA CommunityTotal Reinvestment $300,000$0$0$0$0$300,000 Funding is dependent on renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024.Revisit budget, scope, and schedule in2024as the new ballot initiative is refined.Current funding o of CRF. Project Description and Justification Each year one or more parking lots will be addressed based on Pavement Condition Index(PCI)evaluation.Project location a specific scope TBD in coordination with P&T Division. Sheet 36 of 136Page 69 of 169 43 VC Upstairs Office & Bus Driver Lounge Project Information Public WorksRobert Shumaker Project Manager Department:: FacilitiesNew Division:Capital Type: Government Services & Internal Support Duration(Years):Board Goals: 2029Infrastructure Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Visitor Center Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $156,000$0$6,825$0$14,300$0$0$177,125 Funding Sources NANANANA CommunityTotal Reinvestment $177,125$0$0$0$0$177,125 Funding Details: Project Description and Justification Finish upstairs north half of bldg to accommodate need for more offices for PW operations(i.e., Parking & Transit and Facilities).Will facilitate the ability to use upstairs loft for a potential bus driver lounge.Need to contact Fire Marshall b/c of only one egress in upstairs loft which may not accomodate bus driver lounge. Sheet 51 of 136Page 84 of 169 44 Big Horn Parking Structure (Construction) Project Information Public WorksVanessa Solesbee Project Manager Department:: ParkingTransitMaster Plan Division:Capital Type: 2 Transportation Duration(Years):Board Goals: 2024Robust Economy Estimated Start: 50Exceptional Guest Services Useful Life(Years): Annual Change in O&M: Big Horn and Cleave street Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $1,540,000$0$154,000$0$308,000$0$0$2,002,000 Funding Sources NANANA ParkingBonds Total $100,000$1,902,000$0$0$0$2,002,000 cost per space is $35,000 Funding Details: Project Description and Justification Build a micro parking structure on current Big Horn parking lot footprint.Estimate88spaces, two levels, no ramps.Design anticipated in2023. Sheet 52 of 136Page 85 of 169 45 Downtown Parking Mgmt Plan (DPMP) - Ph. 3 Project Information Public WorksVanessa Solesbee Project Manager Department:: ParkingTransitMaster Plan Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2025Robust Economy Estimated Start: 10Exceptional Guest Services Useful Life(Years): $350,000 Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $140,000$0$0$0$0$0$0$140,000 Funding Sources NANANANA Parking Total $140,000$0$0$0$0$140,000 Additional paid parking revenues. We estimate an additional $518,899 in season revenue. Funding Details: Project Description and Justification If supported by parking data collected in teh2024paid parking season, full implementation of DPMP would occur in2025.This would include expansion of the paid parking program into additional public parking areas in downtown.Demand-based pricing would also be considered Sheet 53 of 136Page 86 of 169 46 Downtown Parking Mgmt Plan Ph. IV (Construction) Project Information Public WorksRobert Shumaker Project Manager Department:: ParkingTransitMaster Plan Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2031Robust Economy Estimated Start: 50Exceptional Guest Services Useful Life(Years): $32,000 Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $11,700,000$0$1,170,000$0$2,340,000$0$0$15,210,000 Funding Sources NANANA ParkingBonds Total $1,597,000$13,613,000$0$0$0$15,210,000 Funding Details: Project Description and Justification Build second parking structure in the downtown core with300spaces.Est $35,000per space with minimal land acq costs. Contingent upon implementation of DPMP Phase3expansion of paid parking. Sheet 54 of 136Page 87 of 169 47 Downtown Parking Mgmt Plan Ph. IV Design Project Information Public WorksRobert Shumaker Project Manager Department:: ParkingTransitMaster Plan Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2030Robust Economy Estimated Start: 10Exceptional Guest Services Useful Life(Years): $0 Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $0$1,800,000$0$0$180,000$100,000$0$2,080,000 Funding Sources NANANANA Parking Total $2,080,000$0$0$0$0$2,080,000 Funding Details: Project Description and Justification Site selection & design for second parking structure(300spaces)located within the downtown core.Revenue assumes implementation of DPMP Phase3, expanded paid parking. Sheet 55 of 136Page 88 of 169 48 Replacement Vehicle - Electric Trolley (Out Years) Project Information Public WorksVanessa Solesbee Project Manager Department:: ParkingTransitReplacement Division:Capital Type: Transportation Duration(Years):Board Goals: 2030Robust Economy Estimated Start: 10 Useful Life(Years): Annual Change in O&M: Downtown Estes Park Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $520,076$0$0$0$0$0$0$520,076 Funding Sources NANANA CommunityFederal Grant orTotal ReinvestmentLoan $104,015$416,061$0$0$0$520,076 Added 10% increase in cost and assumed 20% local match. Funding Details: Project Description and Justification Replacement of first grant-funded electric trolley (rec'd July 2020). Anticipate new grant for replacement with another trolley bu Sheet 56 of 136Page 89 of 169 49 Parks Irrigation System Replacement Project Information Public WorksBrian Berg Project Manager Department:: ParksReplacement Division:Capital Type: 1 Infrastructure Duration(Years):Board Goals: 2025Outstanding Community Services Estimated Start: 20 Useful Life(Years): $-200 Annual Change in O&M: Along Riverwalk. US 36 Tunnel to Riverside restrooms - CONSTRUCTION Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $75,000$0$0$0$0$0$0$75,000 Funding Sources NANANANA Open Space Total $75,000$0$0$0$0$75,000 Irrigation Main - Riverwalk Funding Details: Project Description and Justification Construction of 2019 Design to replace outdated and inefficient irrigation system from US36 tunnel to Riverside restrooms. Sheet 59 of 136Page 92 of 169 50 Trail Reconstruction US 34 and SH7 Phase 2 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2025 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Along US 34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $416,667$0$77,778$5,556$77,778$22,222$0$600,000 Funding Sources NANANANA Open Space Total $600,000$0$0$0$0$600,000 This funding is split over9different phases.The total anticipated amount over the life of the project is Funding Details: 5,400,000. (this does not include the $250,000spent on design). Project Description and Justification This is phase 2 of 9 phases that will be developed based on design and refined cost estimates. Sheet 60 of 136Page 93 of 169 51 Trail Reconstruction US 34 and SH7 Phase 3 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2027 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: along us 34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $416,667$0$77,778$5,556$77,778$22,222$0$600,000 Funding Sources NANANANA Open Space Total $600,000$0$0$0$0$600,000 This funding is split over9different phases.The total anticipated amount over the life of the project is Funding Details: 5,400,000. (this does not include the $250,000spent on design). Project Description and Justification This is phase 3 of 9 phases that will be developed based on design and refined cost estimates. Sheet 61 of 136Page 94 of 169 52 Trail Reconstruction US 34 and SH7 Phase 4 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Along US 34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $416,667$0$77,778$5,556$77,778$22,222$0$600,000 Funding Sources NANANANA Open Space Total $600,000$0$0$0$0$600,000 This funding is split over9different phases.The total anticipated amount over the life of the project is Funding Details: 5,400,000(this does not include the $250,000spent on design). Project Description and Justification This is phase 4 of 9 phases that will be developed based on design and refined cost estimates. Sheet 62 of 136Page 95 of 169 53 Trail Reconstruction US 34 and SH7 Phase 5 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2031 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Along US 34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $416,667$0$77,778$5,556$77,778$22,222$0$600,000 Funding Sources NANANANA Open Space Total $600,000$0$0$0$0$600,000 This funding is split over9different phases.The total anticipated amount over the life of the project is Funding Details: 5,400,000(this does not include the $250,000spent on design). Project Description and Justification This is phase 5 of 9 phases that will be developed based on design and refined cost estimates. Sheet 63 of 136Page 96 of 169 54 Trail Reconstruction US 34 and SH7 Phase 6 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 1 Transportation Duration(Years):Board Goals: 2029 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Along US 34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $416,667$0$77,778$5,556$77,778$22,222$0$600,000 Funding Sources NANANANA Open Space Total $600,000$0$0$0$0$600,000 This funding is split over9different phases.The total anticipated amount over the life of the project is Funding Details: 5,400,000(this does not include the $250,000spent on design). Project Description and Justification This is phase 6 of 9 phases that will be developed based on design and refined cost estimates. Sheet 64 of 136Page 97 of 169 55 Trail Reconstruction US 34 and SH7 Phase 7-9 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 3 Transportation Duration(Years):Board Goals: 2032 Estimated Start: 20 Useful Life(Years): Annual Change in O&M: Along US 34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $1,250,000$0$233,333$16,667$233,333$66,667$0$1,800,000 Funding Sources NANANANA Open Space Total $1,800,000$0$0$0$0$1,800,000 This funding is split over9different phases.The total anticipated amount over the life of the project is Funding Details: 5,400,000(this does not include the $250,000spent on design). Project Description and Justification This is phases 7 of 9 phases that will be developed based on design and refined cost estimates. Sheet 65 of 136Page 98 of 169 56 Trail Reconstruction US34 & SH7 Phase 1 Project Information Public WorksJeff Bailey Project Manager Department:: ParksReplacement Division:Capital Type: 10 Transportation Duration(Years):Board Goals: 2024 Estimated Start: 20 Useful Life(Years): $0 Annual Change in O&M: Along US34 and SH7 Location: Project Costs Other ConstructionDesignConstr MgmtLegalROWContingencyTotal $0$250,000$0$0$0$0$0$250,000 Funding Sources NANA Open SpaceSalesTax1ATRL CommunityTotal Reinvestment $62,500$62,500$125,000$0$0$250,000 Funding is dependent on the renewal of the1A Sales Tax initiative in 2024.Existing1A programs expire in Funding Details: 2024. Project Description and Justification Replace existing asphalt trail with concrete trail.Phase1of several to address the several miles of existing trail along US34 and SH7.Phase1(2024)will consist of full engineering design of both trail replacements, with overall cost estimates.Nine(9) future construction phases will be developed based on the design and refined cost estimate. Sheet 66 of 136Page 99 of 169 57 58 59 60 61 62