Loading...
HomeMy WebLinkAboutDOCUMENT Roof Ceiling Penetrations 1600 Fish Hatchery 2015-06-04 MEMO PROJECT: HARMONY FOUNDATION, INC. Admissions/ Detox Facility CE NO: 13018 DATE: 06.04.2015 TO: WILL BIRCHFILED E-MAIL: WBIRCHFIELD@ESTES.ORG AT: TOWN OF ESTES PARK DIVISION OF BUILDING SAFETY PHONE: 970-577-3728 FROM: MATT DWORAK RE: ROOF/CEILING PENETRATIONS PAGES: 1 Mr. Birchfield, In consideration of the roof/ceiling penetrations on the Harmony Detox project, we are of the opinion that the 3-hr. (UL 555 listed) fire dampers installed at the ceiling membrane of the 1-hr rated roof/ceiling assembly provide a reasonable equivalent of achieving the intent of the code section 716.6.2 Membrane Penetrations, Item 2, 2009 International Building Code. We further feel that the additional life-safety provisions of a fully sprinkled building, fire alarm system and duct mounted smoke detectors provide a reasonable standard of care for the building occupants. As discussed on-site, the dampers will need to be installed per the manufacturer’s installation details (2-sided Mounting Angle) including: sleeve termination supplemental instructions, breakaway connections, mounting angles and sealing. This condition occurs at the (7) exhaust air ducts (sleeves to be a minimum of 16 gauge) and the supply and return connections to the RTU (sleeves to be a minimum of 14 gauge). Please call with any additional questions. Respectfully, MATT DWORAK Project Manager W:\2013 PROJECTS\13018 - HARMONY CAMPUS\13018 - HARMONY DETOX CENTER\CORRESPONDENCE\CE MEMO- FIRE DAMPERS