HomeMy WebLinkAboutVARIANCE 223 Cleave Street Setback 2022-11-01 Community Development Memo To:Chair Jeff Moreau Estes Park Board of Adjustment Through: Jessica Garner, AICP, Community Development Director From: Jeffrey Woeber, Senior Planner Date: November 1, 2022 Application: Setback Variance 223 Cleave Street, Estes Park BAT 223 LLC, Owner/Applicant Joe Calvin, Interstice Architectural Studio, LLC, Representative Recommendation: Staff recommends the Board of Adjustment approve the variance request, subject to the findings described in the report. Land Use: Comprehensive Plan Designation: (Future Land Use): Downtown Zoning District: Downtown Commercial (CD) Site Area: 0.18 Acre PUBLIC HEARING ORDINANCE LAND USE CONTRACT/AGREEMENT RESOLUTION OTHER QUASI-JUDICIAL YES NO Objective: The applicant requests approval of a variance to allow a reduced frontsetback of zero feet (0’) in lieu of the eight feet (8’) required in the CD (Downtown Commercial) Zoning District under Section 4.4.C.4. of the Estes Park Development Code (EPDC). The base of the building would be located six feet from the front property line, with upper-level deck/balconies projecting to the property line at a zero-foot setback. Location: The 0.18-acre lot is located at 223 Cleave Street, at the northeast corner of the intersection of Lawn Lane and Cleave Street in downtown Estes Park. Background: The subject property recently contained a two-story structure originally established in 1929, which was demolished. A Development Plan has been submitted for a three- story,mixed-use buildingcalled the “BAT Project”that includesan art gallery, retail space, a taproom with beer garden, and residential apartments. The demolished structure wasconstructedup to the front property line to a zero-foot front setback. The developer was not aware thatthe new structure could notalsobe built to the front setback. Section 6.3 of the Estes Park Development Code allows a nonconforming structure to be restored or rebuilt if damaged or destroyed by “fire, flood, wind, explosion or act of God,” which is not applicable for this proposed building. Variance Description This is a requestto approvea varianceto allow a zero-foot (0’) front setback for the upper level decks and roof eaves, and six feet (6’) for the structure at street level, as depicted on the attached drawings. There was some question whether the structure met the Design Standards under Section 11.5 of the EPDC, which allows the building height to be a maximum of 42 feet in the CD Zoning District. After review and discussion with the applicant, it has been determined the structure does comply with these standards, particularlythe Development and Design Standards in Section 11.5.C. The third story of the proposed BAT Project will include a “step back of no less than eight feet (8’) from the building façade” as required. Location and Context: Vicinity Map 2 Zoning Map Zoning and Land Use SummaryTable Comprehensive PlanZoneUses SubjectCD CD (Downtown Commercial)Undeveloped Site(Commercial Downtown) North(MF) Multi-FamilyRM (Multi-Family)Undeveloped CD SouthCD (Downtown Commercial)Commercial (Commercial Downtown) CD EastCD (Downtown Commercial)Residential (Commercial Downtown) CD WestRM (Multi-Family)Residential (Commercial Downtown) Project Analysis Review Criteria: The Board of Adjustment (BOA) is the decision-making body for variance requests. In accordance with EPDC Section 3.6.C., Variances, Standards for Review, applications 3 for variances shall demonstrate compliance with the applicable standards and criteria contained therein. The Standards with staff findings for each are as follows: 1. Special circumstances or conditions exist (e.g., exceptional topographic conditions, narrowness, shallowness or the shape of the property) that are not common to other areas or buildings similarly situated and practical difficulty may result from strict compliance with this Code’s standards, provided that the requested variance will not have the effect of nullifying or impairing the intent and purposes of either the specific standards, this Code or the Comprehensive Plan. Staff Finding:Special conditions exist, due to the relatively small size of the property anda25-foot cliff incorporated into the design of the proposed structure that extends along the entire width of the property to the northeast. The requested variance will not nullify or impair the intent and purposes of the setback standards, the EPDC, or the Comprehensive Plan. Although not directly in the scope of the Code’s Standards for Review, staff notes the BAT Project and the associated variance request are consistent with the recommendations of the Estes Park Downtown Plan adopted in early 2018. 2. In determining "practical difficulty," the BOA shall consider the following factors: a. Whether there can be any beneficial use of the property without the variance; Staff Finding: There may be beneficial use of the property without the variance. However, the design and utility of the proposed building would be constrained without the variance. b. Whether the variance is substantial; Staff Finding: The variance is somewhat substantial with the proposed zero front setback. However the setback at ground level is six feet from the property line, with the upper level being proposed at a zero setback. c. Whether the essential character of the neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance; Staff Finding: Staff does not find the character of the neighborhood would be altered. The majority of structures along Cleave Street are built to the property line at a zero setback, and the proposed setback for the BAT Project would fit with the commercial and multi-family housing character of the neighborhood. The setback would not cause any detriment to adjoining properties. 4 d. Whether the variance would adversely affect the delivery of public services such as water and sewer. Staff Finding:Public services such as water and sewer will not be adversely affected by the variance. The BAT Project will involve some utility extensions and improvements, but the reduced front setback will not adversely affect the delivery of these services. e. Whether the Applicant purchased the property with knowledge of the requirement; Staff Finding: The Applicant purchased the property decades ago with a structure built to the property line, and was not aware that a new structure would require an eight-foot front setback. f. Whether the Applicant's predicament can be mitigated through some method other than a variance. Staff Finding: There is no alternative to mitigate the Applicant’s predicament aside from a complete redesign of the Project. 3. If authorized, a variance shall represent the least deviation from the regulations that will afford relief. Staff Finding: The proposed variances would be the least deviations from the Development Code. 4. In granting such variances, the BOA may require such conditions as will, in its independent judgment, secure substantially the objectives of the standard so varied or modified. Staff Finding: Staff does not recommend conditions. Review Agency Comments The variance application was referred to all applicable review agencies for comment. There were no objections or requirements from any review agency. There may be requirements with the associated Development Plan for the BAT Project, which will be prepared following the determination of the Board and reviewed administratively. Public Notice Staff provided public notice of the application in accordance with EPDC noticing requirements. As of the time of writing this report, no written comments have been received for the variance request. 5 Written notice mailed to adjacent property owners on September 16, 2022. Legal notice published in the Estes Park Trail-Gazette onSeptember16,2022. Application posted on the Town’s “Current Applications” website onAugust 26, 2022. Advantages The Town is coordinating planning, design and outreach efforts for the Cleave Street Improvements Project. The BAT Project design would establish a valuable precedent for planned improvements in this area of downtown Estes Park. Disadvantages None. Action Recommended Staff recommends approval of the proposed variance described in this staff report, with setbacks consistent with the BAT Project plans attached hereto. Finance/Resource Impact N/A Level of Public Interest Low. Sample Motions I move to approve the variance request for reduced front setbacks for the subject property addressed as 223 Cleave Streetin the Town of Estes Park, with findings as outlined in the staff report. I move to deny the requested variance with the following findings (state reason/findings). I move that the Board of Adjustment continue the variance to the next regularly scheduled meeting, finding that \[state reasons for continuance\]. Attachments 1. Application 2. Statement of Intent 3. BAT Project Plan Set(Page 6 is a RevisedDrawing) 6 ESTES BOARD OF ADJUSTMENT APPLICATION 8/17/2022 Submittal Date: General Information BAT223 LLC Record Owner(s): 223 Cleave St Street Address of Lot: 24/6 Legal Description:Lot: Block:8 Tract: Second Amended Plat of Piltz Resub Subdivision: 3525224024 Parcel ID # : Site Information .1 CD Lot SizeZoning Vacant Existing Land Use Commercial/Residential Proposed Land Use Town Water, EPSD, Xcel TownWellOther (Specify) Existing Water Service Town Water, EPSD, Xcel, No Wetland Proposed Water Service TownWellOther (Specify) Existing Sanitary Sewer ServiceEPSDUTSDSeptic Proposed Sanitary Sewer ServiceEPSDUTSDSeptic Existing Gas ServiceXcelOtherNone Site Access (if not on public street) Are there wetlands on the site?YesNo Variance Variance Desired (Development Code Section #): Front setbacks to second story decks, Code Section: Table 4-5 Density & Dimensional Standards Nonresidential Primary Contact Information Joe Calvin, Interstice Architectural Studio, LLC, (Consultant) Name of Primary Contact Person joe@intersticearch.com Complete Mailing Address Primary Contact Person isOwnerApplicantConsultant/Engineer Attachments 5 Application fee (see attached fee schedule) 5 Statement of intent (must comply with standards inSection 3.6.C of the EDC) 5 copy (folded) of siteplan (drawn aa scale of 1" = 20') ** 5 1 reduced copy of the siteplan (11"X 17") 5 Digital copies of plats/plans in TIFForPDF format emailed to planning@estes.org The site plan shall include information in Estes Development Code AppendixB.VII.5. he applicant will be required toprovide additional copies of the siteplan after staff review (see the Board of Adjustment variance application schedule).Copies must be folded. Town of Estes Park P.O. Box 1200 170 MacGregor Avenue Estes Park, CO 80517 (970) 577-3721 Fax: (970) 586-0249 www.estes.org/CommunityDevelopment Community Development Department Phone: Revised 20 Contact Information BAT223 LLC Record Owner(s) 2480 Pershing RD STE 600 Kansas City, MO 64108 Mailing Address Phone Cell Phone Fax batdowntown@gmail.com Email Barb Marshall Applicant 2480 Pershing RD STE 600 Kansas City, MO 64108 Mailing Address Phone Cell Phone Fax batdowntown@gmail.com Email Joe Calvin, Interstice Architectural Studio, LLC Consultant/Engineer Mailing Address Phone 970-420-8264 Cell Phone Fax joe@intersticearch.com Email APPLICATION FEES See the fee schedule included in your application packetor view the fee schedule online at: www.estes.org/planningforms All requests for refunds mustbe made in writing. Allfees are dueat the time of submittal. Revised 20 OWNER & APPLICANT CERTIFICATION As Owner, I certify the information and exhibits herewith submitted are true and correct to the best of my knowledge and I am the record owner of the property. As Applicant, I hereby certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge and that in filing the application I am acting with the knowledge and consent of the owners of the property. In submitting the application materials and signing this application agreement, I acknowledge and agree that the application is subject to the applicable processing and publichearing requirements set forth in the Estes DevelopmentCode (EDC). I acknowledge that I have obtained or have access to the EDC,and that,prior to filing this application, I have had the opportunity to consult the relevantprovisions governing the processing of and decision on the application. The Estes DevelopmentCode is available online at: https://www.municode.com/library/CO/estes_valley/codes/development_code I understand that acceptance of this application by the Town of Estes Park for filing and receipt of the application fee by the Towndoes not necessarily mean that the application is complete under theapplicable requirements of the EDC. I understand that this variance request may be delayed in processing by a month or more if the information provided is incomplete, inaccurate, or submitted after the deadline date. I understand that a resubmittal fee may be charged if my application is incomplete. The Community Development Department will notify the applicant in writing of the date on which the application is determined to be complete. I grant permission for Town of Estes Park Employees and Members of the Board of Adjustment with proper identification access to my property during the review of this application. I acknowledge that I have received the Estes Board of AdjustmentVariance Application Schedule and thatfailure to meet the deadlines shown onsaid schedule shall resultin my applicationor the approval of my application becoming null and void. I understand that full fees will be charged for the resubmittal ofan application thathas become null and void. I understand that I amrequired to obtain a ""sign from the Community Development Department andthat this sign mustbe posted on my property where itis clearlyvisible from the road. I understand that the corners ofmy propertyand the proposed building/structure corners mustbe field staked. I understand that the sign must beposted and the staking completed no later than ten (10) business days prior to the EstesBoard of Adjustmenthearing. I understand that if the Board ofAdjustment approves my request, "Failureof an applicant to apply for a building permit and commence construction or action with regard to the variance approval within one(1) year of receiving approval of the variance may automatically render the decision of the BOA null and void." (Estes DevelopmentCode Section 3.6.D) Names: PLEASE PRINT: Record Owner Applicant PLEASE PRINT: Signatures: Record Owner Date Date Applicant Revised 2 CBU!QSPKFDU 334!Dmfbwf!Tusffu Bvhvtu!28-!3133 WBSJBODF!SFRVFTU!OBSSBUJWF Uijt!qspkfdu!jowpmwft!uif!dpnqmfuf!efnpmjujpo!pg!uif!fyjtujoh!cvjmejoh!bu!334!Dmfbwf!Tusffu/!!Uif!cvjmejoh!ibe!cffo!mpxfs!mfwfm! dpnnfsdjbm!tqbdf!xjui!uxp!vqqfs!mfwfm!bqbsunfout-!cvu!xbt!vopddvqjfe!gps!tfwfsbm!zfbst/!!Uif!cvjmejoh!dpoubjofe!tpnf! btcftupt!xijdi!xbt!njujhbufe!qsjps!up!uif!bqqmjdbujpo!gps!b!efnpmjujpo!qfsnju/ B!ofx!uisff.tupsz!cvjmejoh!jt!qspqptfe/!!Uif!mpxfs!mfwfm!xjmm!jodmvef!bo!bsu!hbmmfsz!0!sfubjm!tqbdf!up!uif!fbtu!boe!b!ubqsppn!up!uif! xftu/!!Uif!ubqsppn!xjmm!pqfo!up!b!uisff.tfbtpo!pvuepps!cffs!hbsefo!po!uif!xftu!qpsujpo!pg!uif!qspqfsuz/!!Uif!vqqfs!mfwfmt!pg! uif!cvjmejoh!xjmm!qspwjef!b!ovncfs!pg!sftjefoujbm!bqbsunfout-!tpnf!pg!xijdi!nbz!opu!cf!dpnqmfufe!jo!uif!jojujbm!dpotusvdujpo! qibtf/!!Uif!vqqfs!mfwfmt!nbz!cf!mfgu!dpsf.boe.tifmm!jojujbmmz/!!Ju!jt!qpttjcmf!uibu!qbsut!pg!uif!tfdpoe!gmpps!xjmm!cf!gjojtife!bt!bo! fwfou!tqbdf!bddfttpsz!up!uif!nbjo!mfwfm!ubqsppn!vtf/ Xf!bsf!tffljoh!b!tfucbdl!wbsjbodf!gps!uijt!qspkfdu!up!bmmpx!uif!cvjmejoh!up!cf!cvjmu!7(.1#!gspn!uif!qspqfsuz!mjof!boe!up!bmmpx!gps! vqqfs!mfwfm!efdlt!boe!sppg!fbwft!up!qspkfdu!pvu!fttfoujbmmz!sjhiu!up!uif!qspqfsuz!mjof/!!Tqfdjgjd!ejnfotjpot!bsf!qspwjefe!po!Tiffu! 3!pg!6!pg!uif!fodmptfe!esbxjoht/!!Opsnbmmz!uif!Ftuft!Qbsl!Efwfmpqnfou!Dpef!sfrvjsft!9(.1#!dpotusvdujpo!tfucbdl!gspn!uif! Dmfbwf!Tusffu!qspqfsuz!mjof/!!Xf!bsf!sfrvftujoh!uijt!wbsjbodf!gps!b!ovncfs!pg!sfbtpot/// ¦Uif!qspqfsuz!dpoubjot!b!fydfqujpobm!hfphsbqijd!gfbuvsf!mjnjujoh!jut!vtf/!!Uifsf!jt!bo!bqqspyjnbufmz!36(.1#!ubmm!spdl!dmjgg!xbmm! dspttjoh!uif!tjuf!gspn!spvhimz!fbtu!up!xftu/!!Uif!cvjmejoh!xjmm!cf!cvjmu!fydmvtjwfmz!tvqqpsufe!gspn!uif!cpuupn!qpsujpo!pg!uif! tjuf!xjui!b!qpttjcmf!qfeftusjbo!csjehf!boe!wfijdvmbs!bddftt!bu!uif!upq!pg!uif!dmjgg/ ¦Uif!efqui!pg!uif!vtbcmf!mboe!gspn!uif!cpuupn!pg!uif!dmjgg!up!uif!tpvui!Dmfbwf!Tusffu!qspqfsuz!mjof!jt!upp!obsspx!up!bmmpx!gps!uif! eftjsfe!cfofgjdjbm!fdpopnjd!efwfmpqnfou!pg!uif!tjuf!bt!jmmvtusbufe/!!Xjuipvu!uijt!wbsjbodf-!bqqspyjnbufmz!711!trvbsf!gffu!pg! cvjmejoh!bsfb!xpvme!cf!mptu!bt!xfmm!bt!uif!qspkfdujoh!vqqfs!mfwfm!cbmdpojft/ ¦Nptu!fyjtujoh!cvjmejoht!po!Dmfbwf!Tusffu!xfsf!cvjmu!jo!uif!npsf.ps.mftt!ejtubou!qbtu!xjui!mjuumf.up.op!tfucbdl!gspn!uifjs!tpvui! qspqfsuz!mjoft!bekbdfou!up!Dmfbwf!Tusffu/!!Xjuipvu!uijt!wbsjbodf-!uif!qspqptfe!cvjmejoh!xpvme!cf!opujdfbcmz!tfucbdl!cfijoe! ju(t!ofjhicpst!up!uif!fbtu/!!Dbsf!ibt!cffo!ublfo!jo!uif!qspqptfe!eftjho!up!bmjho!uif!qspkfdujoh!gbdf!boe!ifjhiu!pg!cbmdpojft! xjui!gfbuvsft!pg!uif!jnnfejbufmz!ofjhicpsjoh!cvjmejoh!bt!xfmm!bt!puifs!fyjtujoh!cvjmejoht!gvsuifs!fbtu!po!Dmfbwf/!!Tff!5!pg!6!jo! uif!fodmptfe!esbxjoht!gps!jmmvtusbujpo!pg!uijt!sfmbujpotijq/!!Pvs!joufou!jo!tffljoh!uijt!wbsjbodf!jt!up!nbjoubjo!uif!ofjhicpsippe! dibsbdufs!boe!gbcsjd/!!Tfuujoh!uif!cvjmejoh!cbdl!jo!dpnqmjbodf!xjui!uif!9(.1#!sfrvjsfnfou!xpvme!tvctuboujbmmz!bmufs!uif! ofjhicpsippe!dibsbdufs/ ¦Uif!qsf.fyjtujoh!cvjmejoht!po!uif!tjuf!)opx!efnpmjtife*!ibe!fttfoujbmmz!{fsp!tfucbdl!gspn!uif!tpvui!Dmfbwf!Tusffu!qspqfsuz! mjof/!!Xifo!psjhjobmmz!qvsdibtfe!cz!uif!Pxofs-!ju!xbt!ifs!cfmjfg!uibu!tvdi!ejnfotjpot!boe!vtft!dpvme!cf!nbjoubjofe/ ¦Vtjoh!uif!fyjtujoh!fehf!pg!btqibmu!bt!b!hvjef-!uif!bmjhonfou!pg!uif!cvjmejoh!tipxo!po!uif!fodmptfe!esbxjoht!xjmm!bmmpx!gps!b! gvmm.xjeui!tjefxbml!nffujoh!Upxo!tuboebset!boe!bmjhojoh!xjui!gvuvsf!tjefxbmlt!up!uif!fbtu!po!Dmfbwf!boe!up!uif!xftu! sftjefoujbm!ipvtjoh/!!Jo!gbdu-!bu!uif!xftu!tjef!pg!uif!cvjmejoh!jo!gspou!pg!uif!ubq!sppn-!uif!gvmm.xjeui!tjefxbml!xjmm!cf!tfqbsbufe! gspn!uif!cvjmejoh!bmmpxjoh!gps!cjdzdmf!qbsljoh!boe!b!mboetdbqjoh!cfe!jnnfejbufmz!bekbdfou!up!uif!cvjmejoh/ Uif!sfevdfe!tfucbdl!up!uif!qspqptfe!cvjmejoh!bt!jmmvtusbufe!ifsfjo!jt!uif!mfbtu!efwjbujpo!qsbdujdbm!gps!uif!Pxofs!up!nblf! bggfdujwf!vtf!pg!uif!tjuf!boe!jo!psefs!up!nbjoubjo!ofjhicpsippe!dibsbdufs/!!Uif!hsboujoh!pg!uijt!wbsjbodf!xjmm!opu!joufsgfsf!xjui!ps! joijcju!qvcmjd!vujmjujft!ps!tfswjdft-!jodmvejoh!uif!ofx!gjsf!tqsjolmfs!xbufs!tfswjdf!qspqptfe!gps!uijt!qspkfdu/!!Cfzpoe!uif!btqfdut!pg! uif!wbsjbodf!sfrvftu!ejtdvttfe!bcpwf-!uif!joufou!jt!up!dpnqmz!xjui!bmm!sfrvjsfnfout!pg!tfu!gpsui!jo!¥4/7!pg!uif!Ftuft!Qbsl! Efwfmpqnfou!Dpef/ Uibol!zpv!gps!zpvs!dpotjefsbujpo!pg!uijt!sfrvftu/ QP!Cpy!2666!¦!Ftuft!Qbsl-!DP!91628!¦!):81*531.9375!¦!xxx/joufstujdfbsdi/dpnQbhf!2!pg!2 27(.1#7(.1# # #2 7(.2!409# 5;23 Tmpqf!Eo 3;235;23 Tmpqf!EoTmpqf!Eo #4:(.2 #4:(.2 #22(.1#22(.424(.3#