HomeMy WebLinkAboutPLAN Architectural Set The Prospector 2021-04-08GENERAL NOTES:
1.RE CIVIL PLANS FOR MAIN ELEVATIONS
2.ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT)
3.ALL WINDOWS / DOOR DIMENSIONS ARE TO CENTER OF WINDOW/DOOR U.N.O.
COORDINATE ROUGH OPENING DIMENSIONS WITH ASSOCIATED DOOR &
WINDOW DETAILS PRIOR TO CONSTRUCTION.
4.REFER TO CODE SHEETS FOR EGRESS.
5.DOOR FRAMES TO BE LOCATED 4" FROM CORNER OF INTERSECTING WALLS,
U.N.O.
6.WHERE PLYWOOD IS ADDED FOR SHEAR ON PARTIAL WALL, REMAINDER OF
WALL SHALL HAVE SIMILAR SHEATHING TO PROVIDE FLUSH WALL SURFACE,
RE:STRUCT FOR SHEAR WALL LOCATIONS.
7.REFER TO SLAB PLANS FOR SLAB ELEVATIONS, DEPRESSIONS, SLOPES,
DRAINS AND ADDITIONAL SLAB INFO.
8.EACH DWELLING UNIT WILL BE PROVIDED WITH A PORTABLE FIRE
EXTINGUISHER HAVING A MIN. RATING OF 1-A:10, SEE FIRE PROTECTION
PLANS. CONTRACTOR TO SUPPLY , INSTALL PER OWNERS INSTRUCTIONS.
9.SOFFIT FOR HVAC DUCT: MINIMIZE SIZE, KEEP HIGH AND TIGHT AS POSSIBLE
10.WINDOWS TO HAVE A MIN. STC RATING .30 / U VALUE MIN. RATING .28
11.WINDOWS TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS
VERTICAL FAUX WOOD BLINDS ON DOORS
12.ENSURE THAT ALL DOORS TO HAVE DOOR STOPS
13.COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH
DRAWER PULLS
14.PROVIDE CASING ON ALL DOOR OPENINGS 1
2" X 4" WITH EASED EDGE
15.PROVIDE BASE BOARD, 1
2" X 4" WITH EASED EDGE
16.CABINET SYSTEM PROFILE: APPROVE WITH OWNER IN ADVANCE
17.COUNTERTOPS: SOLID SURFACE WITH OWNER IN ADVANCE
2CM(3
4"), 4" H BACKSPLASH
18.VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE
CODES
19.COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES,
INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC.
20.PROVIDE BLOCKING FOR SHELVING AND ACCESSORIES
21.ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL
22.MICROWAVE W/ HOOD, LIGHT AND FAN BELOW
23.PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH
ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI
RECEPTANCE.
24.COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR.
25.ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE
NOTED. SEE ELECTRICAL PLANS.
26.RADON MITIGATION, EACH BUILDING TO RECEIVE UNDER SLAB MAT TO VENT
VERTICALLY THROUGH THE BUILDING IN 2X6 WALLS.
BEDROOM
11'-0" X 13'-6"
KITCHEN
ENTRY
BATHROOM #1
PANTRY
STACK
W/D
DISHWASHER
RANGE
30" ELEC.30" REFRIG
TYPE B
ADAPTABLE
625 SF
A-1
LIVING ROOM
TYPE B
ADAPTABLE
935 SF
B-1
STACK
W/D
MASTER BEDROOM
SECONDARY BEDROOM
ST
O
R
A
G
E
MECH
BA
T
H
R
O
O
M
#
1
KITCHEN
ENTRY
BATHROOM #2
30" REFRIG
RANGE
30" ELEC.DISHWASHER
MECH
ST
O
R
A
G
E
PANTRY
ST
O
R
A
G
E
KITCHEN
SECOND BEDROOM
TYPE B
ADAPTABLE
1140 SF
D-1
ENTRY
BATHROOM #1
MASTER BEDROOM
MECH
BATHROOM #2
THIRD BEDROOM
PANTRY
30" REFRIG RANGE
30" ELEC.
DISHWASHER
BEDROOM
11'-0" X 13'-6"
KITCHEN
ENTRY
BATHROOM #1
PANTRY
STACK
W/D
TYPE B
ADAPTABLE
625 SF
A-1
LIVING ROOM
30" REFRIG
RANGE
30" ELEC.DISHWASHER
MECH
DECK
90 SF
ST
O
R
A
G
E
DECK
88SF ST
O
R
A
G
E
KITCHEN
SECOND BEDROOM
TYPE B
ADAPTABLE
1140 SF
D-1
ENTRY
BATHROOM #1
MASTER BEDROOM
MECH
BATHROOM #2
THIRD BEDROOM
PANTRY
30" REFRIGRANGE
30" ELEC.
DISHWASHER
ST
A
I
R
DI
S
H
W
A
S
H
E
R
RA
N
G
E
30
"
E
L
E
C
.
30
"
R
E
F
R
I
G
PANTRY
SECONDARY BEDROOM
BATHROOM #2
MASTER BEDROOM
BATHROOM #1
ENTRY
KITCHEN
DECK
79 SFST
O
R
A
G
E
TYPE B
ADAPTABLE
995 SF
C-1
STACK
W/D
DECK
67 SF
DECK
90 SF
DECK
88SF
FIRE
SPRINKLER
160'-1"
1'-8"12'-4"14'-8"12'-4"9'-0"11'-6"17'-0"9'-0"12'-4"14'-8"14'-0"3'-0"17'-1"11'-6"
UP
8
T
@
1
1
"
9
R
@
6
.
8
8
2
"
ST
A
I
R
UP
8
T
@
1
1
"
9
R
@
6
.
8
8
2
"
63
'
-
0
"
4'
-
0
"
1'
-
0
"
15
'
-
6
"
10
'
-
6
"
19
'
-
3
"
2'
-
9
"
4'
-
0
"
4'
-
0
"
2'
-
0
"
63
'
-
0
"
1'
-
0
"
3'
-
0
"
1'
-
0
"
1'
-
0
"
13
'
-
8
"
11
'
-
5
"
19
'
-
2
"
2'
-
9
"
4'
-
0
"
4'
-
0
"
2'
-
0
"
157'-1"
2'-6"11'-0"16'-2"11'-4"12'-5"12'-4"15'-8"10'-6"2'-6"
DISHWASHER
RANGE
30" ELEC.30" REFRIG
TYPE B
ADAPTABLE
935 SF
B-1
STACK
W/D
MASTER BEDROOM
SECONDARY BEDROOM
DECK
67 SF
ST
O
R
A
G
E
MECH
BA
T
H
R
O
O
M
#
1
KITCHEN
ENTRY
BATHROOM #2
DI
S
H
W
A
S
H
E
R
RA
N
G
E
30
"
E
L
E
C
.
30
"
R
E
F
R
I
G
PANTRY
PANTRY
SECONDARY BEDROOM
BATHROOM #2
MASTER BEDROOM
BATHROOM #1
ENTRY
KITCHEN
DECK
79 SF ST
O
R
A
G
E
TYPE B
ADAPTABLE
995 SF
C-1
STACK
W/D
12'-5"13'-6"11'-7"11'-8"13'-6"
AA2.0
1/8" = 1'-0"1 GROUND LEVEL FLOOR PLAN
GENERAL NOTES:
1.RE CIVIL PLANS FOR MAIN ELEVATIONS
2.ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT)
3.ALL WINDOWS / DOOR DIMENSIONS ARE TO CENTER OF WINDOW/DOOR U.N.O.
COORDINATE ROUGH OPENING DIMENSIONS WITH ASSOCIATED DOOR &
WINDOW DETAILS PRIOR TO CONSTRUCTION.
4.REFER TO CODE SHEETS FOR EGRESS.
5.DOOR FRAMES TO BE LOCATED 4" FROM CORNER OF INTERSECTING WALLS,
U.N.O.
6.WHERE PLYWOOD IS ADDED FOR SHEAR ON PARTIAL WALL, REMAINDER OF
WALL SHALL HAVE SIMILAR SHEATHING TO PROVIDE FLUSH WALL SURFACE,
RE:STRUCT FOR SHEAR WALL LOCATIONS.
7.REFER TO SLAB PLANS FOR SLAB ELEVATIONS, DEPRESSIONS, SLOPES,
DRAINS AND ADDITIONAL SLAB INFO.
8.EACH DWELLING UNIT WILL BE PROVIDED WITH A PORTABLE FIRE
EXTINGUISHER HAVING A MIN. RATING OF 1-A:10, SEE FIRE PROTECTION
PLANS. CONTRACTOR TO SUPPLY , INSTALL PER OWNERS INSTRUCTIONS.
9.SOFFIT FOR HVAC DUCT: MINIMIZE SIZE, KEEP HIGH AND TIGHT AS POSSIBLE
10.WINDOWS TO HAVE A MIN. STC RATING .30 / U VALUE MIN. RATING .28
11.WINDOWS TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS
VERTICAL FAUX WOOD BLINDS ON DOORS
12.ENSURE THAT ALL DOORS TO HAVE DOOR STOPS
13.COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH
DRAWER PULLS
14.PROVIDE CASING ON ALL DOOR OPENINGS 1
2" X 4" WITH EASED EDGE
15.PROVIDE BASE BOARD, 1
2" X 4" WITH EASED EDGE
16.CABINET SYSTEM PROFILE: APPROVE WITH OWNER IN ADVANCE
17.COUNTERTOPS: SOLID SURFACE WITH OWNER IN ADVANCE
2CM(3
4"), 4" H BACKSPLASH
18.VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE
CODES
19.COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES,
INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC.
20.PROVIDE BLOCKING FOR SHELVING AND ACCESSORIES
21.ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL
22.MICROWAVE W/ HOOD, LIGHT AND FAN BELOW
23.PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH
ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI
RECEPTANCE.
24.COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR.
25.ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE
NOTED. SEE ELECTRICAL PLANS.
26.RADON MITIGATION, EACH BUILDING TO RECEIVE UNDER SLAB MAT TO VENT
VERTICALLY THROUGH THE BUILDING IN 2X6 WALLS.
BEDROOM
11'-0" X 13'-6"
KITCHEN
ENTRY
BATHROOM #1
PANTRY
STACK
W/D
DISHWASHER
RANGE
30" ELEC.30" REFRIG
625 SF
A-1
LIVING ROOM
935 SF
B-1
STACK
W/D
MASTER BEDROOM
SECONDARY BEDROOM
ST
O
R
A
G
E
MECH
BA
T
H
R
O
O
M
#
1
KITCHEN
ENTRY
BATHROOM #2
30" REFRIG
RANGE
30" ELEC.DISHWASHER
MECH
ST
O
R
A
G
E
PANTRY
ST
O
R
A
G
E
KITCHEN
SECOND BEDROOM
1140 SF
D-1
ENTRY
BATHROOM #1
MASTER BEDROOM
MECH
BATHROOM #2
THIRD BEDROOM
PANTRY
30" REFRIG RANGE
30" ELEC.
DISHWASHER
BEDROOM
11'-0" X 13'-6"
KITCHEN
ENTRY
BATHROOM #1
PANTRY
STACK
W/D
625 SF
A-1
LIVING ROOM
30" REFRIG
RANGE
30" ELEC.DISHWASHER
MECH
DECK
90 SF
ST
O
R
A
G
E
DECK
88SF ST
O
R
A
G
E
KITCHEN
SECOND BEDROOM
1140 SF
D-1
ENTRY
BATHROOM #1
MASTER BEDROOM
MECH
BATHROOM #2
THIRD BEDROOM
PANTRY
30" REFRIGRANGE
30" ELEC.
DISHWASHER
DI
S
H
W
A
S
H
E
R
RA
N
G
E
30
"
E
L
E
C
.
30
"
R
E
F
R
I
G
PANTRY
SECONDARY BEDROOM
BATHROOM #2
MASTER BEDROOM
BATHROOM #1
ENTRY
KITCHEN
DECK
79 SFST
O
R
A
G
E
995 SF
C-1
STACK
W/D
DECK
67 SF
DECK
90 SF
DECK
88SF
FIRE
SPRINKLER
160'-1"
1'-8"12'-4"14'-8"12'-4"9'-0"11'-6"17'-0"9'-0"12'-4"14'-8"14'-0"3'-0"17'-1"11'-6"
63
'
-
0
"
4'
-
0
"
1'
-
0
"
15
'
-
6
"
10
'
-
6
"
19
'
-
3
"
2'
-
9
"
4'
-
0
"
4'
-
0
"
2'
-
0
"
63
'
-
0
"
1'
-
0
"
3'
-
0
"
1'
-
0
"
1'
-
0
"
13
'
-
8
"
11
'
-
5
"
19
'
-
2
"
2'
-
9
"
4'
-
0
"
4'
-
0
"
2'
-
0
"
157'-1"
2'-6"11'-0"16'-2"11'-4"12'-5"12'-4"15'-8"10'-6"2'-6"
DISHWASHER
RANGE
30" ELEC.30" REFRIG
935 SF
B-1
STACK
W/D
MASTER BEDROOM
SECONDARY BEDROOM
DECK
67 SF
ST
O
R
A
G
E
MECH
BA
T
H
R
O
O
M
#
1
KITCHEN
ENTRY
BATHROOM #2
DI
S
H
W
A
S
H
E
R
RA
N
G
E
30
"
E
L
E
C
.
30
"
R
E
F
R
I
G
PANTRY
PANTRY
SECONDARY BEDROOM
BATHROOM #2
MASTER BEDROOM
BATHROOM #1
ENTRY
KITCHEN
DECK
79 SF ST
O
R
A
G
E
995 SF
C-1
STACK
W/D
12'-5"13'-6"11'-7"11'-8"13'-6"
UP
8
T
@
1
1
"
9
R
@
6
.
8
8
2
"
UP
8
T
@
1
1
"
9
R
@
6
.
8
8
2
"
DN
DN
AA2.1
1/8" = 1'-0"1 SECOND LEVEL FLOOR PLAN
GENERAL NOTES:
1.RE CIVIL PLANS FOR MAIN ELEVATIONS
2.ALL FLOOR PLAN VERSIONS HAVE MIRRORED VERSION (RIGHT / LEFT)
3.ALL WINDOWS / DOOR DIMENSIONS ARE TO CENTER OF WINDOW/DOOR U.N.O.
COORDINATE ROUGH OPENING DIMENSIONS WITH ASSOCIATED DOOR &
WINDOW DETAILS PRIOR TO CONSTRUCTION.
4.REFER TO CODE SHEETS FOR EGRESS.
5.DOOR FRAMES TO BE LOCATED 4" FROM CORNER OF INTERSECTING WALLS,
U.N.O.
6.WHERE PLYWOOD IS ADDED FOR SHEAR ON PARTIAL WALL, REMAINDER OF
WALL SHALL HAVE SIMILAR SHEATHING TO PROVIDE FLUSH WALL SURFACE,
RE:STRUCT FOR SHEAR WALL LOCATIONS.
7.REFER TO SLAB PLANS FOR SLAB ELEVATIONS, DEPRESSIONS, SLOPES,
DRAINS AND ADDITIONAL SLAB INFO.
8.EACH DWELLING UNIT WILL BE PROVIDED WITH A PORTABLE FIRE
EXTINGUISHER HAVING A MIN. RATING OF 1-A:10, SEE FIRE PROTECTION
PLANS. CONTRACTOR TO SUPPLY , INSTALL PER OWNERS INSTRUCTIONS.
9.SOFFIT FOR HVAC DUCT: MINIMIZE SIZE, KEEP HIGH AND TIGHT AS POSSIBLE
10.WINDOWS TO HAVE A MIN. STC RATING .30 / U VALUE MIN. RATING .28
11.WINDOWS TREATMENTS: HORIZONTAL FAUX WOOD BLINDS ON WINDOWS
VERTICAL FAUX WOOD BLINDS ON DOORS
12.ENSURE THAT ALL DOORS TO HAVE DOOR STOPS
13.COORDINATE DOOR PULL LOCATIONS SO AS NOT TO INTERFERE WITH
DRAWER PULLS
14.PROVIDE CASING ON ALL DOOR OPENINGS 1
2" X 4" WITH EASED EDGE
15.PROVIDE BASE BOARD, 1
2" X 4" WITH EASED EDGE
16.CABINET SYSTEM PROFILE: APPROVE WITH OWNER IN ADVANCE
17.COUNTERTOPS: SOLID SURFACE WITH OWNER IN ADVANCE
2CM(3
4"), 4" H BACKSPLASH
18.VERIFY MOUNTING HEIGHTS AND KNEE CLEARANCES WITH ALL APPLICABLE
CODES
19.COMPLY WITH LATEST ADA ACCESSIBILITY STANDARDS AND GUIDELINES,
INCLUDING GRAB BAR LOCATIONS, MOUNTING HEIGHTS, CLEARANCES, ETC.
20.PROVIDE BLOCKING FOR SHELVING AND ACCESSORIES
21.ELECTRICAL PANEL - PAINT TO MATCH ADJACENT WALL
22.MICROWAVE W/ HOOD, LIGHT AND FAN BELOW
23.PROVIDE GFI RECEPTACLES AT REQUIRED LOCATIONS IN ACCORDANCE WITH
ALL APPLICABLE CODES. DO NOT USE GFI CIRCUIT BREAKER IN LIEU OF GFI
RECEPTANCE.
24.COORDINATE COVER PLATES / PLUGS IN ADVANCE WITH FINISH WALL COLOR.
25.ELECTRICAL OUTLETS SHALL BE MOUNTED AT 18" AFF UNLESS OTHERWISE
NOTED. SEE ELECTRICAL PLANS.
26.RADON MITIGATION, EACH BUILDING TO RECEIVE UNDER SLAB MAT TO VENT
VERTICALLY THROUGH THE BUILDING IN 2X6 WALLS.
BEDROOM
11'-0" X 13'-6"
KITCHEN
ENTRY
BATHROOM #1
PANTRY
STACK
W/D
DISHWASHER
RANGE
30" ELEC.30" REFRIG
625 SF
A-1
LIVING ROOM
935 SF
B-1
STACK
W/D
MASTER BEDROOM
SECONDARY BEDROOM
ST
O
R
A
G
E
MECH
BA
T
H
R
O
O
M
#
1
KITCHEN
ENTRY
BATHROOM #2
30" REFRIG
RANGE
30" ELEC.DISHWASHER
MECH
ST
O
R
A
G
E
PANTRY
ST
O
R
A
G
E
KITCHEN
SECOND BEDROOM
1140 SF
D-1
ENTRY
BATHROOM #1
MASTER BEDROOM
MECH
BATHROOM #2
THIRD BEDROOM
PANTRY
30" REFRIG RANGE
30" ELEC.
DISHWASHER
BEDROOM
11'-0" X 13'-6"
KITCHEN
ENTRY
BATHROOM #1
PANTRY
STACK
W/D
625 SF
A-1
LIVING ROOM
30" REFRIG
RANGE
30" ELEC.DISHWASHER
MECH
DECK
90 SF
ST
O
R
A
G
E
DECK
88SF ST
O
R
A
G
E
KITCHEN
SECOND BEDROOM
1140 SF
D-1
ENTRY
BATHROOM #1
MASTER BEDROOM
MECH
BATHROOM #2
THIRD BEDROOM
PANTRY
30" REFRIGRANGE
30" ELEC.
DISHWASHER
DI
S
H
W
A
S
H
E
R
RA
N
G
E
30
"
E
L
E
C
.
30
"
R
E
F
R
I
G
PANTRY
SECONDARY BEDROOM
BATHROOM #2
MASTER BEDROOM
BATHROOM #1
ENTRY
KITCHEN
DECK
79 SFST
O
R
A
G
E
995 SF
C-1
STACK
W/D
DECK
67 SF
DECK
90 SF
DECK
88SF
FIRE
SPRINKLER
160'-1"
1'-8"12'-4"14'-8"12'-4"9'-0"11'-6"17'-0"9'-0"12'-4"14'-8"14'-0"3'-0"17'-1"11'-6"
63
'
-
0
"
4'
-
0
"
1'
-
0
"
15
'
-
6
"
10
'
-
6
"
19
'
-
3
"
2'
-
9
"
4'
-
0
"
4'
-
0
"
2'
-
0
"
63
'
-
0
"
1'
-
0
"
3'
-
0
"
1'
-
0
"
1'
-
0
"
13
'
-
8
"
11
'
-
5
"
19
'
-
2
"
2'
-
9
"
4'
-
0
"
4'
-
0
"
2'
-
0
"
157'-1"
2'-6"11'-0"16'-2"11'-4"12'-5"12'-4"15'-8"10'-6"2'-6"
DISHWASHER
RANGE
30" ELEC.30" REFRIG
935 SF
B-1
STACK
W/D
MASTER BEDROOM
SECONDARY BEDROOM
DECK
67 SF
ST
O
R
A
G
E
MECH
BA
T
H
R
O
O
M
#
1
KITCHEN
ENTRY
BATHROOM #2
DI
S
H
W
A
S
H
E
R
RA
N
G
E
30
"
E
L
E
C
.
30
"
R
E
F
R
I
G
PANTRY
PANTRY
SECONDARY BEDROOM
BATHROOM #2
MASTER BEDROOM
BATHROOM #1
ENTRY
KITCHEN
DECK
79 SF ST
O
R
A
G
E
995 SF
C-1
STACK
W/D
12'-5"13'-6"11'-7"11'-8"13'-6"
DN
DN
AA2.2
1/8" = 1'-0"1 THIRD LEVEL FLOOR PLAN
4"
3'
-
1
"
1 1/4" X 1
2" PAINTED
FLAT STL PLATE
FINISHED
FLOOR
3
8" (OD) PAINTED
STL RAILING
1" (OD) PAINTED
STL RAIL
6" X 6" STL PLATE
RE: STRUCT
VARIESVARIES
8"
3
8" (OD) PAINTED
STL RAILING
1" (OD) PAINTED
STL RAIL1 1/4" x 1
2" PAINTED
FLAT STL PLATE
1 1/4" X 1
2" PAINTED
FLAT STL PLATE
1 1/4" x 1
2" PAINTED
FLAT STL PLATE
6" X 6" STL PLATE
RE: STRUCT
1" X 2" X 1/4" PAINTED
"L" FLANGE, FASTEN TO
BUILDING
2x BLOCKING IN
WALL ASSEMBLY
2x BLOCKING IN
WALL ASSEMBLY
BUILDING A - EXTERIOR FINISH SCHEDULE
TAG ITEM MATERIAL COLOR
R1 PRIMARY ROOF TAMKO 30 YR - HERITAGE (CLASS A REQUIRED)
D1 DRIP EDGE ALUMINUM (PREFINISHED)MATCH ADJACENT ROOF
F1 FASCIA @ R1 FIBER CEMENT BOARDS - 5/4 RUSTIC x 9.25"
F3 SOFFIT FIBER CEMENT SOFFIT PANELS -
VENTED CEDARMILL
S1 HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3
4" X 5 1
4"
6" EXPOSED - @ WINDOW / DOOR INFILL
W1 DOORS AND WINDOWS PREMIUM VINYL BRONZE
T1 DOORS AND WINDOWS TRIM FIBER CEMENT -4
4 RUSTIC 3.5" RAILS
4
4 RUSTIC 5.5" HEAD AND SILL
T3 HORIZONTAL SIDING TRIM
@ ENTRY
FIBER CEMENT - 5
4 RUSTIC 9.25" / 11.25"
T4 INSIDE CORNER TRIM FIBER CEMENT - 5
4 RUSTIC 3.5"
T5 OUTSIDE CORNER TRIM FIBER CEMENT - 5
4 RUSTIC 5.5"
T6 FRIEZE TRIM FIBER CEMENT - 5
4 RUSTIC 5.5"
1. IN THE CASE OF ANY DISCREPANCIES BETWEEN THIS SCHEDULE AND OTHER
CONTRACT DOCUMENTS,
THE INFORMATION ON THIS SCHEDULE SHALL TAKE PRECEDENCE.
2. ALL FLASHING, VENTS, FLUES, ROOFTOP MECHANICAL EQUIPMENT, UTILITY BOXES,
AND SIMILAR ITEMS SHALL BE PAINTED
TO MATCH ADJACENT PORTIONS OF BUILDINGS UNLESS OTHERWISE NOTED.
3. TYPICAL SIDEWALL FLASHING: ICE&WATER SHIELD 2'-6" VERT UP WALL; WRAP INTO
OPENINGS, THEN APPLY TYVEK FLASHING TAPE AROUND PENETRATING PIPE.
METAL FLASHING EXPOSED 6" UP WALL: TYPICAL AT ALL SIDEWALL CONDITIONS.
S4 METAL SIDING PANELS METAL WALL SYSTEM - PBC
T2 SIDING TRIM FIBER CEMENT - 5
4 RUSTIC 5.5"
S3 STUCCO
4. THESE ELEVATIONS ARE CONCEPTUAL IN NATURE, INDIVIDUAL BUILDING ELEVATIONS
MAY VARY BUT WILL BE EVALUATED FOR COMPLIANCE WITH DESIGN STANDARDS
CONTAINED WITHIN ESTES PARK CODE AT THE TIME OF SUBMITTING A BUILIDNG PERMIT
APPLICATION.
2 COAT STUCCO SYSTEM W/ INTEGRAL COLOR
MTL1 METAL RAILING CUSTOM DESIGN POWDER COAT - BLACK
R2 SECONDARY ROOF STANDING SEAM METAL ROOF BRONZE
S2 HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3
4" X 9 1
4"
6" EXPOSED - @ WINDOW / DOOR INFILL
F2 FASCIA @ R2 FIBER CEMENT BOARDS - 5/4 RUSTIC x 6.25"
T.O. PLYWOOD - 103'-0"
1st. LEVEL
T.O. PLYWOOD - 113'-3 3/4"
2nd. LEVEL
T.O. PLYWOOD - 123'-7 1/2"
3rd. LEVEL
132'-8 5/8"
SPRING POINT
T.O. PLYWOOD - 100'-0"
1st. LEVEL
T.O. PLYWOOD - 110'-3 3/4"
2nd. LEVEL
T.O. PLYWOOD - 120'-7 1/2"
3rd. LEVEL
129'-8 5/8"
SPRING POINT
S3
S3
S3
S3
S4
S4
S1S2
S2
T.O. PLYWOOD - 100'-0"
1st. LEVEL
T.O. PLYWOOD - 110'-3 3/4"
2nd. LEVEL
T.O. PLYWOOD - 120'-7 1/2"
3rd. LEVEL
129'-8 5/8"
SPRING POINT
T.O. PLYWOOD - 103'-0"
1st. LEVEL
T.O. PLYWOOD - 113'-3 3/4"
2nd. LEVEL
T.O. PLYWOOD - 123'-7 1/2"
3rd. LEVEL
132'-8 5/8"
SPRING POINT
R1
R2
D1
F1 F2
S1
S4
S2
S1
S1 S1
S1
S3
S3
S3
S3
S3
S3
S2
S2
BUILDING A - ELEVATIONS
1/8" = 1'-0"1 BUILDING A - NORTH ELEVATION
1/8" = 1'-0"2 SOUTH ELEVATION
1/2" = 1'-0"3 FAUX BALCONY DETAIL
AA4.0
ME
F
4/
0
8
/
2
0
2
1
T.O. PLYWOOD - 100'-0"
1st. LEVEL
T.O. PLYWOOD - 110'-3 3/4"
2nd. LEVEL
T.O. PLYWOOD - 120'-7 1/2"
3rd. LEVEL
129'-8 5/8"
SPRING POINT
S4
S1
S1
S2
T.O. PLYWOOD - 103'-0"
1st. LEVEL
T.O. PLYWOOD - 113'-3 3/4"
2nd. LEVEL
T.O. PLYWOOD - 123'-7 1/2"
3rd. LEVEL
132'-8 5/8"
SPRING POINT
FIRE
SPRINKLER
S1
S1
S1
S2
BUILDING A - EXTERIOR FINISH SCHEDULE
TAG ITEM MATERIAL COLOR
R1 PRIMARY ROOF TAMKO 30 YR - HERITAGE (CLASS A REQUIRED)
D1 DRIP EDGE ALUMINUM (PREFINISHED)MATCH ADJACENT ROOF
F1 FASCIA @ R1 FIBER CEMENT BOARDS - 5/4 RUSTIC x 9.25"
F3 SOFFIT FIBER CEMENT SOFFIT PANELS -
VENTED CEDARMILL
S1 HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3
4" X 5 1
4"
6" EXPOSED - @ WINDOW / DOOR INFILL
W1 DOORS AND WINDOWS PREMIUM VINYL BRONZE
T1 DOORS AND WINDOWS TRIM FIBER CEMENT -4
4 RUSTIC 3.5" RAILS
4
4 RUSTIC 5.5" HEAD AND SILL
T3 HORIZONTAL SIDING TRIM
@ ENTRY
FIBER CEMENT - 5
4 RUSTIC 9.25" / 11.25"
T4 INSIDE CORNER TRIM FIBER CEMENT - 5
4 RUSTIC 3.5"
T5 OUTSIDE CORNER TRIM FIBER CEMENT - 5
4 RUSTIC 5.5"
T6 FRIEZE TRIM FIBER CEMENT - 5
4 RUSTIC 5.5"
1. IN THE CASE OF ANY DISCREPANCIES BETWEEN THIS SCHEDULE AND OTHER
CONTRACT DOCUMENTS,
THE INFORMATION ON THIS SCHEDULE SHALL TAKE PRECEDENCE.
2. ALL FLASHING, VENTS, FLUES, ROOFTOP MECHANICAL EQUIPMENT, UTILITY BOXES,
AND SIMILAR ITEMS SHALL BE PAINTED
TO MATCH ADJACENT PORTIONS OF BUILDINGS UNLESS OTHERWISE NOTED.
3. TYPICAL SIDEWALL FLASHING: ICE&WATER SHIELD 2'-6" VERT UP WALL; WRAP INTO
OPENINGS, THEN APPLY TYVEK FLASHING TAPE AROUND PENETRATING PIPE.
METAL FLASHING EXPOSED 6" UP WALL: TYPICAL AT ALL SIDEWALL CONDITIONS.
S4 METAL SIDING PANELS METAL WALL SYSTEM - PBC
T2 SIDING TRIM FIBER CEMENT - 5
4 RUSTIC 5.5"
S3 STUCCO
4. THESE ELEVATIONS ARE CONCEPTUAL IN NATURE, INDIVIDUAL BUILDING ELEVATIONS
MAY VARY BUT WILL BE EVALUATED FOR COMPLIANCE WITH DESIGN STANDARDS
CONTAINED WITHIN ESTES PARK CODE AT THE TIME OF SUBMITTING A BUILIDNG PERMIT
APPLICATION.
2 COAT STUCCO SYSTEM W/ INTEGRAL COLOR
MTL1 METAL RAILING CUSTOM DESIGN POWDER COAT - BLACK
R2 SECONDARY ROOF STANDING SEAM METAL ROOF BRONZE
S2 HORIZONTAL LAP SIDING FIBER CEMENT LAP SIDING - 3
4" X 9 1
4"
6" EXPOSED - @ WINDOW / DOOR INFILL
F2 FASCIA @ R2 FIBER CEMENT BOARDS - 5/4 RUSTIC x 6.25"
BUILDING A - ELEVATIONS
1/8" = 1'-0"3 WEST ELEVATION
1/8" = 1'-0"4 EAST ELEVATION
AA4.1
4/
0
8
/
2
0
2
1
ME
F
12
6
3RD. LEVEL
UNIT
2ND. LEVEL
UNIT
3RD. LEVEL
SPRING POINT
1ST. LEVEL
UNIT
2ND. LEVEL
T.O. PLYWOOD - 103'-0"
1st. LEVEL
AA6.2
9
AA6.2
21
AA9.0
22
AA6.2
25
VARIES
AA3.0
5
T.O. PLYWOOD - 113'-3 3/4"
T.O. PLYWOOD - 123'-7 1/2"
132'-8 5/8"
12
6
3RD. LEVEL
UNIT
2ND. LEVEL
UNIT
3RD. LEVEL
SPRING POINT
1ST. LEVEL
UNIT
2ND. LEVEL
1st. LEVEL
AA6.2
9
AA6.2
21
AA9.0
22
AA6.2
25
VARIES
AA3.0
5
T.O. PLYWOOD - 103'-0"
T.O. PLYWOOD - 113'-3 3/4"
T.O. PLYWOOD - 123'-7 1/2"
132'-8 5/8"
1/2" = 1'-0"1 TYPICAL WALL SECTION @ 6:12
TYPICAL WALL SECTION
1/2" = 1'-0"2 TYPICAL WALL SECTION @ 4:12
NOTE:
BUILDING A = 103'-0" GARDEN LEVEL TO FIRST FLOOR
BUILDING B = GARDEN LEVEL TO FIRST FLOOR
BUILDING C = GARDEN LEVEL TO FIRST FLOOR
BUILDING D = GARDEN LEVEL TO FIRST FLOOR
AA5.0
4/
0
8
/
2
0
2
1
ME
F