HomeMy WebLinkAboutSTAFF REPORT Amended Development Plan Black Canyon Resort 800 MacGrevor Ave 2018-11-13
COMMUNITY DEVELOPMENT
Staff Report
To:Estes Valley Planning Commission
From:Robin Becker–Planner I
Date:November 13, 2018
RE:DevelopmentPlanAmendment–Black Canyon Inn
Applicant Request:
Approval of a Development Plan for a project consisting of commercial and accommodation
uses.
Planning Commission Objectives:
1. Review for compliance with the Estes Valley Development Code (EVDC);
2. Conduct a public hearing to consider applicant’s testimony, public comment, and Town staff’s
findings and analysis; and
3. Approveor denythe Development Plan application.
Location:
800MacGregorAve. 11,north ofE. WonderviewAve. and east of MacGregorAve., legally
described asLot 2, Amended and Restate Black Canyon Inn Minor Subdivision.
Vicinity Map:See Attachment #1
Owner/Applicant:Black Canyon Resort, LLC
Applicant’s Representative:Cornerstone Engineering & Surveying Inc.-Jes Reetz
Project Description:
Present Situation:The subject property is 4.047acres in size and ismainlyundeveloped. The
site is zoned A(Accommodations).
Proposal: Development of a150-seat wedding venueat 11,900square feet, onemotel-style
accommodationsbuildingat 7,100square feet,and 8 condo-style accommodation units.
The wedding venue will be accessory to theprincipal accommodations use.The wedding venue
is proposed to be over the allowed 1,000 square feet per EVDC §5.2.D.4, “Maximum Building or
Structure Size for Nonresidential Uses”.See Variances.
Variances: Per EVDC§5.2.D.4 “Maximum Building or Structure Size for Nonresidential Uses”,
free standing accessory buildings and structures shall not be larger than one-thousand (1,000)
square feet of gross floor area.
A variancehas been scheduled for reviewby the Board of Adjustment on December 4, 2018 to
allow the accessory use(wedding venue) to exceed the allowed 1,000 square feet.
Currently the code does not allow an accessory structure to be over 1000 square feet.
Site Data Table:
Consultant:Jes Reetz,Cornerstone Engineering
Parcel Number:3524473002Development Area:4.047acres
Existing Land Use:Residential BuildingProposed Land Use: Commercial and
and mainly undevelopedAccommodations
Zoning Designation:A,Accommodations
Adjacent Zoning:
East: E-1, EstateNorth: R, Residential
West:A,AccommodationsSouth: RM,Residential Multifamily, A,
Accommodations
Adjacent Land Uses:
East: Black Canyon HillsAddition,Single-North: MacGregor Ranchand open space
Family Residences
West: Lodges at Black Canyon Inn South: Meyers addition, Ridgeview
Condos, Meyers Addition 1970 Division, Condos, and Single-Family Residences
Condo andSingle-Family Residences
Services:
Water: Town of Estes ParkSewer: Estes Park Sanitation District
Review Criteria:
Depending upon the complexity of the project, this section may be a brief summary of the
standards of review or may involve a more detailed analysis of the standards based upon issues
relevant to any particular project.
1.Buildings and Lots.Two main buildings (wedding venue and motel-style
accommodation building)areproposedalong with eightcondo-style accommodation
units.The accommodation and wedding venue buildingsare proposed to be two levels.
The eight accommodation units are proposed to be two levels as well.The buildingsand
site meet height restrictions, lot coverage, and setback requirements.
th
The applicantmet with many of the neighbors on August 302018,the result of this
meeting was the removal of a third floor in the 14-unit accommodation building. This will
result inminor obstruction of range views. Notethat views are not protected within the
EVDC, therefore thereduction in height was voluntary on behalf of the applicant.
2.Landscaping.The project is required to plant aminimum of one(1) tree for each forty
(40) lineal feet of street frontage and one (1) shrub for each fifteen (15) lineal feet of
street frontage. Theapplicant exceeds this requirement.
A minimum buffer of 8 evergreen trees and 11 shrubs per 100 linear feet of district
boundary between residential and accommodation/commercialzoning is required.
The northern boundary buffer requirement has been met.
The western boundary buffer requirement has been met.
The eastern boundary buffer requirement has been met.
Page 2of 5
Planning Commission, November13, 2018
Black Canyon Inn AmendedDevelopment Plan
3.Water.Water is to be provided by the Town of Estes Park Water Division. The Division
has outlined numerous requirements for the development, some of which have been
addressed by the applicant on theDevelopment Plan, and some of which are applicable
to construction and the building permit stage.
4.Fire Protection. Estes Valley Fire Protection District provided comments regarding
hydrants,egress,and approach.Applicable comments at this stage have been
addressed with the Development Plan, other comments regarding egress, alarms and
fire protection system plans will be addressed at the building permit stage.
5.Electric.Electric service is to be provided by the Town of Estes Park Light and Power
Division. The Division’s requirements have been met.
6.Sanitary Sewer.The Estes Park Sanitation District, who will provide central sewer
service to the proposed development, had comments pertaining to easement access,
line locations, and cleanout locations. All comments have been addressed.
7.Stormwater Drainage.A drainage study was submitted, and reviewed by engineering
staff with the Town of Estes Park Public Works Department. Public works has no
objection.
8.Access.Access to the site is proposed to be a full-serviceaccess via MacGregorAve.A
traffic impact study (TIS) was conducted for the project. The TIS evaluatedLevel of
Service (LOS) impacts resulting from the proposed development.Improvements are
proposed along the access route from MacGregor Ave. to the site. These improvements
will match existing driveway grades. Three access easements exist to allow access
through the Ridge View Condominiums, through Black Canyon Inn and through the
Overlook Condominiums. Public works has no objection.
9.Sidewalk/Trail.The applicant has proposed an 8’ trail along MacGregor Ave.with
pedestrian connections to both the wedding venue and the accommodations building.
10.Parking.The applicant has proposed 60 parking spaces per the table below.
UseRequirementProvided
High Intensity1 per guest room<750 sq. 17
Accommodationsft. or (14 rooms proposed)
(EVDC 7.11)1 space per 3 employees
(9 employees proposed)
Commercial Recreation “All other” 1 per 200 Sq. 27
or entertainment Ft.
establishment, Indoor7100 sq. ft. of total patron
(EVDC 7.11)space proposed. 7130/200
=35.65 x 75%= 26.7
(27spaces)
Resort Lodge/Cabins -(2) per cabin or guest 4
(EVDC 7.11)2 Future room
Accommodation Units
Page 3of 5
Planning Commission, November13, 2018
Black Canyon Inn AmendedDevelopment Plan
Resort Lodge/Cabins -(2) per cabin or guest 8
(EVDC 7.11)Units 13-16room
Resort Lodge/Cabins -(2) per cabin or guest 4
(EVDC 7.11)Units 11 & room
12
11.Outdoor Lighting.All lighting will be shielded and deflected down in compliance with
EVDC §7.9.
12.Comprehensive Plan. This project conforms to goals and policies within the
Comprehensive Plan. Specifically,as follows:
Policy 2.4 Initiate planting programs to soften the visual impact of existing
development.
o Buildings that must be located in open areas should be clustered,
designed and landscaped to blend into their surroundings to the
maximum extent possible.
o Removal of trees on steep slopes and ridgelines should be discouraged
except as required for wildfire protection.
Policy 3.1 Encourage infill of older coreareas in order to reduce infrastructure
costs and to stabilize residential neighborhoods.
Policy 7.1 Maintain a unique blend of businesses, residents and visitors, without
negatively affecting the natural beauty of the Estes Valley.
This proposed development is located in between the North End Planning Sub Area and
the Downtown Planning Sub area, not quite in both. The proposed development has
voluntarilybeen reduced in heightin a manner that attempts to protect neighboring
views of the range, and recedes into the hillside.This coincides with the downtown land
use goal of “the downtown area is intended to develop as a dominant commercial core,
consisting of a variety of character districts”. The North End planning area with regard to
MacGregor Ranch recommends cluster development patterns that should be utilized to
enhance open space opportunities. This development meets these two goals.
Public Notice:
Written notice has been mailed to adjacent property owners in accordance with EVDC, Section
3.15 General Notice Provisions. A legal notice was published in the Estes Park Trail-Gazette
and the application is posted on the Town’s “Current Applications” webpage. The applicant has
also posted a“development proposal under review” sign on the property.
Public Interest: Medium
There is some opposition to the project from area residents, namely residents of the Black
Canyon Hills Addition Subdivision.Overall design, traffic, pedestrian safety, and access are the
main concerns expressed inletters of opposition.
Page 4of 5
Planning Commission, November13, 2018
Black Canyon Inn AmendedDevelopment Plan
Following meetings with the neighbors and Black Canyon Innproperty owner, some
neighborhood support was received.
All comments received are available at: www.estes.org/currentapplications
Staff Findings:
Based on the foregoing, staff finds:
1.The Planning Commission is the Decision Making Body for the Development Plan.
Adequate public/private facilities are currently available to serve the proposed project.
2.The development plan is consistent with the recommendations of the Estes Valley
Comprehensive Plan.
3.This request has been submitted to all applicable reviewing agency staff for consideration
and comment. Concerns and issues that were raised have been addressed or will be
addressed at time of building permit.
Recommendation:
Staff recommendsapproval of the Black Canyon Wedding Venue Development Planwith the
conditionthat the applicant receivea variance from the Board of Adjustment for the size of the
wedding venue.
Sample motion:
1.I move to approvethe Black Canyon Wedding Venue Development Plan application
according to findings of fact with findings and conditions recommended by Staff.
2.I move to continuethe Black Canyon Wedding Venue Development Plan application to
the next regularly scheduled meeting, finding that … \[state reasons for continuing\].
3.I move to deny theBlack Canyon Wedding VenueDevelopment Plan application, finding
that … \[state findings for denial\].
Attachments:
1.Vicinity Map
2.Statement of Intent
3.Application
4.Development Plan Set
5.Building Elevations & Floorplans
6.Public Comments
Page 5of 5
Planning Commission, November13, 2018
Black Canyon Inn AmendedDevelopment Plan
Tiffu!Op;
QMBO
Tiffu!Ujumf;
EE
2204103128
Jttvf;Ebuf;
305/2305/2
65(.1#
EO
DIBTF
2(7#y6(21#
9(.1#
21(.1#4(.1#
8(.22!405#
E4(.1#4(.4#E
4(.1#
314
21(.1#
SFG/!O
21(.1#
E
7(.7#
34(.7!205#6!203#
Fwfout!Cvjmejoh
21(.1#
Cmbdl!Dbozpo!Sftpsu!MMD
8(.1#E
FYJU
21(.1#
CBMDPOZ
20B5/320B5/3
Mpu!3-!Cmbdl!Dbozpo!Joo!Ftuft!Qbsl!DP-!91628
41(.1#
313
58(.7#
43(.1#
311!TFBUT
7#!B/G/G/
CBMDPOZ
DFSFNPOZDFSNPOZ
21(.1#
E
8(.1#
21(.1#
Dfsfnpoz!Gmpps 4027#!>!!!!2(.1#
7(.7#E
34(.7!205#
2
9(.1#
21(.1#4(.1#
323
E4(.1#4(.4#E
4(.1#
315
4(.1#8(.1#
BW
DIBTF
2(21#y6(
4(.1#8(.1#7(.1#9(.1#
321322
EO
Mpohnpou-!Dpmpsbep!91615
3118!211Zs!Qbsuz!Du-!Tuf!$2
20B5/420B5/4
8(.3#8(.3#
21(.1#
E
7(.1#7(.1#7(.1#
312311
FOUSZ
IBMM
2(7#y5(9#
B!!S!!D!!I!!J!!U!!F!!D!!U!!V!!S!!F!!!!!!Q!/!!D!/
DIBTF
34(.7#
FMFW/
4(.1#8(.1#
CBTFE!PO!PUJT!4111
2(.6#
31:
DPVOUFS0XBSESPCF6(.1#
3(.1#
NFO
20B5/520B5/5
6(.1#E
E
5(.1#
9(.1#
CBTJT
8(.1#
4(.1#
4(.1#8(.1#
4(.1#317
cbt2t/dpn
ª!!
318
319
:81/697/:251
Bsdijufduvsf-!Q/D/
56(.7#
6(.1#6(.1#
DIBTF
2(4#y2(6#
E
3(.1#
WBOJUZ
XPNFO
E5(.1#
WBOJUZ
4(.1#
SPPN
CSJEF(T
3(.7#E
4(.1#
8(.1#
3(.7#E
DIBTF4(y2(5#
33(.1#
E4(.1#
4(.1#
E
3(.7#
9(.1#
CSJEF(T
23(.6!205#:(.7!405#:(.4!203#25(.3!203#8(.7!205#
CBMDPOZ
7(.1#
316
30B5/530B5/5
4(.1#4(.1#7(.1#4(.1#4(.1#4(.1#
EEE
21(.1#9(.1#7(.8!405#31(.1#31(.1#
20B5/1
20B5/2
Tiffu!Op;
20B5/1
20B5/2
QMBO
Tiffu!Ujumf;
SPDL
PVUDSPQQJOH
EE
2204103128
Jttvf;Ebuf;
VQ
QBUJPTUJFSFE
UP!HSBEF
213
EEE 61(.1#E 22(.9#
9(.1#
5(.1#:(.1#5(.1#:(.1#5(.1#:(.1#27(.1#5(.1#:(.1#
21!203#
DBLF
PG
UBCMF
IPOPS
32(.1#
9(.1#
305/2305/2
25(.7#
212
HJGU0CVGGFU
SFG/!O
Fwfout!Cvjmejoh
6(.7#!UZQ/6(.1#!UZQ/4(.3#!UZQ/
2(7#y6(.21#
DIBTF
QB
6(.7#!UZQ/
:(.1#
Cmbdl!Dbozpo!Sftpsu!MMD
E7(.7#
6(.1#9(.1#
221
3(.7#
E
:(.1#
Mpu!3-!Cmbdl!Dbozpo!Joo!Ftuft!Qbsl!DP-!91628
:(.1#
E7(.7#
EFDL
Cborvfu!Ibmm 4027#!>!!!!2(.1#
3(.7#
4:(.8#
:(.1#E
2
9(.1#
20B5/320B5/3
25(.7#
211
)281!.!311!TFBUT*
CBORVFU!IBMM
3(.7#
:(.1#E
:(.1#
E7(.7#
Mpohnpou-!Dpmpsbep!91615
3118!211Zs!Qbsuz!Du-!Tuf!$2
233(.1#
21:
B!!S!!D!!I!!J!!U!!F!!D!!U!!V!!S!!F!!!!!!Q!/!!D!/
6(.1#9(.1#
9(.8#
7(.8!405#
2(21#y6(
DIBTF
CBS
DM
HJGU0CVGGFU
6(.1#
EO
2
2
2
#
CBTJT
2231
.
(
#
9
1
20B5/420B5/4
.
(
cbt2t/dpn
ª!!
4
:81/697/:251
Bsdijufduvsf-!Q/D/
9(.1#
4(.7#8(.1#
CBS
TUPSBHF
VQ
2(7#y5(9#
JDF
DIBTF
7(.6#6!203#
33(.21#
6!203#
4(.1#2#4(.1#2#6(.1!405#
FMFW/
4(.1#8(.1#
CBTFE!PO!PUJT!4111
HMBTT
SBDLT
214
5(.:!405#EJTI
20B5/520B5/5
2#
:(.4!203#25(.3!203#7(.5!203#6(.4!405#22(.21#22(.21#8(.:#23(.22!205#22(.8#
XPNFO
8(.1#
4(.1#
217
4(.22!203#4(.22!203#21(.1#
G
DIBTF
2(4#y2(6#
4(.1#8(.1#
218
NFO
DIBTF4(y2(5#
IPPET
41(.1#41(.1#
LJUDIFO
QSFQ0DPPL!MJOF
DPPMFS
NPQ
30B5/530B5/5
8(.1#
4(.1#
225
5(.1#8(.1#
224
GJSF
SJTFS
XPSL!UBCMF
4(.1#8(.1#5(.1#8(.1#
216215
9(.1#7(.8!405#51(.1#21(.1#
20B5/1
20B5/2
Tiffu!Op;
TUPOFPVUDSPQQJOH
TUBJST!UP!MPXFS!QBUJPUISPVHI!TUPOF!PVUDSPQQJOH
FMFWBUJPOT
OPUF;!BMM!FYUFSJPS!MJHIUJOH!UP!NFFU
EBSL!TLZ!SFRVJSFNFOUT!QFS!FWED!8/:TQSFBE!DMBTT!PG!JJJ!)87.311*!PS!CFUUFS
OPUF;!FYUFSJPS!TJEJOH!UP!IBWF!B!GMBNF
Tiffu!Ujumf;
EE
MPH!BDDFOUT
2204103128
Jttvf;Ebuf;
9
23
QPSDI
Tpvui!Fmfwbujpo 4027#!>!!!!2(.1#
Fwfout!Cvjmejoh
2
Cmbdl!Dbozpo!Sftpsu!MMD
Mpu!3-!Cmbdl!Dbozpo!Joo!Ftuft!Qbsl!DP-!91628
21
IPSJ\[/!TJEJOH-!UZQ/
23
23
21
!MPH0UJNCFS!FOUSZ!SPPG
Mpohnpou-!Dpmpsbep!91615
3118!211Zs!Qbsuz!Du-!Tuf!$2
B!!S!!D!!I!!J!!U!!F!!D!!U!!V!!S!!F!!!!!!Q!/!!D!/
WFSU/!XPPE!BDDFOU!TJEJOH
CBTJT
MPH0UJNCFS!FOUSZ!SPPG
cbt2t/dpn
ª!!
:81/697/:251
Bsdijufduvsf-!Q/D/
23
9
23
PYJEJ\[FE!NFUBM!SPPGT
9
LJUDIFO!QBSBQFU
DFEBS!DIBOOFM!TJEJOH
Xftu!Fmfwbujpo 4027#!>!!!!2(.1#
3
CSJEF(T!SPPN
LJUDIFO!FOUSZ
CSJEF(T!CBMDPOZ
TIFE!SPPG
PWFS!LJUDIFO
DFEBS!DIBOOFM!TJEJOH
TUPOF-!UZQ/
Tiffu!Op;
FMFWBUJPOT
Tiffu!Ujumf;
MPH!BDDFOUT-!UZQ/
EE
2204103128
Jttvf;Ebuf;
WFSU/!BDDFOU!TJEJOH
23
9
39(.21!405#
Fwfout!Cvjmejoh
UFSSBDFE!QBUJPTTUFQQJOH!EPXO!HSBEF
Cmbdl!Dbozpo!Sftpsu!MMD
IPSJ\[/!TJEJOH-!UZQ/
BMM!SBJMJOHNJO/!4(.7#!B/G/G/BMM!HBQT!=5#!UZQ/
Mpu!3-!Cmbdl!Dbozpo!Joo!Ftuft!Qbsl!DP-!91628
WFSU/!BDDFOU!TJEJOH
Mpohnpou-!Dpmpsbep!91615
3118!211Zs!Qbsuz!Du-!Tuf!$2
B!!S!!D!!I!!J!!U!!F!!D!!U!!V!!S!!F!!!!!!Q!/!!D!/
DMBTT!B!DPNQ/!TIJOHMF!SPPG-!UZQ/!VOMFTT!PUIFSXJTF!OPUFE
DFSFNPOZ!CBMDPOZ
23
5
CBTJT
cbt2t/dpn
ª!!
CBORVFU!EFDL
:81/697/:251
Bsdijufduvsf-!Q/D/
Opsui!Fmfwbujpo 4027#!>!!!!2(.1#
2
MPH0UJNCFS!FOUSZ!CFZPOE
PYJEJ\[FE!NFUBM!SPPG!BU!FOUSZ
Fbtu!Fmfwbujpo 4027#!>!!!!2(.1#
3