Loading...
HomeMy WebLinkAboutVARIANCE Setback Height 3323 Eiger Trail 2016-07-12 th Lot 9, Block 3, Amended Windcliff Estates, 5 Subdivision, Variance Request Height and Setback Requirements Estes Park Community Development Department, Planning Division Room 230, Town Hall, 170MacGregor Avenue PO Box 1200,Estes Park, CO 80517 Phone: 970-577-3721 Fax: 970-586-0249 www.estes.org E STES V ALLEY B OARD OF A DJUSTMENT MEETING DATE:July12, 2016 REQUESTS:This request is for three(3)variancesfrom Estes Valley Development Code (EVDC) as follows: 1.Variance from EVDC Section 4.3, Table 4-2,which requires a front setback of 25 feet. The request is to reduce the front setback to 7 feet from the east property line due to the narrow lot configuration; to minimize grading impacts, driveway slope;andto reduce the amount of height variance. 2.Variance from EVDC Section 4.3, Table 4-2,which requires a rearsetback of 25 feet. The request is to reduce the rearsetback from the west property line to 14 feet due to the narrow lot configuration; to minimize grading impacts, driveway slope; and to reduce the amount of height variance. 3.Variance from EVDC Section 4.3, Table 4-2,which requires a maximum height of 30 feet. The request is to allow the building to reach a maximum height of approximately 39 feetand average height of 32.2feet due to an average lot slopeof54%, a 2.2-foot variance to the height requirement. LOCATION:3323 Eiger Trail RECORD OWNERS: Andrew and Stephanie Newberg APPLICANT: Nate Kinley CONSULTANT/ENGINEER: Primary Contact: Céline M. LeBeau, Van Horn Engineering and Surveying STAFF CONTACT:Carrie McCool, Estes Park Planning Consultant PROJECT DESCRIPTION AND BACKGROUND: The subject property, Lot 9 is located in the Westcliff Estates Subdivision which hasa mixture of lot sizes and configurations, steep topography and vegetation that create unique hardships during development.The typical lot in Windcliff is subsized for the zone district with average slopes of approximately 40 percent. Lot 9 has characteristics that are extremely challenging. The lot has average slopes of 54%, which generatessignificant design challenges with regard to meeting the minimum height standard of 30 feetand creates the need to construct the residence closer to the road for access purposes. The lot is long and narrow with a buildable area that is only 23’ wide with the required building setbacks; thereby, making it very difficult to conform to the front and rear setback requirements. The applicant is requesting three(3) variancesas a part of this project scope to construct a single-family residence of similar size and character to existing residences within the subdivision.Due to the unique topographyof the site, the optimal locationfor this residence is proposed as toutilize the southern portion of the lot in order to minimize the amount of variance,and the need for significant grading, site disturbance, and tree removal. SITE DATA MAP AND TABLE: The project site is accessed directly from Eiger Trail, approximately 4,000feet to the southeastof the intersection of Windcliff Road andHighway 66. All of the surrounding developed lots in the subdivision are single-family residences.The subject property is zoned E-1(Estate), a single-family residential zoning district.The figure below depicts thevicinity of the project and surrounding residential land uses. Figure 1. Aerial Vicinity Map of Subject Site Estes Valley Board of Adjustment, July 12, 2016 Page 2of 7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request SITE DATA TABLE: Parcel Number:34101-15-009Lot Area:0.37acres Existing Land Use:Proposed Land Uses: Vacant Residential Land1 single-family residence Development Standard:Proposed: Front Setback: 25 feet7 feet Rear Setback: 25 feet14 feet Height: 30 feet32.2 feet Services: Water: TownSewer: UTSD Fire Protection:Estes Valley Fire Protection District Hazards/Physical FeaturesMapped in the project vicinity? Wildfire HazardNo Geologic HazardSteep Slopes/Moderate(2) WetlandsNo Streams/RiversNo Ridgeline ProtectionNo Wildlife HabitatNo REVIEW CRITERIA: In accordance with Section 3.6 C. “Standards for Review” of the EVDC, all applications for variances shall demonstrate compliance with the applicable standards and criteria contained therein. The Board of Adjustment is the decision-making body for this application. Please refer to the “Statement of Intent” document receivedonMay25, 2016,and the applicant’s comment response letter dated July 2, 2016. 1.Special circumstances or conditions exist (e.g., exceptional topographic conditions, narrowness, shallowness or the shape of the property) that are not common to other areas or buildings similarly situated and practical difficulty may result from strict compliance with this Code’s standards, provided that the requested variance will not have the effect of nullifying or impairing the intent and purposes of either the specific standards, this Code or the Comprehensive Plan. Staff Finding:The subject lot hasphysical particularities thatrequirevariances from the Code standards.The combination of a narrow lot and slopes greater than 30%presentchallengeswhen planning the site layout. The applicant has made efforts to avoid trees and minimize extensive grading wherefeasibleto achieve reasonable use of the property for a single-family residence.Allother parts of the site would have required substantialgradingwith fill,and tree removal to accommodate a new residence.The steep slopes and narrow lot widthresults in a combined need for variances to both setback and height requirements. Estes Valley Board of Adjustment, July 12, 2016 Page 3of 7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request 2.In determining "practical difficulty," the BOA shall consider the following factors: a.Whether there can be any beneficial use of the property without the variance. Staff Finding: The buildable area on the lot is 23’ wide with the required building setbacks andthe average lot slopeis 54%. A variance would be needed to accommodate any residencedesign;however, this particular configuration minimizes the amount of variance necessary.Similar variances weregranted to other lots within this subdivision with similar characteristics. The house has been proposed forthe southern end of the property to minimize the variancesneeded to accommodate a residence. Other locations on this property would require greater setback variances and potentially affect neighborhood character through the need for grading and removal of trees. b.Whether the variance is substantial. Staff Finding:The variancerequest is not substantial given the physical constraints of this lot. Theaverage lot slope of 54% is a substantial challenge to development that necessitatesthe three proposed variances to setback and height requirements. c.Whether the essential character of the neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance. Staff Finding:The house design associated with this proposal seeks to match the character of the surrounding neighborhood. Without a variance, it would not be possible to construct a residence that conforms tothe surrounding neighborhood character.The preservation of trees on the lot will minimizevisual impact from development of this site. d.Whether the variance would adversely affect the delivery of public services such as water and sewer. Staff Finding:The requested variances would not adversely affect public service delivery.The Upper Thompson Sanitation District has no objection to the proposed variance requests. The applicant has depicted a rerouted sewer service line to connectto the sewer main southwest of the subject lot as shown on the July 2, 2016 site plan. The Estes Valley Fire Protection District had not comments or concerns regardingthe proposed plans. The Larimer County Engineering Department reviewed the proposed variance requests and provided three comments to be addressed as follows: Grading for Infrastructure Right-of-way Encroachment.The County Engineer raised concerns regarding the encroachment of grading and infrastructure in the Eiger Trail right-of-way and required that the design and grading would needto be revised as necessary so contours tie in within the property boundary. The applicant revised the retaining walls and grading around the house to stay out of Eiger Trail right-of-way. A shortretaining wall was added along the entry walkway to keep grading on the lot. The applicant states that the driveway enters off Eiger Trail, so grading will be required within the right-of-way and the turnaround grading will enter the right-of-way. While the Estes Valley Board of Adjustment, July 12, 2016 Page 4of 7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request applicant proposes grading for the aforementioned items to be kept to a minimum to obtain safe grades and slopes, the County’s comments regarding the requirement that grading for infrastructure shall not encroach into the road right-of-waymust be adhered to. Turnaround and Parking within the Eiger Trail right-of-way.The County Engineer requested confirmation that the orientation of the proposed garage is such that the vehicles will still be parked outside of the road right-of-way limits and there will be space on the property to maneuver the vehicles in order to exit onto Eiger Trail in a forward manner. The applicant stated that parking is planned to be inside the garage and one spot on the west side of the turnaround as there is not 20’ of space from the garage doors to the right-of-way line. The turnaround width is 20’ and a three point turn is possible to enter Eiger Trail in a forward direction. The applicant asserts that the current drive and parking design present the most feasible design for this lot regarding access andparking as they note that if the house location wasmoved west, a greater rear setback variance will be required and greater site disturbance will occur (more fill, taller retaining walls). Historic DrainagePatterns.County Engineering Staff assumes that any subsequent improvements on this site would not adversely impact the drainage patterns or create erosion problems in the area. If drainage patterns are going to be changed, a drainage plan will need to be submitted to the Engineering Department for review and approval. Any disturbance of the site shouldbe reestablished to be equal to or better than the preconstruction condition. All disturbed areas should be reseeded with a native dry land seed mix. The applicantstated that drainage currently flows west and southwest across the lot and confirmed that the flow pattern will be maintained and directed around the proposed house as shownby the drainage arrows on the site plan. Erosion control and re-vegetation notes, including a seed mix for the local area, have been added to the site plan. Staff finds that all comments from the County Engineering Department shall be adequately addressed prior to issuance of a building permit. Staff has provided a condition of approval for the Board’s consideration. e.Whether the Applicant purchased the property with knowledge of the requirement. Staff Finding: Staff was not provided information as to what knowledge the applicant had of these requirements at time of purchase.However, given that multiple homes have been built on surrounding properties, the ownermust have purchased the lot under the assumption that they would have reasonable use of the property per the zoning of E-1, allowing for a single-family residence. f.Whether the Applicant's predicament can be mitigated through some method other than a variance. Staff Finding: The applicant is proposing the solution with the least impact to the siteand with minimal permanent impact to the site by minimizing grading and Estes Valley Board of Adjustment, July 12, 2016 Page 5of 7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request disturbance of vegetation on a steep slope.Staff finds that the applicant’s proposal cannot be accommodated through any other method except a variance. 3.No variance shall be granted if the submitted conditions or circumstances affecting the Applicant's property are of so general or recurrent a nature as to make reasonably practicable the formulation of a general regulation for such conditions or situations. Staff Finding:Staff finds that the applicant’s request for a variance is due to the unique topographical challenges created by the steep slopes combined with the narrow width ofthe lot and small lot size of 0.37 acres.While other variances have been grantedon other lots in this subdivision, this lot provides an extreme and unique situation. As such, Staff finds that the circumstances are unique to the applicant’s proposal, and are not so general or recurrent of a nature as to make it reasonable for the regulation to be changed to accommodate similar circumstances. 4.No variance shall be granted reducing the size of lots contained in an existing or proposed subdivision if it will result in an increase in the number of lots beyond the number otherwise permitted for the total subdivision, pursuant to the applicable zone district regulations. Staff Finding:The variance requests will not result in a reduction in the size of lots contained in an existing or proposed subdivision. 5.If authorized, a variance shall represent the least deviation from the regulations that will afford relief. Staff Finding:Staff, the architect and project engineer evaluated the potential to minimize the amount of each variance and determined that the proposed site design was the leastdeviation from the regulations necessary to achieve reasonable use of the property as compared to other variances and residences throughout the subdivision. 6.Under nocircumstances shall the BOA grant a variance to allow a use not permitted, or a use expressly or by implication prohibited under the terms of this Code for the zone district containing the property for which the variance is sought. Staff Finding:The variances requested will not permit a use prohibited or not expressly permitted in the Estatezone district. 7.In granting such variances, the BOA may require such conditions as will, in its independent judgment, secure substantially the objectives of the standard so varied or modified. Staff Finding:Staff has provided recommended conditions of approval for the Board’s considerationrelating to the County Engineering Department comments to be addressed. The Board is welcome to set forth conditions of approval to address any concerns that arise during the public hearing. Estes Valley Board of Adjustment, July 12, 2016 Page 6of 7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request REFERRAL AND PUBLIC COMMENTS:Thisvariancerequestswererouted to reviewing agency staff, the Windcliff Homeowners Associationand adjacent property owners for consideration and comment.All agency staff comments and concerns related to the variance requeststhat needed to be addressed are included in thisstaff report. The public hearing for the variance requestswerepublicly noticed in accordance with the applicable public notification requirements of the Estes Valley Development Code. No formal written comments were received from the public or adjacent property owners. The Windcliff Architectural Control Committee has reviewed the variance as summarized in the May 25, 2016 Van Horn Engineering letter and have no objectionsto the variance requests. STAFF FINDINGS: Staff finds that the application for the proposed variance requestwould comply with the applicable review criteria set forth in Section 3.6.C “Standards for Review” of the Estes Valley Development Code and advance goals, policies, and objectives adopted in the Estes Valley Comprehensive Planif the conditions of approval noted below are addressed prior to building permit issuance. POTENTIAL MOTIONS: Below are theBoard of Adjustmentoptions related to the variance request: 1.I find that the applicationsubstantially meetsthe criteria above, and move to recommend APPROVALof the variance requestswith no conditions. 2.I find that the applicationsubstantially meetsthe criteria above, and move to recommend APPROVALof the variance requestswith the following conditions: a.Prior to building permit issuance, all comments from the County Engineering Department and Town Staff shallbe adequately addressed. 3.I find that the variance requests donot substantially meet the criteria above, and move to recommend DENIALof the variance request applications. ENCLOSURES: 1.Statement of Intent and Application 2.Revised Site Plan dated July 2, 2016 3.Applicant’s Response Letter Dated July 2, 2016 4.Larimer County Engineering Department Comment Email dated June 21, 2016 5.Windcliff Architectural Control CommitteeApproval Estes Valley Board of Adjustment, July 12, 2016 Page 7of 7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request th Lot 9, Block 3, Amended Windcliff Estates, 5 Subdivision, Variance Request Height and Setback Requirements Estes Park Community Development Department, Planning Division Room 230, Town Hall, 170MacGregor Avenue PO Box 1200,Estes Park, CO 80517 Phone: 970-577-3721 Fax: 970-586-0249 www.estes.org E STES V ALLEY B OARD OF A DJUSTMENT MEETING DATE:July12, 2016 REQUESTS:This request is for three(3)variancesfrom Estes Valley Development Code (EVDC) as follows: 1.Variance from EVDC Section 4.3, Table 4-2,which requires a front setback of 25 feet. The request is to reduce the front setback to 7 feet from the east property line due to the narrow lot configuration; tominimize grading impacts, driveway slope;andtoreduce the amount of height variance. 2.Variance from EVDC Section 4.3, Table 4-2,which requires a rearsetback of 25 feet. The request is to reduce the rearsetback from the west property line to14 feetdue to the narrow lot configuration; tominimize grading impacts, driveway slope; and to reduce the amount of height variance. 3.Variance from EVDC Section 4.3, Table 4-2,which requires a maximum height of 30 feet. The request is to allow the building to reach a maximum height of approximately 39 feetand average height of 32.2feet due to an average lot slopeof54%, a 2.2-foot variance to the height requirement. LOCATION:3323 Eiger Trail RECORD OWNERS: Andrew and Stephanie Newberg APPLICANT: Nate Kinley CONSULTANT/ENGINEER: Primary Contact: Céline M. LeBeau, Van Horn Engineering and Surveying STAFF CONTACT:Carrie McCool, Estes Park Planning Consultant PROJECT DESCRIPTION AND BACKGROUND: Thesubject property, Lot 9 is located in the Westcliff Estates Subdivision which hasa mixture of lot sizes and configurations, steep topography and vegetation that create unique hardships during development.The typical lot in Windcliff is subsized for the zone district with average slopes of approximately 40 percent. Lot 9 has characteristics that are extremely challenging. The lot has average slopes of 54%, which generatessignificant design challenges with regard to meeting the minimum height standard of 30 feetand creates the need to construct the residence closer to the road for access purposes. The lot is long and narrow with a buildable area that is only 23’ wide with the required building setbacks; thereby, making it very difficult to conform to the front and rear setback requirements. The applicant is requesting three(3) variancesas a part of this project scope to construct a single-family residence of similar size and character to existing residences within the subdivision.Due to the unique topographyof the site, the optimal locationfor this residence is proposed as toutilize the southern portion of the lot in order to minimize the amount of variance,and the need for significant grading, site disturbance, and tree removal. SITE DATA MAP AND TABLE: The project site is accessed directly from Eiger Trail, approximately 4,000feetto the southeastof the intersection of Windcliff Road andHighway 66. All of the surrounding developed lots in the subdivision are single-family residences.The subject property is zoned E-1(Estate), a single-family residential zoning district.Thefigure below depicts thevicinity of the project and surrounding residential land uses. Figure 1. Aerial Vicinity Map of Subject Site Estes Valley Board of Adjustment, July 12, 2016 Page 2of7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request SITE DATA TABLE: Parcel Number:34101-15-009Lot Area:0.37acres Existing Land Use:Proposed Land Uses: Vacant Residential Land1 single-family residence Development Standard:Proposed: Front Setback: 25 feet7 feet Rear Setback: 25 feet14 feet Height: 30 feet32.2 feet Services: Water: TownSewer: UTSD Fire Protection:Estes Valley Fire Protection District Hazards/Physical FeaturesMapped in the project vicinity? Wildfire HazardNo Geologic HazardSteep Slopes/Moderate(2) WetlandsNo Streams/RiversNo Ridgeline ProtectionNo Wildlife HabitatNo REVIEW CRITERIA:In accordance with Section 3.6 C. “Standards for Review” of the EVDC, all applications for variances shall demonstrate compliance with the applicable standards and criteria contained therein. The Board of Adjustment is the decision-making body for this application. Please refer to the “Statement of Intent” document receivedonMay25, 2016,and the applicant’s comment response letter dated July 2, 2016. 1.Special circumstances or conditions exist (e.g., exceptional topographic conditions, narrowness, shallowness or the shape of the property) that are not common to other areas or buildings similarly situated and practical difficulty may result from strict compliance with this Code’s standards, provided that the requested variance will not have the effect of nullifying or impairing the intent and purposes of either the specific standards, this Code or the Comprehensive Plan. Staff Finding: The subject lot hasphysical particularities thatrequirevariances from the Code standards.The combination of a narrow lot and slopes greater than 30%presentchallengeswhen planning the site layout. The applicant has made efforts to avoid trees and minimize extensive grading wherefeasibleto achieve reasonable use of the property for a single-family residence.Allother parts of the site would have required substantialgradingwith fill,and tree removal to accommodate a new residence.Thesteep slopes and narrow lot widthresults in a combined need for variances to both setback and height requirements. Estes Valley Board of Adjustment, July 12, 2016 Page 3of7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request 2.In determining "practical difficulty," the BOA shall consider the following factors: a.Whether there can be any beneficial use of the property without the variance. Staff Finding: The buildable area on the lot is 23’ wide with the required building setbacks andthe average lot slopeis 54%. A variance would be needed to accommodate any residencedesign;however, this particular configuration minimizes the amount of variance necessary.Similar variances weregranted to other lots within this subdivision with similar characteristics. The house has been proposed forthe southern end of the property to minimize the variancesneeded to accommodate a residence. Other locations on this property would require greater setback variances and potentially affect neighborhood character through the need for grading and removal of trees. b.Whether the variance is substantial. Staff Finding:The variancerequest is not substantial given the physical constraints of this lot. Theaverage lot slope of 54% is a substantial challenge to development that necessitatesthe three proposed variances to setback and height requirements. c.Whether the essential character of the neighborhood would be substantially altered or whether adjoining properties would suffer a substantial detriment as a result of the variance. Staff Finding:The house design associated with this proposal seeks to match the character of the surrounding neighborhood. Without a variance, it would not be possible to construct a residence that conforms tothe surrounding neighborhood character.The preservation of trees on the lot will minimizevisual impact from development of this site. d.Whether the variance would adversely affect the delivery of public services such as water and sewer. Staff Finding:The requested variances would not adversely affect public service delivery.The Upper Thompson Sanitation District has no objection to the proposed variance requests. The applicant has depicted a rerouted sewer service line to connectto the sewer main southwest of the subject lot as shown on the July 2, 2016 site plan. The Estes Valley Fire Protection District had not comments or concerns regardingthe proposed plans. The Larimer County Engineering Department reviewed the proposed variance requests and provided three comments to be addressed as follows: Grading for Infrastructure Right-of-way Encroachment.The County Engineer raised concerns regarding the encroachment of grading and infrastructure in the Eiger Trail right-of-way and required that the design and grading would needto be revised as necessary so contours tie in within the property boundary. The applicant revised the retaining walls and grading around the house to stay out of Eiger Trail right-of-way.A shortretaining wall was added along the entry walkway to keep grading on the lot. The applicant states that the driveway enters off Eiger Trail, so grading will be required within the right-of-way and the turnaround grading will enter the right-of-way. While the applicant proposes grading for the aforementioned items to be kept to a minimum to obtain Estes Valley Board of Adjustment, July 12, 2016 Page 4of7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request safe grades and slopes, the County’s comments regarding the requirement that grading for infrastructure shall not encroach into the road right-of-waymust be adhered to. Turnaround and Parking within the Eiger Trail right-of-way.The County Engineer requested confirmation that the orientation of the proposed garage is such that the vehicles will still be parked outside of the road right-of-way limits and there will be space on the property to maneuver the vehicles in order to exit onto Eiger Trail in a forward manner. The applicant stated that parking is planned to be inside the garage and one spot on the west side of the turnaround as there is not 20’ of space from the garage doors to the right-of-way line. The turnaround width is 20’ and a three point turn is possible to enter Eiger Trail in a forward direction. Theapplicant asserts that the current drive and parking design present the most feasible design for this lot regarding access andparking as they note that if the house location wasmoved west, a greater rear setback variance will be required and greater site disturbance will occur (more fill, taller retaining walls). Historic DrainagePatterns.County Engineering Staff assumes that any subsequent improvements on this site would not adversely impact the drainage patterns or create erosion problems in the area. If drainage patterns are going to be changed, a drainage plan will need to be submitted to the Engineering Department for review and approval. Any disturbance of the site shouldbe reestablished to be equal to or better than the preconstruction condition. All disturbed areas should be reseeded with a native dry land seed mix. The applicantstated that drainage currently flows west and southwest across the lot and confirmed that the flow pattern will be maintained and directed around the proposed house as shownby the drainage arrows on the site plan. Erosion control and re-vegetation notes, including a seed mix for the local area, have been added to the site plan. Staff finds that all comments from the County Engineering Department shall be adequately addressed prior to issuance of a building permit. Staff has provided a condition of approval for the Board’s consideration. e.Whether the Applicant purchased the property with knowledge of the requirement. Staff Finding: Staff was not provided information as to what knowledge the applicant had of these requirements at time of purchase. However, given that multiple homes have been built on surrounding properties, the ownermust have purchased the lot under the assumption that they would have reasonable use of the property per the zoning of E-1, allowing for a single-family residence. f.Whether the Applicant's predicament can be mitigated through some method other than a variance. Staff Finding: The applicant is proposing the solution with the least impact to the siteand with minimal permanent impact to the site by minimizing grading and disturbance of vegetation on a steep slope.Staff finds that the applicant’s proposal cannot be accommodated through any other method except a variance. Estes Valley Board of Adjustment, July 12, 2016 Page 5of7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request 3.No variance shall be granted if the submitted conditions or circumstances affecting the Applicant's property are of so general or recurrent a nature as to make reasonably practicable the formulation of a general regulation for such conditions or situations. Staff Finding:Staff finds that the applicant’s request for a variance is due to the unique topographical challenges created by the steep slopes combined with the narrow width ofthelot and small lot size of 0.37 acres. While other variances have been grantedon other lots in this subdivision, this lot provides an extreme and unique situation. As such, Staff finds that the circumstances are unique to the applicant’s proposal, and are not so general or recurrent of a nature as to make it reasonable for the regulation to be changed to accommodate similar circumstances. 4.No variance shall be granted reducing the size of lots contained in an existing or proposed subdivision if it will result in an increase in the number of lots beyond the number otherwise permitted for the total subdivision, pursuant to the applicable zone district regulations. Staff Finding: The variance requests will not result in a reduction in the size of lots contained in an existing or proposed subdivision. 5.If authorized, a variance shall represent the least deviation from the regulations that will afford relief. Staff Finding:Staff, the architect and project engineer evaluated the potential to minimize the amount of each variance and determined that the proposed site design was the leastdeviation from the regulations necessary to achieve reasonable use of the property as compared to other variances and residences throughout the subdivision. 6.Under nocircumstances shall the BOA grant a variance to allow a use not permitted, or a use expressly or by implication prohibited under the terms of this Code for the zone district containing the property for which the variance is sought. Staff Finding:The variances requested will not permit a use prohibited or not expressly permitted in the Estatezone district. 7.In granting such variances, the BOA may require such conditions as will, in its independent judgment, secure substantially the objectives of the standard so varied or modified. Staff Finding:Staff has provided recommended conditions of approval for the Board’s considerationrelating to the County Engineering Department comments to be addressed. The Board is welcome to set forth conditions of approval to address any concerns that arise during the public hearing. REFERRAL AND PUBLIC COMMENTS:Thisvariancerequestswererouted to reviewing agency staff, the Windcliff Homeowners Associationand adjacent property owners for consideration and comment.All agency staff comments and concerns Estes Valley Board of Adjustment, July 12, 2016 Page 6of7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request related to the variance requeststhat needed to be addressed are included in thisstaff report. The public hearing for the variance requestswerepublicly noticed in accordance with the applicable public notification requirements of the Estes Valley Development Code. No formal written comments were received from the public or adjacent property owners. The Windcliff Architectural Control Committee has reviewed the variance as summarized in the May 25, 2016 Van Horn Engineering letter and have no objectionsto the variance requests. STAFF FINDINGS: Staff finds that the application for the proposed variance requestwould comply with the applicable review criteria set forth in Section 3.6.C “Standards for Review” of the Estes Valley Development Code and advance goals, policies, and objectives adopted in the Estes Valley Comprehensive Planif the conditions of approval noted below are addressed prior to building permit issuance. POTENTIAL MOTIONS: Below are theBoard of Adjustmentoptions related to the variance request: 1.I find that the applicationsubstantially meetsthe criteria above, and move to recommend APPROVALof the variance requestswith no conditions. 2.I find that the applicationsubstantially meetsthe criteria above, and move to recommend APPROVALof the variance requestswith the following conditions: a.Prior to building permit issuance, all comments from the County Engineering Department and Town Staff shallbe adequately addressed. 3.I find that the variance requests donot substantially meet the criteria above, and move to recommend DENIALof the variance request applications. ENCLOSURES: 1.Statement of Intent and Application 2.Revised Site Plan dated July 2, 2016 3.Applicant’s Response Letter Dated July 2, 2016 4.Larimer County Engineering Department Comment Email dated June 21, 2016 5.Windcliff Architectural Control CommitteeApproval Estes Valley Board of Adjustment, July 12, 2016 Page 7of7 Lot 9, Block 3, Amended Windcliff Estates, 5th SubdivisionVariance Request From: Audem Gonzales \[agonzales@estes.org\] Sent: Tuesday, June 21, 2016 4:30 PM To: Carrie McCool Subject: Fwd: REFERRAL FOR COMMENT: EIGER TRAIL-3323 - NEWBERG RESIDENCE ----------Forwarded message ---------- From:Traci Shambo <shambotl@co.larimer.co.us> Date: Tue, Jun 21, 2016 at 4:28 PM Subject: Re: REFERRAL FOR COMMENT: EIGER TRAIL-3323 - NEWBERG RESIDENCE To: Karen Thompson <kthompson@estes.org>,Audem Gonzales <agonzales@estes.org> My Comments are asfollows: 1.Grading for theinfrastructure shall not encroach into the road ROW. The design andgrading should be revised as necessary so contours tie in within theproperty boundary. 2.It should be confirmed thatthe orientation of the proposed garage is such that the vehicles willstill be parked outside of the road right-of-waylimits and therewill be space on the property to maneuver the vehicles in order to exitonto Eiger Trail in a forward manner. 3.Staffassumes that any subsequent improvements on this site would not adverselyimpact the drainage patterns or create erosion problems in the area. Ifdrainage patterns are going to be changed, a drainage plan will need to be submitted to the Engineering Department for review and approval. Anydisturbance of the site should be reestablished to be equal to or betterthan the preconstruction condition. All disturbed areas should bereseeded with a native dry land seed mix. On Fri, Jun 10, 2016 at 4:07 PM, Karen Thompson <kthompson@estes.org>wrote: TOREVIEWING AGENCIES TheTown of Estes Park Community Development Department has accepted the belowreferenced development application(s) as complete for review, i.e. minimalsubmittal requirements have been met and the application is ready for reviewfor compliance with the Estes Valley Development Code. PROJECT NAME, TYPE, & LOCATION Name: Eiger Trail – 3323 – Newberg Residence Type: Variance th Legal: Lot 9, Block 3, Amended Plat of Windcliff Estates, 5Filing Address: 3323 Eiger Trail Project details can be found in the Statement of Intent &Application (SIA) COMMENTS DUE ON OR BEFORE June 24, 2015 EMAIL COMMENTS TO Property Owner: Andrew &Stephanie Newberg – no email address provided Applicant: Nathan Kinleynathan@kinleybuilt.com Consultant/Engineer(s): CelineLeBeaucelinevhe@airbits.com Planner: CarrieMcCoolplanning@estes.org Email addresses can be found in theemail distribution list above. APPLICATION DOCUMENTS Documents are postedatwww.estes.org/currentapplications and/or are attached. EXTENSIONSOF TIMEFRAMES FOR REVIEW COUNTY REFERRAL FOR COMMENT EIGER TRAIL-3323 - NEWBERG RESIDENCE (1).htm\[7/7/2016 3:40:18 PM\] Incertain circumstances, review agencies can request additional time to review anapplication and the public hearing(s) may be delayed. For questions about thisplease contact the planner. KarenThompson Executive Assistant Community Development Department Town of Estes Park Phone:970-577-3721 Fax:970-586-0249 kthompson@estes.org -- Traci Shambo, P.E. Larimer County EngineeringDepartment 200 West Oak St, Suite 3000 P.O. Box 1190 Fort Collins, CO 80522 Phone:(970)498-5701 tshambo@larimer.org -- Audem Gonzales Community Development Department Town of Estes Park Estes Park, CO 80517 Ph: (970) 577-3729 COUNTY REFERRAL FOR COMMENT EIGER TRAIL-3323 - NEWBERG RESIDENCE (1).htm\[7/7/2016 3:40:18 PM\] From: Audem Gonzales \[agonzales@estes.org\] Sent: Thursday, June 23, 2016 10:38 AM To: Carrie McCool Subject: Fwd: Variance Request Newberg - 3323 Eiger ----------Forwarded message ---------- From:Karen Thompson <kthompson@estes.org> Date: Thu, Jun 23, 2016 at 10:24 AM Subject: Fwd: Variance Request Newberg - 3323 Eiger To: Audem Gonzales <agonzales@estes.org> Karen Thompson Executive Assistant Community Development Department Town of Estes Park Phone:970-577-3721 Fax:970-586-0249 kthompson@estes.org ----------Forwarded message ---------- From:Charles Cofas <cofasc@msn.com> Date: Thu, Jun 23, 2016 at 10:17 AM Subject: Variance Request Newberg - 3323 Eiger To:kthompson@estes.org Cc: Jack Reed <pairojacks@q.com>,Joe & Maryliz Adair - Home <adairvideo@aol.com>,nathan@kinleybuilt.com, BUD MARY DURYEA <aspenspring1@msn.com> Ms. Thompson, Mr. Kinley The Windcliff Architectural Control Committee has reviewed thevariance request for Lot 9 Block 3 of the fifth subdivision of WindcliffSubdivision in Larimer County (3323 Eiger Trail)as summarized in the May25, 2016 Van Horn Engineering letter and have no objection to the variancerequest. Thank you for including us in the process. We assume thatany comments or objections from neighbors will result in a direct response toyou as a result of the post cards you sent to them. Respectfully, Charles Cofas Chairman, Windcliff Architectural Control Committee -- HOA Comments_Variance Request Newberg - 3323 Eiger.htm\[7/7/2016 3:39:52 PM\] ! ! MBOE!TVSWFZT! TVCEJWJTJPOT! EFWFMPQNFOU!!QMBOOJOH! JNQSPWFNFOU!QMBUT! TUSVDUVSBM!FOHJOFFSJOH! TBOJUBSZ!FOHJOFFSJOH! ! NVOJDJQBM!FOHJOFFSJOH! ! ! Kvmz!3-!3127! ! ! ! Nt/!Dbssjf!NdDppm! Upxo!pg!Ftuft!Qbsl! Dpnnvojuz!Efwfmpqnfou!Efqbsunfou! 281!NbdHsfhps!Bwfovf! Ftuft!Qbsl-!DP!91628! ! ! Sf;!!Ofxcfsh!Wbsjbodf!Bqqmjdbujpo!Dpnnfou!Sftqpotf! ! ! ! Efbs!Nt/!NdDppm-! ! Uijt!mfuufs!bddpnqbojft!uif!sfwjtfe!Wbsjbodf!Tjuf!Qmbo!)Tjuf!Qmbo*!gps!uif!Ofxcfsh!Wbsjbodf!Bqqmjdbujpo! tvcnjuufe!Kvof!:-!3127!boe!jt!jo!sftqpotf!up!zpvs!Sfwjfx!Dpnnfout!ebufe!Kvof!38-!3127!)xjui! bttpdjbufe!bggfdufe!bhfodz!dpnnfout*/!!!Uif!sftqpotft!up!uif!dpnnfout!bsf!mjtufe!cfmpx;! ! Dpnnvojuz!Efwfmpqnfou!Tubgg!Dpnnfout;! ! 2/!!Uijt!dpnnfou!sfrvftut!uibu!npefmjoh!cf!epof!up!efnpotusbuf!b!ipvtf!uibu!xpvme!cf!dpnqmjbou! xjui!uif!FWED!po!uijt!mpu!up!tipx!uibu!xpvme!opu!gju!xjui!uif!hfofsbm!dibsbdufs!pg!uif! ofjhicpsippe/!!WIF!ibt!dpnqmfufe!nboz!wbsjbodft!jo!uif!Xjoedmjgg!Tvcejwjtjpo!xjuipvu!npefmjoh! bo!FWED!dpnqmjbou!ipnf!po!uif!mpu/!!Uijt!jt!bo!beefe!fyqfotf!up!uif!dmjfou!uibu!op!puifs! qspqfsuz!pxofs!bqqmzjoh!gps!b!wbsjbodf!jo!uijt!ofjhicpsippe!ibt!ibe!up!jodvs!jo!uif!qbtu/!!Xf! sftqfdugvmmz!sfrvftu!uibu!uijt!sfrvjsfnfou!cf!xbjwfe/! 3/!Uijt!dpnnfou!beesfttft!uif!2“!ifjhiu!wbsjbodf!sfrvftufe!xjui!uijt!wbsjbodf!bqqmjdbujpo/!!Vqpo! gvsuifs!sfwjfx-!vtjoh!uif!fmfwbujpo!voefs!uif!qspqptfe!opsui!ipvtf!dpsofs!)9697/3“*!jo! dpnqbsjtpo!up!uif!fmfwbujpo!voefs!uif!tpvui!sppg!qfbl!)9683/4“*-!uif!tmpqf!bekvtunfou!jt!8/1“!)48“! bmmpxfe!ifjhiu!gspn!psjhjobm!hsbef*/!!Uif!qspqptfe!sppg!ifjhiu!bu!uijt!qpjou!jt!4:“-!3“!bcpwf! bmmpxfe!ifjhiu!bu!uijt!qpjou/!!B!3/3“!ifjhiu!wbsjbodf!jt!cfjoh!sfrvftufe!up!qspwjef!dpotusvdujpo! ’cvggfs“/!!Uif!tusvduvsf!dboopu!cf!mpxfsfe!evf!up!uif!esjwfxbz!dpnjoh!pgg!pg!Fjhfs!Usbjm!bcpwf! cfdpnjoh!upp!tuffq!po!foufsjoh!uif!hbsbhf/!!Efdsfbtjoh!uif!sppg!qjudi!xjmm!tjhojgjdboumz!bmufs!uif! eftjho!pg!uif!ipvtf!boe!hsfbu!sppn!jo!qbsujdvmbs/! 4/!Uijt!dpnnfou!sfgfst!up!Dsjufsjb!6!uibu!tubuft!uif!wbsjbodf!tibmm!sfqsftfou!uif!mfbtu!efwjbujpo!gspn! uif!sfhvmbujpot!uibu!xjmm!bggpse!sfmjfg/!!Uif!qmbdfnfou!boe!tibqf!pg!uif!ipvtf!epft!sfqsftfou!uif! mfbtu!efwjbujpo!gspn!uif!sfhvmbujpot!dpotjefsjoh!uif!bnpvou!pg!tjuf!ejtuvscbodf!boe!dpogpsnjoh!up! 2154!Gjti!Dsffl!Spbe!!¸!!Ftuft!Qbsl-!Dpmpsbep!91628!¸!!:81.697.:499!!¸!!F.nbjm;!wifAbjscjut/dpn!! ! uif!dibsbdufs!pg!uif!ofjhicpsippe/!!Uif!ipvtf!jt!mpoh!boe!obsspx-!tjnjmbs!up!uif!mpu!tibqf/!!Uif! ipvtf!qmbdfnfou!gpmmpxt!uif!dpoupvst!pg!uif!mpu-!efdsfbtjoh!qpufoujbm!hsbejoh!boe!tjuf! ejtuvscbodf/!!Jg!uif!ipvtf!xfsf!tijgufe!opsui!po!uif!mpu-!uif!dvu!po!uif!fbtu!tjef!xpvme!jodsfbtf!up! 9“!boe!gjmm!po!uif!xftu!tjef!pg!uif!ipvtf!jodsfbtft!up!23“/!!Nboz!npsf!usfft!cfuxffo!uif!fyjtujoh! ipvtf!up!uif!opsui!boe!uif!qspqptfe!ipvtf!xpvme!offe!up!cf!sfnpwfe-!sfevdjoh!uif!ovncfs!pg! usfft!po!uif!mpu!boe!tdsffojoh!cfuxffo!uif!ipvtft/!!Uif!gjojtife!gmpps!fmfwbujpo!jt!efqfoefou!po! uif!esjwfxbz!hsbef!dpnjoh!pgg!Fjhfs!Usbjm/!!! 5/!Uijt!dpnnfou!tvhhftut!b!sfeftjho!pg!uif!mjwjoh!sppn!psjfoubujpo!boe!sfbs!efdl!sf.dpogjhvsbujpo!up! sfevdf!uif!offe!gps!sfbs!tfucbdl!boe!ifjhiu!wbsjbodft/!!Uif!vtbcmf!qpsujpo!pg!uif!mjwjoh!sppn! )bqbsu!gspn!uif!tubjst*!jt!ofbsmz!trvbsf-!uifsfgpsf!spubujoh!uif!mjwjoh!sppn!:1!efhsfft!bt! tvhhftufe!xjmm!opu!tvctuboujbmmz!sfevdf!uif!xjeui!pg!uif!sfrvftufe!ifjhiu!wbsjbodf!)uijt!jt!opu!uif! hsfbuftu!efwjbujpo!gspn!bmmpxfe!ifjhiu-!uibu!jt!uif!tpvui!sppg!qfbl*/!!Beejujpobmmz-!tijgujoh!uif!sppg! qfbl!up!b!opsui.tpvui!psjfoubujpo!xpvme!dsfbuf!b!wbmmfz!cfuxffo!sjehft-!xijdi!jt!opu!dpoevdjwf!up! qspqfsmz!tifeejoh!tupsn!xbufs!esbjobhf/!!Uif!mjwjoh!sppn!psjfoubujpo!jt!eftjhofe!up!ibwf!uif! qjduvsf!xjoepxt!pg!uif!hsfbu!sppn!gbdf!uif!npvoubjo!sbohf!boe!up!ibwf!uif!sppg!sjehft!bu!:1! efhsfft!gps!sfbtpobcmf-!uzqjdbm!dpotusvdujpo/!!Uif!mbshf!qpsujpo!pg!uif!efdl!jt!eftjhofe!up! bddpnnpebuf!b!tjuujoh0fbujoh!bsfb!pvutjef!pg!uif!ljudifo!boe!ejojoh!sppn!xjui!uif!wjfx!pg!uif! npvoubjo!sbohf/!!Nboz!Xjoedmjgg!ipnft!ibwf!bdrvjsfe!efdl!wbsjbodft/!!Uif!efdl!wbsjbodf!jt!opu! uif!mjnjujoh!)tnbmmftu*!wbsjbodf!boe!xf!gffm!uibu!uif!qspqptfe!efdl!tj{f0qmbdfnfou!jt!dpnnpo!up! uif!ofjhicpsippe/! 6/!Uijt!dpnnfou!jt!dpodfsofe!xjui!uif!81&!wbsjbodf!sfrvftu!pg!uif!sfbs!tfucbdl!evf!up!opo.mjwbcmf! tqbdft!)efdlt*!boe!qmbdfnfou!pg!tvdi!tqbdft/!!Uif!sfbs!efdl!dpvme!cf!joufsqsfufe!bt!”rvbmjuz•! mjwbcmf!tqbdf!evf!up!uif!vtf!pg!uijt!bsfb!pg!uif!efdl/!!Uijt!bsfb!pg!uif!efdl!jt!bddfttfe!gspn!uif! ljudifo!boe!ejojoh!sppn-!uivt!xjmm!cf!vtfe!bt!bo!fyufoefe!ejojoh!boe!foufsubjojoh!bsfb/!!Uif! ljudifo!jt!mpdbufe!ofbs!uif!hbsbhf!gps!mphjtujdbm!sfbtpot!)j/f/-!hspdfsjft*/!!Efdlt!bsf!dpnnpomz! fmfwbufe!boe!efdl!wbsjbodft!bsf!dpnnpoqmbdf!jo!Xjoedmjgg!Ftubuft!evf!up!uif!tuffq0obsspx!mput/! 7/!Uijt!dpnnfou!tvhhftu!sfevdjoh!uif!gspou!tfucbdl!wbsjbodf!ejtubodf!cz!fmjnjobujoh!uif!dpwfsfe! fousz!uibu!jt!dpotjefsfe!opo.mjwbcmf!tqbdf/!!B!dpwfsfe!fousz!jt!uzqjdbm!pg!npvoubjo!ipnft!boe! Xjoedmjgg!Ftubuft!ipnft!evf!up!uif!fyusfnf!xfbuifs!pg!ijhi!bmujuvef!dmjnbuf/!!Uif!dpwfsfe!fousz! qspwjeft!tifmufs!gps!sftjefout!ps!hvftu!xbjujoh!bu!uif!fousz!pg!uif!ipvtf/!!Uijt!gfbuvsf!bmtp! qspwjeft!tifmufs!gps!qbdlbhft!ps!puifs!efmjwfsjft!xifo!uif!sftjefout!bsf!opu!ipnf/!!Bmuipvhi!uif! dpwfsfe!fousz!jt!opu!mjwbcmf!tqbdf-!ju!jt!b!tqbdf!uibu!jt!offefe!jo!uijt!dmjnbuf!boe!jt!bo! bsdijufduvsbm!gfbuvsf!uibu!jt!dibsbdufsjtujd!pg!uijt!ofjhicpsippe/! ! ! Sfwjfxjoh!Bhfodz!Dpnnfout;! ! Mbsjnfs!Dpvouz!Fohjoffsjoh!Efqbsunfou-!Usbdj!Tibncp! 2/!Uijt!dpnnfou!tubuft!uibu!hsbejoh!gps!uif!jogsbtusvduvsf!tibmm!opu!fodspbdi!joup!uif!spbe!S.P.X/!! Uif!sfubjojoh!xbmmt!boe!hsbejoh!bspvoe!uif!ipvtf!ibwf!cffo!sfwjtfe!up!tubz!pvu!pg!uif!Fjhfs!Usbjm! S.P.X/!!B!tipsu!sfubjojoh!xbmm!xbt!beefe!bmpoh!uif!fousz!xbmlxbz!up!lffq!hsbejoh!po!uif!mpu/!! Uif!esjwfxbz!foufst!pgg!Fjhfs!Usbjm-!uivt!hsbejoh!xjmm!cf!sfrvjsfe!xjuijo!uif!S.P.X!boe!uif! uvsobspvoe!hsbejoh!xjmm!foufs!uif!S.P.X/!Hsbejoh!gps!uif!bgpsfnfoujpofe!jufnt!xbt!lfqu!up!b! njojnvn!up!pcubjo!tbgf!hsbeft!boe!tmpqft/! 3/!Uijt!dpnnfou!beesfttft!uvsobspvoe!boe!qbsljoh!xjuijo!uif!Fjhfs!Usbjm!S.P.X/!!Qbsljoh!jt! qmboofe!up!cf!jotjef!uif!hbsbhf!boe!pof!tqpu!jo!uif!xftu!tjef!pg!uif!uvsobspvoe!bt!uifsf!jt!opu! 31“!pg!tqbdf!gspn!uif!hbsbhf!eppst!up!uif!S.P.X!mjof/!!Uif!uvsobspvoe!xjeui!jt!31“!boe!b!uisff! qpjou!uvso!jt!qpttjcmf!up!foufs!Fjhfs!Usbjm!jo!b!gpsxbse!ejsfdujpo/!!Jg!uif!ipvtf!mpdbujpo!jt!npwfe! xftu!b!hsfbufs!sfbs!tfucbdl!wbsjbodf!xjmm!cf!sfrvjsfe!boe!hsfbufs!tjuf!ejtuvscbodf!xjmm!pddvs!)npsf! gjmm-!ubmmfs!sfubjojoh!xbmmt*/!!Uif!dvssfou!esjwf!boe!qbsljoh!eftjho!qsftfou!uif!nptu!gfbtjcmf!eftjho! gps!uijt!mpu!sfhbsejoh!bddftt!boe!qbsljoh/!!! 4/!Uijt!dpnnfou!beesfttft!uif!nbjoufobodf!pg!ijtupsjd!esbjobhf!qbuufsot!boe!sf.wfhfubujpo!pg! ejtuvscfe!bsfbt/!!Esbjobhf!dvssfoumz!gmpxt!xftu!boe!tpvuixftu!bdsptt!uif!mpu/!!Uijt!gmpx!qbuufso! tibmm!cf!nbjoubjofe!boe!ejsfdufe!bspvoe!uif!qspqptfe!ipvtf!bt!tipxo!cz!uif!esbjobhf!bsspxt! po!uif!Tjuf!Qmbo/!!Fsptjpo!dpouspm!boe!sf.wfhfubujpo!opuft-!jodmvejoh!b!tffe!njy!gps!uif!mpdbm!bsfb-! ibwf!cffo!beefe!up!uif!Tjuf!Qmbo/!!Uif!Xjoedmjgg!IPB!bmtp!sfwjfxt!uiftf!qmbot!boe!uifjs! dpodfsot!xjmm!cf!beesfttfe/! ! 2154!Gjti!Dsffl!Spbe!!¸!!Ftuft!Qbsl-!Dpmpsbep!91628!¸!!:81.697.:499!!¸!!F.nbjm;!wifAbjscjut/dpn!! ! Vqqfs!Uipnqtpo!Tbojubujpo!Ejtusjdu;! Jo!bddpsebodf!xjui!VUTE!dpnnfou!ovncfs!5-!J!ibwf!sfspvufe!uif!tfxfs!tfswjdf!mjof!up!dpoofdu!up!uif! tfxfs!nbjo!tpvuixftu!pg!uif!tvckfdu!mpu!bt!tipxo!po!uif!sfwjtfe!Tjuf!Qmbo/!!! Qmfbtf!dpoubdu!nf!xjui!boz!rvftujpot!ps!dpodfsot!bu!:81.697.:499!fyufotjpo!39/! Uibol!zpv-! Dêmjof!N/!MfCfbv-!Qspkfdu!Nbobhfs! Gps!Wbo!Ipso!Fohjoffsjoh!'!Tvswfzjoh-!Jod/! 2154!Gjti!Dsffl!Spbe!!¸!!Ftuft!Qbsl-!Dpmpsbep!91628!¸!!:81.697.:499!!¸!!F.nbjm;!wifAbjscjut/dpn!! From: Audem Gonzales \[agonzales@estes.org\] Sent: Tuesday, June 21, 2016 4:30 PM To: Carrie McCool Subject: Fwd: REFERRAL FOR COMMENT: EIGER TRAIL-3323 - NEWBERG RESIDENCE ----------Forwarded message ---------- From:Traci Shambo <shambotl@co.larimer.co.us> Date: Tue, Jun 21, 2016 at 4:28 PM Subject: Re: REFERRAL FOR COMMENT: EIGER TRAIL-3323 - NEWBERG RESIDENCE To: Karen Thompson <kthompson@estes.org>,Audem Gonzales <agonzales@estes.org> My Comments are asfollows: 1.Grading for theinfrastructure shall not encroach into the road ROW. The design andgrading should be revised as necessary so contours tie in within theproperty boundary. 2.It should be confirmed thatthe orientation of the proposed garage is such that the vehicles willstill be parked outside of the road right-of-waylimits and therewill be space on the property to maneuver the vehicles in order to exitonto Eiger Trail in a forward manner. 3.Staffassumes that any subsequent improvements on this site would not adverselyimpact the drainage patterns or create erosion problems in the area. Ifdrainage patterns are going to be changed, a drainage plan will need to be submitted to the Engineering Department for review and approval. Anydisturbance of the site should be reestablished to be equal to or betterthan the preconstruction condition. All disturbed areas should bereseeded with a native dry land seed mix. On Fri, Jun 10, 2016 at 4:07 PM, Karen Thompson <kthompson@estes.org>wrote: TOREVIEWING AGENCIES TheTown of Estes Park Community Development Department has accepted the belowreferenced development application(s) as complete for review, i.e. minimalsubmittal requirements have been met and the application is ready for reviewfor compliance with the Estes Valley Development Code. PROJECT NAME, TYPE, & LOCATION Name: Eiger Trail – 3323 – Newberg Residence Type: Variance th Legal: Lot 9, Block 3, Amended Plat of Windcliff Estates, 5Filing Address: 3323 Eiger Trail Project details can be found in the Statement of Intent &Application (SIA) COMMENTS DUE ON OR BEFORE June 24, 2015 EMAIL COMMENTS TO Property Owner: Andrew &Stephanie Newberg – no email address provided Applicant: Nathan Kinleynathan@kinleybuilt.com Consultant/Engineer(s): CelineLeBeaucelinevhe@airbits.com Planner: CarrieMcCoolplanning@estes.org Email addresses can be found in theemail distribution list above. APPLICATION DOCUMENTS Documents are postedatwww.estes.org/currentapplications and/or are attached. EXTENSIONSOF TIMEFRAMES FOR REVIEW COUNTY REFERRAL FOR COMMENT EIGER TRAIL-3323 - NEWBERG RESIDENCE (1).htm\[7/7/2016 3:40:18 PM\] Incertain circumstances, review agencies can request additional time to review anapplication and the public hearing(s) may be delayed. For questions about thisplease contact the planner. KarenThompson Executive Assistant Community Development Department Town of Estes Park Phone:970-577-3721 Fax:970-586-0249 kthompson@estes.org -- Traci Shambo, P.E. Larimer County EngineeringDepartment 200 West Oak St, Suite 3000 P.O. Box 1190 Fort Collins, CO 80522 Phone:(970)498-5701 tshambo@larimer.org -- Audem Gonzales Community Development Department Town of Estes Park Estes Park, CO 80517 Ph: (970) 577-3729 COUNTY REFERRAL FOR COMMENT EIGER TRAIL-3323 - NEWBERG RESIDENCE (1).htm\[7/7/2016 3:40:18 PM\] From: Audem Gonzales \[agonzales@estes.org\] Sent: Thursday, June 23, 2016 10:38 AM To: Carrie McCool Subject: Fwd: Variance Request Newberg - 3323 Eiger ----------Forwarded message ---------- From:Karen Thompson <kthompson@estes.org> Date: Thu, Jun 23, 2016 at 10:24 AM Subject: Fwd: Variance Request Newberg - 3323 Eiger To: Audem Gonzales <agonzales@estes.org> Karen Thompson Executive Assistant Community Development Department Town of Estes Park Phone:970-577-3721 Fax:970-586-0249 kthompson@estes.org ----------Forwarded message ---------- From:Charles Cofas <cofasc@msn.com> Date: Thu, Jun 23, 2016 at 10:17 AM Subject: Variance Request Newberg - 3323 Eiger To:kthompson@estes.org Cc: Jack Reed <pairojacks@q.com>,Joe & Maryliz Adair - Home <adairvideo@aol.com>,nathan@kinleybuilt.com, BUD MARY DURYEA <aspenspring1@msn.com> Ms. Thompson, Mr. Kinley The Windcliff Architectural Control Committee has reviewed thevariance request for Lot 9 Block 3 of the fifth subdivision of WindcliffSubdivision in Larimer County (3323 Eiger Trail)as summarized in the May25, 2016 Van Horn Engineering letter and have no objection to the variancerequest. Thank you for including us in the process. We assume thatany comments or objections from neighbors will result in a direct response toyou as a result of the post cards you sent to them. Respectfully, Charles Cofas Chairman, Windcliff Architectural Control Committee -- HOA Comments_Variance Request Newberg - 3323 Eiger.htm\[7/7/2016 3:39:52 PM\] Audem Gonzales Community Development Department Town of Estes Park Estes Park, CO 80517 Ph: (970) 577-3729 HOA Comments_Variance Request Newberg - 3323 Eiger.htm\[7/7/2016 3:39:52 PM\] ! ! MBOE!TVSWFZT! TVCEJWJTJPOT! EFWFMPQNFOU!!QMBOOJOH! JNQSPWFNFOU!QMBUT! TUSVDUVSBM!FOHJOFFSJOH! TBOJUBSZ!FOHJOFFSJOH! ! NVOJDJQBM!FOHJOFFSJOH! ! ! Kvmz!3-!3127! ! ! ! Nt/!Dbssjf!NdDppm! Upxo!pg!Ftuft!Qbsl! Dpnnvojuz!Efwfmpqnfou!Efqbsunfou! 281!NbdHsfhps!Bwfovf! Ftuft!Qbsl-!DP!91628! ! ! Sf;!!Ofxcfsh!Wbsjbodf!Bqqmjdbujpo!Dpnnfou!Sftqpotf! ! ! ! Efbs!Nt/!NdDppm-! ! Uijt!mfuufs!bddpnqbojft!uif!sfwjtfe!Wbsjbodf!Tjuf!Qmbo!)Tjuf!Qmbo*!gps!uif!Ofxcfsh!Wbsjbodf!Bqqmjdbujpo! tvcnjuufe!Kvof!:-!3127!boe!jt!jo!sftqpotf!up!zpvs!Sfwjfx!Dpnnfout!ebufe!Kvof!38-!3127!)xjui! bttpdjbufe!bggfdufe!bhfodz!dpnnfout*/!!!Uif!sftqpotft!up!uif!dpnnfout!bsf!mjtufe!cfmpx;! ! Dpnnvojuz!Efwfmpqnfou!Tubgg!Dpnnfout;! ! 2/!!Uijt!dpnnfou!sfrvftut!uibu!npefmjoh!cf!epof!up!efnpotusbuf!b!ipvtf!uibu!xpvme!cf!dpnqmjbou! xjui!uif!FWED!po!uijt!mpu!up!tipx!uibu!xpvme!opu!gju!xjui!uif!hfofsbm!dibsbdufs!pg!uif! ofjhicpsippe/!!WIF!ibt!dpnqmfufe!nboz!wbsjbodft!jo!uif!Xjoedmjgg!Tvcejwjtjpo!xjuipvu!npefmjoh! bo!FWED!dpnqmjbou!ipnf!po!uif!mpu/!!Uijt!jt!bo!beefe!fyqfotf!up!uif!dmjfou!uibu!op!puifs! qspqfsuz!pxofs!bqqmzjoh!gps!b!wbsjbodf!jo!uijt!ofjhicpsippe!ibt!ibe!up!jodvs!jo!uif!qbtu/!!Xf! sftqfdugvmmz!sfrvftu!uibu!uijt!sfrvjsfnfou!cf!xbjwfe/! 3/!Uijt!dpnnfou!beesfttft!uif!2“!ifjhiu!wbsjbodf!sfrvftufe!xjui!uijt!wbsjbodf!bqqmjdbujpo/!!Vqpo! gvsuifs!sfwjfx-!vtjoh!uif!fmfwbujpo!voefs!uif!qspqptfe!opsui!ipvtf!dpsofs!)9697/3“*!jo! dpnqbsjtpo!up!uif!fmfwbujpo!voefs!uif!tpvui!sppg!qfbl!)9683/4“*-!uif!tmpqf!bekvtunfou!jt!8/1“!)48“! bmmpxfe!ifjhiu!gspn!psjhjobm!hsbef*/!!Uif!qspqptfe!sppg!ifjhiu!bu!uijt!qpjou!jt!4:“-!3“!bcpwf! bmmpxfe!ifjhiu!bu!uijt!qpjou/!!B!3/3“!ifjhiu!wbsjbodf!jt!cfjoh!sfrvftufe!up!qspwjef!dpotusvdujpo! ’cvggfs“/!!Uif!tusvduvsf!dboopu!cf!mpxfsfe!evf!up!uif!esjwfxbz!dpnjoh!pgg!pg!Fjhfs!Usbjm!bcpwf! cfdpnjoh!upp!tuffq!po!foufsjoh!uif!hbsbhf/!!Efdsfbtjoh!uif!sppg!qjudi!xjmm!tjhojgjdboumz!bmufs!uif! eftjho!pg!uif!ipvtf!boe!hsfbu!sppn!jo!qbsujdvmbs/! 4/!Uijt!dpnnfou!sfgfst!up!Dsjufsjb!6!uibu!tubuft!uif!wbsjbodf!tibmm!sfqsftfou!uif!mfbtu!efwjbujpo!gspn! uif!sfhvmbujpot!uibu!xjmm!bggpse!sfmjfg/!!Uif!qmbdfnfou!boe!tibqf!pg!uif!ipvtf!epft!sfqsftfou!uif! mfbtu!efwjbujpo!gspn!uif!sfhvmbujpot!dpotjefsjoh!uif!bnpvou!pg!tjuf!ejtuvscbodf!boe!dpogpsnjoh!up! 2154!Gjti!Dsffl!Spbe!!¸!!Ftuft!Qbsl-!Dpmpsbep!91628!¸!!:81.697.:499!!¸!!F.nbjm;!wifAbjscjut/dpn!! ! uif!dibsbdufs!pg!uif!ofjhicpsippe/!!Uif!ipvtf!jt!mpoh!boe!obsspx-!tjnjmbs!up!uif!mpu!tibqf/!!Uif! ipvtf!qmbdfnfou!gpmmpxt!uif!dpoupvst!pg!uif!mpu-!efdsfbtjoh!qpufoujbm!hsbejoh!boe!tjuf! ejtuvscbodf/!!Jg!uif!ipvtf!xfsf!tijgufe!opsui!po!uif!mpu-!uif!dvu!po!uif!fbtu!tjef!xpvme!jodsfbtf!up! 9“!boe!gjmm!po!uif!xftu!tjef!pg!uif!ipvtf!jodsfbtft!up!23“/!!Nboz!npsf!usfft!cfuxffo!uif!fyjtujoh! ipvtf!up!uif!opsui!boe!uif!qspqptfe!ipvtf!xpvme!offe!up!cf!sfnpwfe-!sfevdjoh!uif!ovncfs!pg! usfft!po!uif!mpu!boe!tdsffojoh!cfuxffo!uif!ipvtft/!!Uif!gjojtife!gmpps!fmfwbujpo!jt!efqfoefou!po! uif!esjwfxbz!hsbef!dpnjoh!pgg!Fjhfs!Usbjm/!!! 5/!Uijt!dpnnfou!tvhhftut!b!sfeftjho!pg!uif!mjwjoh!sppn!psjfoubujpo!boe!sfbs!efdl!sf.dpogjhvsbujpo!up! sfevdf!uif!offe!gps!sfbs!tfucbdl!boe!ifjhiu!wbsjbodft/!!Uif!vtbcmf!qpsujpo!pg!uif!mjwjoh!sppn! )bqbsu!gspn!uif!tubjst*!jt!ofbsmz!trvbsf-!uifsfgpsf!spubujoh!uif!mjwjoh!sppn!:1!efhsfft!bt! tvhhftufe!xjmm!opu!tvctuboujbmmz!sfevdf!uif!xjeui!pg!uif!sfrvftufe!ifjhiu!wbsjbodf!)uijt!jt!opu!uif! hsfbuftu!efwjbujpo!gspn!bmmpxfe!ifjhiu-!uibu!jt!uif!tpvui!sppg!qfbl*/!!Beejujpobmmz-!tijgujoh!uif!sppg! qfbl!up!b!opsui.tpvui!psjfoubujpo!xpvme!dsfbuf!b!wbmmfz!cfuxffo!sjehft-!xijdi!jt!opu!dpoevdjwf!up! qspqfsmz!tifeejoh!tupsn!xbufs!esbjobhf/!!Uif!mjwjoh!sppn!psjfoubujpo!jt!eftjhofe!up!ibwf!uif! qjduvsf!xjoepxt!pg!uif!hsfbu!sppn!gbdf!uif!npvoubjo!sbohf!boe!up!ibwf!uif!sppg!sjehft!bu!:1! efhsfft!gps!sfbtpobcmf-!uzqjdbm!dpotusvdujpo/!!Uif!mbshf!qpsujpo!pg!uif!efdl!jt!eftjhofe!up! bddpnnpebuf!b!tjuujoh0fbujoh!bsfb!pvutjef!pg!uif!ljudifo!boe!ejojoh!sppn!xjui!uif!wjfx!pg!uif! npvoubjo!sbohf/!!Nboz!Xjoedmjgg!ipnft!ibwf!bdrvjsfe!efdl!wbsjbodft/!!Uif!efdl!wbsjbodf!jt!opu! uif!mjnjujoh!)tnbmmftu*!wbsjbodf!boe!xf!gffm!uibu!uif!qspqptfe!efdl!tj{f0qmbdfnfou!jt!dpnnpo!up! uif!ofjhicpsippe/! 6/!Uijt!dpnnfou!jt!dpodfsofe!xjui!uif!81&!wbsjbodf!sfrvftu!pg!uif!sfbs!tfucbdl!evf!up!opo.mjwbcmf! tqbdft!)efdlt*!boe!qmbdfnfou!pg!tvdi!tqbdft/!!Uif!sfbs!efdl!dpvme!cf!joufsqsfufe!bt!”rvbmjuz•! mjwbcmf!tqbdf!evf!up!uif!vtf!pg!uijt!bsfb!pg!uif!efdl/!!Uijt!bsfb!pg!uif!efdl!jt!bddfttfe!gspn!uif! ljudifo!boe!ejojoh!sppn-!uivt!xjmm!cf!vtfe!bt!bo!fyufoefe!ejojoh!boe!foufsubjojoh!bsfb/!!Uif! ljudifo!jt!mpdbufe!ofbs!uif!hbsbhf!gps!mphjtujdbm!sfbtpot!)j/f/-!hspdfsjft*/!!Efdlt!bsf!dpnnpomz! fmfwbufe!boe!efdl!wbsjbodft!bsf!dpnnpoqmbdf!jo!Xjoedmjgg!Ftubuft!evf!up!uif!tuffq0obsspx!mput/! 7/!Uijt!dpnnfou!tvhhftu!sfevdjoh!uif!gspou!tfucbdl!wbsjbodf!ejtubodf!cz!fmjnjobujoh!uif!dpwfsfe! fousz!uibu!jt!dpotjefsfe!opo.mjwbcmf!tqbdf/!!B!dpwfsfe!fousz!jt!uzqjdbm!pg!npvoubjo!ipnft!boe! Xjoedmjgg!Ftubuft!ipnft!evf!up!uif!fyusfnf!xfbuifs!pg!ijhi!bmujuvef!dmjnbuf/!!Uif!dpwfsfe!fousz! qspwjeft!tifmufs!gps!sftjefout!ps!hvftu!xbjujoh!bu!uif!fousz!pg!uif!ipvtf/!!Uijt!gfbuvsf!bmtp! qspwjeft!tifmufs!gps!qbdlbhft!ps!puifs!efmjwfsjft!xifo!uif!sftjefout!bsf!opu!ipnf/!!Bmuipvhi!uif! dpwfsfe!fousz!jt!opu!mjwbcmf!tqbdf-!ju!jt!b!tqbdf!uibu!jt!offefe!jo!uijt!dmjnbuf!boe!jt!bo! bsdijufduvsbm!gfbuvsf!uibu!jt!dibsbdufsjtujd!pg!uijt!ofjhicpsippe/! ! ! Sfwjfxjoh!Bhfodz!Dpnnfout;! ! Mbsjnfs!Dpvouz!Fohjoffsjoh!Efqbsunfou-!Usbdj!Tibncp! 2/!Uijt!dpnnfou!tubuft!uibu!hsbejoh!gps!uif!jogsbtusvduvsf!tibmm!opu!fodspbdi!joup!uif!spbe!S.P.X/!! Uif!sfubjojoh!xbmmt!boe!hsbejoh!bspvoe!uif!ipvtf!ibwf!cffo!sfwjtfe!up!tubz!pvu!pg!uif!Fjhfs!Usbjm! S.P.X/!!B!tipsu!sfubjojoh!xbmm!xbt!beefe!bmpoh!uif!fousz!xbmlxbz!up!lffq!hsbejoh!po!uif!mpu/!! Uif!esjwfxbz!foufst!pgg!Fjhfs!Usbjm-!uivt!hsbejoh!xjmm!cf!sfrvjsfe!xjuijo!uif!S.P.X!boe!uif! uvsobspvoe!hsbejoh!xjmm!foufs!uif!S.P.X/!Hsbejoh!gps!uif!bgpsfnfoujpofe!jufnt!xbt!lfqu!up!b! njojnvn!up!pcubjo!tbgf!hsbeft!boe!tmpqft/! 3/!Uijt!dpnnfou!beesfttft!uvsobspvoe!boe!qbsljoh!xjuijo!uif!Fjhfs!Usbjm!S.P.X/!!Qbsljoh!jt! qmboofe!up!cf!jotjef!uif!hbsbhf!boe!pof!tqpu!jo!uif!xftu!tjef!pg!uif!uvsobspvoe!bt!uifsf!jt!opu! 31“!pg!tqbdf!gspn!uif!hbsbhf!eppst!up!uif!S.P.X!mjof/!!Uif!uvsobspvoe!xjeui!jt!31“!boe!b!uisff! qpjou!uvso!jt!qpttjcmf!up!foufs!Fjhfs!Usbjm!jo!b!gpsxbse!ejsfdujpo/!!Jg!uif!ipvtf!mpdbujpo!jt!npwfe! xftu!b!hsfbufs!sfbs!tfucbdl!wbsjbodf!xjmm!cf!sfrvjsfe!boe!hsfbufs!tjuf!ejtuvscbodf!xjmm!pddvs!)npsf! gjmm-!ubmmfs!sfubjojoh!xbmmt*/!!Uif!dvssfou!esjwf!boe!qbsljoh!eftjho!qsftfou!uif!nptu!gfbtjcmf!eftjho! gps!uijt!mpu!sfhbsejoh!bddftt!boe!qbsljoh/!!! 4/!Uijt!dpnnfou!beesfttft!uif!nbjoufobodf!pg!ijtupsjd!esbjobhf!qbuufsot!boe!sf.wfhfubujpo!pg! ejtuvscfe!bsfbt/!!Esbjobhf!dvssfoumz!gmpxt!xftu!boe!tpvuixftu!bdsptt!uif!mpu/!!Uijt!gmpx!qbuufso! tibmm!cf!nbjoubjofe!boe!ejsfdufe!bspvoe!uif!qspqptfe!ipvtf!bt!tipxo!cz!uif!esbjobhf!bsspxt! po!uif!Tjuf!Qmbo/!!Fsptjpo!dpouspm!boe!sf.wfhfubujpo!opuft-!jodmvejoh!b!tffe!njy!gps!uif!mpdbm!bsfb-! ibwf!cffo!beefe!up!uif!Tjuf!Qmbo/!!Uif!Xjoedmjgg!IPB!bmtp!sfwjfxt!uiftf!qmbot!boe!uifjs! dpodfsot!xjmm!cf!beesfttfe/! ! 2154!Gjti!Dsffl!Spbe!!¸!!Ftuft!Qbsl-!Dpmpsbep!91628!¸!!:81.697.:499!!¸!!F.nbjm;!wifAbjscjut/dpn!! ! Vqqfs!Uipnqtpo!Tbojubujpo!Ejtusjdu;! Jo!bddpsebodf!xjui!VUTE!dpnnfou!ovncfs!5-!J!ibwf!sfspvufe!uif!tfxfs!tfswjdf!mjof!up!dpoofdu!up!uif! tfxfs!nbjo!tpvuixftu!pg!uif!tvckfdu!mpu!bt!tipxo!po!uif!sfwjtfe!Tjuf!Qmbo/!!! Qmfbtf!dpoubdu!nf!xjui!boz!rvftujpot!ps!dpodfsot!bu!:81.697.:499!fyufotjpo!39/! Uibol!zpv-! Dêmjof!N/!MfCfbv-!Qspkfdu!Nbobhfs! Gps!Wbo!Ipso!Fohjoffsjoh!'!Tvswfzjoh-!Jod/! 2154!Gjti!Dsffl!Spbe!!¸!!Ftuft!Qbsl-!Dpmpsbep!91628!¸!!:81.697.:499!!¸!!F.nbjm;!wifAbjscjut/dpn!! CERTIFICATE OF COMPLETENESS Submittal Date: May 25, 2016 Certificate of Completeness Issued: June 6, 2016 Project Name: Newberg Variance 3323 Eiger Trail Project Application Type: Variance Owner/Applicant: Andrew and Stephanie Newberg Prepared By: Audem Gonzales, Planner I ______________________________________________________________________________ Staff has reviewed the Variance application and it has been determined it is substantially complete. Planning Staff is requesting an update of two items on the submitted plan set. Please be advised that this Certificate of Completeness is not a Code compliance review. Additional correspondence will follow concerning the full review, Estes Valley Development Code (EVDC) standards that may need to be addressed, and/or additional information that may be required during the formal review process. Next Steps th Re-submit updated plan set by Thursday June 9 before noon showing: 1. All building footprints on adjacent properties within 200 feet of the property line of the subject site. 2. Existing grade on architectural elevation sheets Once the updated plan set is resubmitted, Planning Staff will refer the application to the appropriate review agencies, review the application for compliance with the EVDC, prepare a staff report, schedule the public meetings and notice the project accordingly. Below are the anticipated public meeting dates. Board of Adjustment July 12, 2016 If you have any questions concerning comments on your project or the development review process, please feel free to contact, Audem Gonzales at 970-577-3729 or via email at agonzales@estes.org. Best Regards, Audem Gonzales Planner I