HomeMy WebLinkAboutPACKET Public Works 2007-10-11. AGENDA TOWN OF ESTES PARK PUBLIC WORKS COMMITTEE 8 a.m. Thursday, Elktober 11, 2007 preparation date: Elktober 3,2007 *revision date: Elktober 5,2007 PUBLIC COMMENT ACTION ITEMS: 1. Salt and Sand Storage Tent a. Request approval to accept lowest of three bids for construction of salt and sand storage tent at the Town laydown yard 2. Budgeted Tregent Park Sidewalk a. Request approval to accept low bid *3. Transportation Alternatives Study in Partnership with CDOT's Transportation Consultant a. Request authorization to fund study REPORTS: 1. Brodie Avenue Culvert Repair - verba/ report from Greg Sievers 2. BOR Flume Work in Big Thompson River - verbal report from Greg Sievers 3. Highway 34 Curbing at CVB - written report from Greg Sievers Note: The Public Works Committee reserves the right to consider other appropriate items not available at the time the agenda was prepared.
. r hp LaserJet 3015 01 HP LASERJET FAX invent Oct-8-2007 4:04PM Fax Call Report Job Date Time Type Identification Duration Pages Result 884 10/ 8/2007 4:00:48PM Send 5869561 0:35 1 OK 885 10/ 8/2007 4:01:28PM Send 5869532 0:33 1 OK 886 10/ 8/2007 4:02:07PM Send 5861691 0:37 1 OK 887 10/ 8/2007 4:02:50PM Send 6353677 0:33 1 OK 888 10/ 8/2007 4:03:28PM Send 5771590 0:42 1 OK
Igu TOWN of ESTES PARK ® ESTES PARK Public Works Department COLORADO INTER-OFFICE MEMORANDUM DATE: October 5,2007 TO: Public Works Committee FROM: Dave Mahany / Scott Zurn SUBJECT: Sand / Salt Storage Tent - Request to Purchase (Acct #101-3100-431-34-43 / #101-5200-452- 34-42 / # 101-5200-452-34-98) Background: For the past three years, the Street Department has been paying CDOT approximately $38,000 per year for a sand / 20% salt mix - CDOT spec. After research, staff has determined that the Town could save approximately $20,000 per year by purchasing its own storage facility and mixing salt and sand in-house. By recycling the reclaimed sand and mixing it with approximately 7% salt, the Street Department would produce a mix that would be better for the environment. The EPA requires covered storage of this type material. The storage tent would be installed at the Elm Road storage yard (the Town "laydown yard.") CosUBudqet: Cost: ACCU-STEEL BUILDINGS, Templeton, Iowa / (CO. State Bid) 42' x 75' Tan Polyethylene Building $ 21,989.69 Building Freight $ 2,552.00 Labor / Building Installation $ 11,300.00 Foundation Material - Vaughn Concrete (In-House Labor) $ 12,353.00 Foundation Freight $ 1,764.00 Bid Price: $ 49,958.69 ROCKY MOUNTAIN BUILDING / COVER-ALL, Pierce CO. Legend Style 42' x 72' White Dura-weave Building $ 24,711.04 Building Freight $ 1,275.00 Labor / Building Installation $ 14,601.60 Foundation Material / Installation $ 23,968.00 $ Bid Price: $ 64,555.64 Meridian Style 42' x 72' Dura-weave Building $ 26,832.90 Building Freight $ 1,275.00 Labor / Building Installation $ 14,076.00 Foundation Material / Installation $ 23,968.00 Bid Price: $ 66,151.90 Sand/Salt Storage Tent 1
DOME CORPORATION, Saginaw MI. EnviroTech 42' x 75' Tari Fabric Building / Installed Bid Price: $ 96,850.00 BULK STORAGE, Beecher, IL. Storemore design 42' x 72' Tan Fabric Building / Installed $ Bid Price: $ 158,760.00 Budget: $34,958.69 Acct # 101-3100-431-34-43 / p. 147 $10,000.00 Acct # 101-5200-452-34-42 / p. 165 $ 5,000.00 Acct # 101-5200-452-34-98 / p. 166 Cost: $49,958.69 Action: Staff recommends: 1. Purchasing the 42' x 75' Tan storage tent building and installation from Accu-Steel, Templeton IA for a cost of $35,841.69. 2. Purchasing the foundation material from Vaughn Concrete, Henderson CO. (they build the foundation material to Accu-Steel specs) for a cost of $14,117.00 w / freight. 3. Installing the foundation in-house. Total cost: $49,958.69 Sand/Salt Storage Tent 2
Igu TOWN of ESTES PARK ESTES PARK Public Works Department COLORADO INTER-OFFICE MEMORANDUM DATE: October 5,2007 TO: Public Works Committee FROM: Dave Mahany / Scott Zurn SUBJECT: Budgeted Tregent Park Sidewalk Background: Tregent Park has several heavily-traveled turf areas. The 2007 budget includes $7,500 budgeted to introduce sidewalk in these areas to provide a safer and more aesthetic area for recreation. Cost/Budget: Budget: $7,500.00 Acct # 211-5900-459.35-61 / p. 159 Action: Staff seeks authorization to award to the lowest of three bidders for the construction of sidewalks and related appurtenances for a not-to-exceed cost of $7,500.00. Parks Department will provide boulder work, restoration, irrigation modifications and turf in new areas. The resulting product will create a safer walking path, areas for three new picnic benches, and an area for a future sculpture. Tregent Park Sidewalk 1
Igu 121L1 TOWN of ESTES PARK ® ESTES PARK Public Works Department COLORADO INTER-OFFICE MEMORANDUM DATE: October 5,2007 TO: Public Works Committee FROM: Scott Zurn P.E. SUBJECT: Transportation Alternatives Study in Partnership with CDOT's Transportation Consultant Background: The Colorado Dept. of Transportation has stated that they may have maintenance funds available in 2008 for congestion improvements in Estes Park. Any improvements would have to be justified by a transportation study provided by CDOT's general consultant, PBS&J. If warranted, the study may provide guidance towards improvements in the downtown area that would relieve downtown traffic congestion. The resulting improvements would be jointly cost- shared and constructed in 2008. CDOT has stated that these funds are only periodically available and may be several years before they are available again. CosUBudget: Budget: $15,000.00 Acct # 101-2400-424.22-02 / p. 92 Action: Staff seeks authorization to retain CDOT's general consulting company, PBS&J, to study alternatives to relieve congestion in the downtown area. The focus of the study would be to seek alternatives that would result in CDOT funding of improvements in 2008. Traffic alternatives would be brought back to the committee for consideration prior to developing design and construction plans. It is anticipated that alternatives would involve joint participation from the Town and CDOT. Consideration for the alternatives would include available budgets from both entities and PBS&J scope of work will include estimating and developing fiscally constrained project scope. The requested authorization is for a not-to- exceed cost of $15,000.00 Transportation Alternatives 1
,. OCTOBER 2007 PUBLIC WORKS COMMITTEE NOTE: The following reports are not included in this packet: 1. Brodie Avenue Culvert Repair: verbal report from Greg Sievers 2. BOR Flume Work in Big Thompson River: verbal report from Greg Sievers
.. 'gu Public Works Engineering ESTES PARK COLORADO Memo TO: PWC & Scott Zurn From: Greg Sievers Date: July 31, 2007 Re: Highway 34 curb @ CVB Project Closure Report • 2007 Budget includes $50,000 for CVB site work. Page 185 • PWC approved this project work on August 9,2007 for $18,000 • Bids received from 2 local contractors. • Bob Pavlish, Cornerstone Concrete was low bid was $17,137.50 • Final payment in full was for $17,137.50 • Incidental costs include: $ 400 to survey & profile edge of roadway. (CES) $ 800 asphalt patch. (EZ excavating) $ 350 relocate UG electric streetlight circuit (Estes Valley) • Light & Power assisted with streetlight circuit replacement at no charge. • Final inspection and approval was made on October 1, 2007 • Page 1