HomeMy WebLinkAboutPACKET Public Works 2007-01-11. 0 h t AGENDA TOWN OF ESTES PARK PUBLIC WORKS COMMITTEE 8 a.m. Thursday, January 11, 2007 Preparation date: January 5, 2007 ACTION ITEMS: PUBLIC COMMENT 1. Parking Lot Naming Project • Request to adopt proposed parking lot names and purchase new signs REPORTS A. Snow Report B. Town Hall Staircase C. Hydro Restroom D. Security and Access - Town Hall Note: The Public Works Committee reserves the right to consider other appropriate items not available at the time the agenda was prepared.
4 19 4 Laserjet 3015 HP LASERJET FAX invent Jan-8-2007 3:36PM Fax Call Report Job Date Time Type Identification Duration Pages Result 838 1/ 8/2007 3:31:58PM Send 5869561 0:33 1 OK 839 1/ 8/2007 3:32:36PM Send 5869532 0:48 1 OK 840 1/ 8/2007 3:33:29PM Send 5861691 0:52 1 OK 841 1/ 8/2007 3:34:27PM Send 6353677 0:48 1 OK 842 1/ 8/2007 3:35:20PM Send 5771590 0:58 1 OK
Estes Park Police Department Memo To: Public Works Chairman Chuck Levine and Public Works Committee Board Members From: Lowell Richardson, Chief of Police CC: Randy Repola, Town Administrator Date: January 9,2007 Re: Renaming Parking Lots Background In 2005 the Town of Estes Park contracted the services of Republic Parking to conduct a comprehensive parking study. Throughout 2006 staff has implemented the recommendations from that study. One of the recommendations included renaming the parking lots, which has not been completed. The current problem is many of our parking lot names remain in place even though those businesses they were named after no longer exist (i.e. A&W lot etc. ..). Staff researched various naming systems to ensure lot names would remain in tact regardless of other changes occurring within the lot location (i.e. business name changes etc...). The naming system should incorporate what is effective for both visitor and resident alike. The staff recommendation is to name the lots after the adjacent streets. Attached are proposed names and sign designs for the seventeen parking lots located within the Town of Estes Park. Budget/Costs Double sided signs @ $30 each 34 parking lot signs = $1,020.00 This is not a budgeted item, but funding will come from a portion of the Street Name Sign Project, which has a $10,000.00 budget. (Page 140, 101-3100-431.25-25) Recommendations Staff recommends: • Adopting the proposed parking lot names. • Purchasing the signs from Lyle Sign Company • Street Department will install the signs by May 1St 2007. 1-1
(1) 1 0 C CD > 0 -1 01 -C\IC•)*LOCONOOC) PARKING LOT NAME (OLD) PROPOSED NEW NAME LOCATION eAUG ep!SieA!8 1se3 OLL 101 ua 30ISHEIAIH 19¥3 JO-I ueeno Allea 'E# 101 0 L enueA¥ U]04>113 M L LE 101 >]13¥d 30NVIAIUO=IH3d 101 pieA JeqU.Inl PIO £ L L 86ed plain>i seM SieAe!S 6eJE) Aq peiedeid Moraine Restrooms lot MORAINE AVE. LOT 185 Moraine Avenue Big Horn Lot BIG HORN LOT 101 Cleave Street Brownfields Lot PEDESTRIAN X-WALK LOT 352 E. Elkhorn Avenue Visitor Center - Main Lot VISITORS CENTER LOT 500 Big Thomp. Ave. Tallent Lot VISITORS CENTER SOUTH LOT 691 North St. Vrain Coffee Bar Lot VIRGINIA Drive LOT 147 Virginia Drive Dark Horse Lot @ Riverpark Plaza RIVERSIDE Drive LOT 141 Rockwell Street Ice House Lot SPRUCE Drive LOT 261 Cleave Street eAv JOBeJSOBIN OZ L 101 11¥H NMOi Bulpling ied!0!unIN L L UJ04>ll3 1$83 SEE 101 Alelq!1 EL ep!SieA!El JseM OOE 3Ol=I=IO 1SOd 101 30!#O 1sod 17 L el-IlleA¥ UJ04)113 M L62 101 >lEi Vd 1N3931:Il 101 jU8581L 9 L 13849 ls!eM 09 L 101 1SI3M (JeALI 341 JO l.Ilrios) 101 ls!eM Z L Parking LotnNa mNgprltt 2007 Del's A&W Lot DAVIS STREET LOT 283 Moraine ep!SieA!El M 092 101 'Ba 301SUBA113 -M ;07 eAUCI ep!SieA!El JseM 9 L
I .1 Ni e S 4.1 - i 1 1 i.4017. 08 4 ! 1 * 6 ir, 4, 4:rl lhL / .//=1"LZW" 1 . L. I. ' (f (746 vJ- i,te R 80 tl' 1 12 + I : 4 ..M -,1 .- j luv '' 2 LLM '.' I tnt- 1 96 j - k ng Cooper Blk t td B Cue Jo10!A )ped els@/feJeu@'6 :00ueispl :6*i01101
Al TOWN of ESTES PARK |11!1 Utilities and Public Works Departments INTER-OFFICE MEMORANDUM DATE: January 5,2007 TO: Public Works Committee FROM: Dave Mahany and Bob Goehring SUBJECT: Snow Report This is a cost estimate for Snow Removal and cleanup f rom 12/18/06 to 1/04/07. This estimate includes only truck time and labor; it does not include: maintenance, chains, plow blade, contracted trucks for clean-up, miscellaneous. Total Days Plowing 16 Total number of drivers. 22 Number of pieces of equipment 17 Total Hr (Reg) 970.5 Total Hr (O.T.) 348 Total Miles 5777.8 Total Labor $40566.00 Total Equip $21048.44 Total Cost $ 61615.00 COST/MILE $10.66
.. JANUARY 2007 PUBLIC WORKS COMMITTEE NOTE: The following reports will be verbal: B. Town Hall Staircase C. Hydro Restroom D. Security and Access - Town Hall I ,