Loading...
HomeMy WebLinkAboutPACKET Public Works 1992-08-271 ? :t PUBLIC WORKS COMMITTEE AGENDA August 27, 1992 1. Community Dr. - Request From Developer to relocate a portion of the road and vacate R.O.W. 2. Fall River Ln. - Potential Developer request to have the Town construct and pave the roadway. 3. Marys Lake WTP - Request approval to sign a change order. 4. 1992 Overlay Project - Request approval to sign a change order. 5. 1992 Loop Project - Request to bid. 6. Fall River W.M. Project - Request to bid. REPORTS: 1. Customer Service Response 2. Monthly Water Reports 3. Water Consultant Update 4. Park and Ride The Public Works Committee reserves the right to add or delete items from the agenda as necessary. , 1/ August 13, 1992 lf) Ch LO g E Z Mr. Bill Linane C,HF Town of Estes Park i -32 (D J C 00 P.O. Box 1200 0 ro LO a Estes Park, CO 80517 g - RE: Mountain Golf Villas Community Drive Dear Mr. Linane: We believe the above mentioned project allows for the construction of Community Drive in an alignment and location far superior to the existing. However, it also requires the dedication of about 1.2 acres of new right- of-way which adversely affects density allowed on the site. In lieu of the foregoing and our previous discussions, we request that the existing Community Drive right-of-way along the south side of this site and 1/2 of the right-of-way along the east side be vacated by the Town and title invested in the current ownership. Our client will incur all attendant legal fees and platting costs. Of course, easements required for access and utilities will be reserved and platted with the new right-of-way, lots, etc. in conjunction with the on-going development process. We will coordinate this effort to vacate right-of-way and plat new right-of-way, easement, etc. so that they happen concurrently. Respectfully yours, ESTES PARK SURVEYORS & ENGINEERS, INC. Pad 4- A«/& -L-- #aul M. Kochevar, P.E. & P.L.S. 15760 President cc: Jim Poenisch Om 1-1 ESTES PARK SURVEYORS & ENGINEERS, Inc. First Nat'I B O. Box 3047 es Park, Colorado 80517 - U.1 ,- nvL.-7 /\,VU , 41...1 6,64/OAD 40 0. 16 IDENT .. SWIM. POOL -- lu, I4 2. '3 .1 1 - BONNIE ORA E 0 12 0-0 1 2 ,4 \ .3 . ,--9*CUY r 1 VOUNTAItt\ c Tc-.1,3 60*.i,™,11 &7 /1 \FA In WA Y P V 'U.D. af / 2 L 8 0 - r. 2 \ e-LA-A'lk-1 / I 1-1 1 - l . C O 4.1 .,CU 4 1 7..C -Di2 P,LE,POS €IP . VAL.-Al-tgJ A. a J. /4 Jr, 6, O 7 U 1 - 4. . 1- 402 93 // 5 C. DJ 1- 5-CL GOLF rIBBITTy ADD. k Ok 0 k 1 0 - 1-2 *13HLLy• 2/,I-:2:6:1 K'14· I i. -Aoion/pi,n~„i„w. CO RECORD OF PROCEEDINGS Planning Commission August 18, 1992 Commission: Chairman Sager, Commissioners Wendell Amos, Mark Brown, Harriet Burgess, Alma Hix, Larry Wexler and Richard Wood Attending: All Also Attending: Town Administrator Klaphake, Community Development Director Stamey, Public Works Director Linnane, Clerk O'Connor Absent: Trustee/Liaison George Hix Chairman Sager called the meeting to order at 9:04 A.M. 1. MINUTES. It was moved and seconded (Brown/A. Hix) the minutes of the July 21, 1992 meeting be approved with the following amendments, and it passed unanimously: (1) Special Review /92-2 Elkhorn Lodge--the agenda sequence was changed as there were no persons present representing the Elkhorn Lodge application. When this item was reintroduced, representatives remained absent, thus the application was continued to August 18, 1992. (2) North End Property Owners Rezoning Request-- Commissioner Brown corrected the following statement: "...owners pay their fair share for increased cost...". To accommodate those with an interest in Special Review #92-5, Chairman Sager announced the Agenda sequence would be modified. 2. SPECIAL REVIEWS. 2.A. Special Review #92-5, Mountain Golf Villas. Lot 30. Bonnie Brae Addition, Pier Front Resort. Inc./Applicant. Chairman Sager opened a public hearing to consider said special review for the development of 30 dwelling units located southwest of Community Drive at Brodie Avenue. Paul Kochevar, Applicant's representative, reported that the site consisting of 7 acres, is zoned R-M Multiple Family, and -currently contains two cabins. The proposal contains the vacation of that portion of Community Drive which parallels the southern and eastern boundaries of the site; dedication of new street right-of-way for Community Drive along the western and northern boundaries of the site; extension of Matthew Circle to the west with a public street connection; and development of a bike path iii the old Community Drive right- of-way. Drawlngs identifying proposed changes to the roadway system, development plans (building configuration) and elevations were displayed. The Applicant has initiated the road vacation process; tlie units will encroach into the setback; however, they will not encroach into the Community Drive right-of-way; ten units will be constructed the first year, with complete build-out by 1995. Mr. Kochevar clarified two requests for density bonus for solar gain and wildlife habitat: while preserving views, the majority of units will be designed facing south to increase the potential for solar gain, and an existing sheltered area (northwest corner of the site) is currently being used as an animal habitat/wildlife migration path--the Applicant is proposing no construction on this portion of the site. Recognizing the platilking Commission cannot control architecture, Chairman Sager commended the Developer on the 1-3 1 1. «••An•€~•1)PW~ IS••ING• . RECORD OF PROCEEDINGS Planning Commission - August 18, 1992 - Page 2 design, variety of exterior materials, and rooflines. Chairman Sager also noted that the size of the garage (20x20) may not be adequate. Following questions raised by the Commission, Mr. Kochevar responded as follows: "moderately-priced homes"--they will be "affordable" $100-120,000; the Applicant does not intend to dedicate additional land or funding for other affordable housing; the bike path will be dedicated, however, linkage will not occur; as there are no current standards, creation of 30 individual lots will not be accomplished at thls time, ownership will be similar to that of a condominium project; density concerns--existing regulations under the R-M Zone would allow 56 units and the developer is proposing 30; state requirements will be followed relative to handicapped accessibility; a setback variance has been requested to improve the "liveability" of the units whereby garages will be relocated. Attached units are undesirable due to marketability; landscaping--whenever possible, existing trees/shrubs will be utilized on the site. There were no persons speaking in favor of the application. Testimony from affected property owners speaking in opposition were offered from: Mountain Fairways resident, Heidi Ilusel, Charles Kerr, Ginny and Erin Baker, Jerry Lefebvre, Patricia --kice, Pete Princehorn, and Sue O'Connor. Testimony related to: preservation of one cabin, density, views, wildlife habitat, quality of construction materials, against any code changes to accommodate the developer, road - 3. alignment/additional headlights-noise-public safety; drainage ' concerns pertaining to potential drainage holding ponds, i existing natural springs in the area, utilities, and property L_le-valuation. Lynn Swain/Museum Director reported that the developer has not formally approached the Museum or Museum Advisory Board concerning acceptance or rejection of the log cabin in question. There being no further comments, Chairman Sager declared the public hearing closed. Community Development Director Stamey reviewed the following items contained in the staff report: parking, surfacing, access (3 private driveways each serve 6 dwelling units), fire, utilities, drainage, landscaping, handicapped accessibility, development plan, subdivision, and site design criteria, and density calculations. Additional 7-questions/concerns were discussed: the Public Works Department did not request relocation of Community Drive to -r the north but did request removal of potentially dangerous curves and inclusion of the bike path; possibility of -construction of cul-de-sacs relative to Community Drive; and the detention pond will be 12" deep and will only contain water during rainstorms. Mr. Kochevar presented a map identifying adjacent property owners, and the proximity of their property to Community Drive and Matthew Circle. ~ Commissioner Brown stated that in the interest of the community, relocating Community Drive overrides the small impact [or tlio acijacont 1,101,tz'Ly owners, l.huu J t wau movod and seconded (Brown/Wood) Special Review #92-5, Mountain Golf D- Villas be favorably recommended to the Board of Trustees contingent upon the following, and it passed by the following votes: Those voting "Yes" Commissioners Brown, Burgess, A. Hix, Sager and Wood. Those voting "No" Commissioners Amos and _Wexler: 1. Submission ancl approval of a Subdivision plat which will accomplish roadway revisions. 1-4 I~.O,0...U-.„H,NUCO. RECORD OF PROCEEDINGS Planning Commission - August 18, 1992 - Page 3 2. The Planning Commission finds that the reserved open space (northwest corner of the site) is of importance due to the value for animal habitat, wildlife migration or scenic resource protection. 3. The Planning Commission finds that the site and building design provide an opportunity for solar gain. 4. Sanitary sewer lines be constructed and fees paid pursuant to Upper Thompson Sanitation District regulations. 5. Four (4) units be designated for handicapped accessibility. 6. The following be added to the Development Plan: a. 15' and 30' landscape buffer notes. b. Private driveway label. c. Size of landscape materihl. d. Building dimensions, and dimensions to locate buildings. e. Street right-of-way to Sheet #1. f. Development schedule. g. Building height. h. "Reserved" open space. This will also need to be protected by covenant. 7. Comments of Public Works Director, including: a. Provide 15' wide pedestrian/bike access easement in the vacated Community Drive right-of-way, located on private property. b. Developer to remove old asphalt and retain 10' wide path. c. Provide access easement to the golf course from Matthew Circle. d. New Community Drive right-of-way have a 25' setback from structures on Lot 20. e. Developer contact owner of Lot 20 to -- 2- address swimming pool discharge. f. Storm drainage detention will be required. 8. Buildings along New Community Drive conform to the setback requirement of 25'. ~ 9. The developer will construct the bikeway to adjoin the existing sidewalk to the south in accordance with the Estes Valley Recreation and Park District proposal. 10. Staff be authorized to use thelr discretion on potential screening located at the northwest corner of the site relative to increased traffic and visual lighting. 2 B. Special Review #92-2, Elkhorn Lodge, Trout Pond. Associated Property Consultants/Applicant. As there were no persons present nor additional information provided, it was moved and seconded (Burgess/Brown) Special Review #92-2, Elkhorn Lodge be tabled until such time as further information is submitted, and it passed unanimously. 1-5 d , .,, 141~„.~.414 t~/9 2.31 FE·«24*J .#= , [31•U I ·g~vi*ni,1, 3, --7-,-- / 11 1//ill'"/11 -5 + / r - 2 =- --- -.pl' 493-*i LAND SURVEYS - L ;.- 9- SUBDIVISIONS - . 1.... 1 -1 DEVELOPMENT PLANNING IMPROVEMENT PLATS STRUCTURAL ENGINEERING VAN HORN ENGINEERING AND SURVEYING SANITARYENGINEERING \, WILLIAM G. VAN HORN - COLO. PE & PLS 9485 MUNICIPALENGINEERING .\ ' Aug 7, 1992 Mr. Bll Linnane Public Works Director Town Of Estes Park P.O. Box 1200 Estes Park CO 80517 Dear Bill, On the behalf of Dan Nelson I would like to request being put on the agenda of the August 27th Public Works Committee Meeting to discuss Town policy regarding street improvements in the Fall River Addition. ~*ank you. Sincerely,A 11#UL Bill Van Horn cc Dan Nelson 2-1 1043 Fish Creek Road • P.O. Box 456 • Estes Park, Colorado 80517 • 303-586-9388 .. 83**Auftlmm:=J A N -.. SE = . - 25.i/''t,/r; tt 31,4463*sae!&&=' a: a - --U 1-\2 0= a= 13 I - I i ~~ *~~0 ~l J 1~:fi~ i- · ~~~~~~~~-~.,~~~~ -:7--2- -&915¤01,41,i-15.-~L- ,. 1, 1..,.1/1 ie -31 11- 342*.Trit iRF*~i~?9 r * y'fl - ,c-r-1 y .., 1 - F #f*+:;t\?\: jii.i.\VAQI,:iti V i,-'', lilt i flilli liE /,4 0 61.,4 4 j:f 7 : ..19 -71. 4, V'' . IT= F 1- pl:.; 631,~~litll 1 - 4 - 9 1-1.1 1.1 2 \ I•11,12 , 21-1 jitil·t:pit)&4,4145,# r,i: ;1111#9 ¥ : 1 .2: 6.Un I n - M , -11. 1 , 2 . 6 -.-- . I . 1 - 011,44 {(414 ¢~ap :. 1 2{p>~~:'1-t~*rAT---i'-' , < \Hi· 2 1-2 16+ -/ ·17- l .\"4:1. 4- t. 11/ . -- ----lilli-- . 'r ' fi r\- . . ., 13 , ...- 1 *J k 1 M'-33- „ -d /L -1 1 : 119 W I:-5 /7 O di 4 U [-4.1- + ¥ . /1/ U - - -- f 57 L... 6 / 11• 0, 0 1 A 9 1 7- /I. 41 9 1 .1 1 - 4241- i-, = 2~3 r .5 .fl// . 11:51 : U. . a . 4 ' f € D> -- I - 1" --- .~.i~fi~~i~ -531**94-- 40 lk : . 1 2 -2 r. 4 , 1 1 1- - -1 - . 1/ 2, i 1 - U /7 =l 0; If 3 4 A il:)4 -,2-26,<----_. 3 /9~ 1 .. t-, 1 1% 0- 7, : *ta 1 . 1 • E h 7- A-- : -- . g. . q e ~ ' · ~ 10:L.. p 1 .. / -M i %/ 1 - -i// j, 149 21, 71 .. 1 - , : N*41 f--4 .1 - '71 Kil --F- ft· f < i:- I . .. 0 11 ; 1 1 1 It - - E-1. 1, 1 1 1 =r : 0 / 1\ t t 7 0 - 1.-' 1 '1 p l \ :43 - " - 2-2 - .- 4,/7. • SECTIONS /9,20,29,30,3/,32. T 5 N, R 72 W, SECTIONS /5,22,23,24,25,26,35,36, T:N, R 73W TOTAL AREA WITHIN CORPORATE LIMITS\ 3,327.7 ACRES 1 I ,••I SECTIONS 1,2,1/,/2, SECTIONS 6,7, ROCKY U PARK . r 22 23 ..... 'I. I. I [i j .\ - Ul' 6 1 1 u.: .V V W 'U U 4 0 9 kTT 1981 APR 29 1'11 12: U f F · * ~ ~i COUNTY OF LARIMER STATE OF COLORADO ' ' IMPROVEMENI' COVENANT AND HOLD IIARMLESS AGREEMENr 1 Wl[EREAS, the undersimied, The Congressional Corporation, being ~ the owner of all the land more fully described herein, and ' 9 WIIEREAS, the undersigned is in the process of presenting an Amended Plat of said land to the Town of Estes Park, ruid 1 / WHEREAS, as a condition upon which said Amended Plat will be i accepted and approved by the Town of Estes Park, the Town of Estes Park is requiring that this Improvement Covenant and IIold liarmless Agreemen t be executed by tlie undersigned. NOW, THEREFORE, in consideration of the aforementioned premises, the undersigned covenants and agrees as follows: 1. 'lhe undersigned, The Congressional Corporation, is the owner of all the land within the boundaries of the "Amended Plat of Lots 10, 11, 12, 13, 14, 15, 16, and 17, and portions of Lots 1, 6, 8, ! and 9, Elkhorn Estates Subdivision, Town of Estes Park, Colorado. ' 2. As a condition of the approval of the Amended Plat by the : Town of Estes Park, that The Congressional Corp., or any subsequent i : owner or amers of said property or any lots thereof, shall be responsible to the Town of Estes Park for the cost of the installation ' 1~ and paving, street improvanents, mid/or utilities, as required by 6 Title 16 of the Municipal Code of the Town of Estes Park. The v.nder- ~ signed or any subsequent owner of the property of any lots thereof, i agrees to pay for such inprovenents when said inprovenents are required 1 , I due to the development of the subject property. It shall be the i decision of the Town of Estes Park as to when said inprovememts ! are required. In the event that sane lots are separately owned at the time the improvenents are installed, the cost shall be prorated: amoung the owners of the lots on the basis of street frontage of the lots abutting said improvatients. . In the event the undersigned or any subsequent avlier of any if the aforementioned property fails to pay for the aforementioned I improvements, the '1'own of Estes Park shall be entitiled to recover i fran said owner all costs of enforcing this covenant including reasonable attorney fees and Court costs. ! 3. The undersigned and nny subsequent ,]wrier of Int 12 of the Amended Plat of Lots 10, 11, 12, 13, 14, 15, 16, and 17, and portions ~ of Ints 1,6,8, and 9, Elkhorn Estates Subdivision, also agrees : to hold the Town of Estes Park hannless fran any damage incurred to the structure located on Lot 12 that is the result of slippage or dislodgenent of any of the fill nlaterial used in the relocation ! I of Fall River Lane. · i 2-3 RECORD OF PROCEEDINGS Public Works Committee August 21, 1972 Committee: Chairman Dannels; Trustees Petrocine and Prosser Attending: Chairman Dannels; Trustee Prosser Also Attending: Town Administrator Hill, Street Superintendent Mceracken, Town Planner and Engineer Van Ilorn Absent: Trustee Petrocine This special committee meeting was for the purpose of establishing policy on street improvements and maintenance in the proposed Fall River annexation. The Committee decided the Town of Estes Park will improve and maintain the existing roads when they are properly dedicated or deeded to the Town. The minimum width acceptable is thirty feet. There being no further business, the meeting adjourned. 0, F /4 / Col €c-- 0- L ho 0 Dale G. Hill, Town Administrator 2-4 CONTRACT CHANGE ORDER 009 COLORADO Order Number State 8/18/92 LANIMER Date County Cort t.rnel for: _.~18!KY .'S...bblile..W/\'1'J*._'!'12-!EA'l'MENT FACT hi'l'Y Owner: TOWN OF ESTES PARK '1'O : Jennison Construelion Company (Contractor) You her·eby requested to comply wi l.h l.he fol lowing ch,iriges from t,he contract plans and specificaLions: Description of Chunges 1)(:(31'(!1134(! Inenuls¢: Supplement.al plnns & specs aLLoched Con I. r:1(:I. Price ConErnet Price f) A $ 6 1 H . 00 913 $ 821.00 f) C $ 4853.00 91) $ 1170.00 '1'OTAI,S $ $ 7462.00 NET CHANGE IN· CONTRACT PRICE $ N/A $ 7462.00 JUSTIFICATION: See ult.ached Change Work Ilequest forms The Amount of the Contract will be (increased) by the sum of ($7462.00) Seven Thous:inds Four Hundred Sixty Two and 00/100 DOLLARS. The Contract Total including this and previous orders w.ill be: $4,248,527.28, DOLLARS. Four Mi 11.ion '1'wo Hundred Forty Eight Thousand Five Hundred Twerily kleven and 28/100 1)01,LARS 4 '44 9 The C{)111.1·11~11 l'et'iod prov.ided Ent· complel,ion tjill 1,(3 (4(;()+,>l) = /2~/4/4 4%3* 3-1 CHANGE WORK REQUEST PROJECT: MARYES LAKE WATER CHANGE IN WORK REQUEST NO. : 9A TREATMENT FACILITY ENGTHINERS PI?.OJECT NO:9-0223.018.00 OWNER: '1'OWN OF ESTES PARK INITIATION DATE: August 18, 1992 ESTES PARK, COLORADO TO: JENNISON CONSTRUCTION CO. REQUESTED HY: TOWN OF ESTES PARK 8122 S. PARR l,ANIE SUITE 210 LITTI,ETON, CO 80120 AUTHORI ZED HY: TOWN OF ESTES PARK PLEASE FURNISH CHANGE IN CONTRACT SUM FOR THE CHANGE IN WORK DESCRIBED BELOW. DO NOT OIll)ER MATERTAL 01?. Sri'Al?'1' ANY WORK UNTIL APPROVAL IS RECEIVED. EVERY EFFORT WILL RE MADE TO INCORPORATE TH]S CHANCE INTO THE WORK-WITHOUT-APPECTING THE CONTRACT DATE. Miscellaneous upgrndes Lo chemical lines, snmple lines und poluble wnler lines. Jennison Consiruclion Company (:PR-43. I agree to change Lhe work described above Vt,r the change in prices shown below. 1 have aLLached a breakdown which lists u]1 costs of 1 abor, mal.eritils, 1.,ixes , overhend, prol' it., and al l ol.her changes and/or charges involved. Signli.Lure of Lhe contractor indicates his agreement herewith, including any adjuslment in the Contract Sum or Coril.ract Time. The Coril.rac: L Time wi] 1 be (wric.hunged) 1,7 till_ (N/A) days. No change in Contract Sum (Tnitial if no change) N/A ADD l.0 l.he Contract Sum $618.00 DEDUCT from the Contract Sum N/A '1'his informati.on shal.1 be valid for thirty (30) calendar days from the date of si.gnal,ure below. CONTRACTOR 'S STONATURE -««m«- DATE S ·(9 -9 2_ Cont.ractor sha,11. r€~0 ri owi«My< unpy and return ORIGINAL to 0 / 11 1 Engineer. APPROVED BY ENGINEER. fuL\1 jv,H+4~ DATE 226*92, AIJ'j'HORIZED HY OWNER 1) ATE ACCEPTED CHANGE IN WORK REQUEST WI 1,1., BE 1 NCLUDED IN A Fll'1'111?.E FORMAL CHANGE ORDER. DO NOT B l 1,1, FOR '171 I S CHAN GE U NT 1 1, A FORMA L ----- CHANCE 0111)17.12 HAS BEEN EXECUTED MY ALL PARTIES. ACCEPTANCE IS DTRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. NOT VALTD UNLESS SIGNED HY THE OWNER, THE ENNIN KEN AND THE CONTRACTOil. 3-2 PROJECT: MARY ' S LAKE WATIER CHANGE IN WORK REQUEST NO.: 98 '1'REATMENT FACTLITY ]EN(11 NEERS PROJ ECT NO:9-0223.018.00 OWNER: TOWN OF ESTES PARK INITTATTON DATE: August 18, 1992 ESTES PARK, COLORADO TO : .1 F. N N I S O N CO N S 'I' R I ) ( 17' 1 O N (30 . REQUESTED HY: TOWN OF ESTES PARK 8122 S. PARK I,AN E SUITE 210 LITTLETON, CO 80120 AUTHORIZED BY: TOWN OF ESTES PARK PLEASE FURNISH CHANGE IN CONTRACT SUM FOR THE CHANGE IN WORK DESCRIBED BELOW. DO NOT ()Ill)El?. MATERIAL OR START ANY WORK UNTIL APPROVAL IS RECETVED. EVERY EFFORT WT],I, BE MADE TO INCORPORATE TINS CHANGE INTO THE WORK WITHOUT AFFIEI'ING '1'liE CONTRACT DATE. Ext.end ladder :111(] Snf-'1'-Cl init) for clenrwell access. Add additionul chemical room door signnge. Add stainless steel hopper cover. Jennison Construction Company C 192-46. T eigree 1.0 charige I.he. work deseribed above f o r· the change in prices shown below. T have atinched n breakdown which lists all costs of labor, muterials, Enxes, overhead, profi t, and n 1 1 other changes and/or charges involved. SignaLure of the conlr:icl.or indical.es his agreement herewith, including any adjustment in the Contract Sum or Cont.nx:L Time. The ContrneL Time will be (unchanged) hy Nld (N/A) days. No change iii Coril,rac:I. Sum (Inil.i 111 i r no c :linij-ge) N/A Al)11 Lo t.lie ('.otil.rnel, Sum __Ii !12!_: f)-0 1)El)U(.71' from I,tre Cont.nrc.L Sum __NA This information shall be valid for I.hirt.y (30 ) cia ] endar dn.ys from Lhe date of signaLure below, CONTRACTOR 'S ST GNATURE -n.»L/\AI O.u/ DATE ~ ~9. T -7 / \-1 Con trnclor shall l'el,fli,fi ond' copy and return ORIG[NAL to Engineer. APPROVED HY EN(11 NEER \4t/ DATE ...2)E~&«22- r AUTHORIZED BY OWNER DATE ACCEPTED CHANGE IN WORK REQUEST WILL BE INCLUDED TN A FUTURE FORMAL CHANGE ORDER. DO NOT Bll.,1, FOR '1'11 [S CHANGE UNTIt, A FORMAL CHANGE ORDER HAS BEEN ENRE[j+RD-HY ALL PARTTES. ACCIUm'ANCE TS DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. NOT VALID UNLESS SIGNED HY THE OWNER, THE ENGINEER AND THE. C'.ONTRACTOR. 3-3 CHANGE WORK REQUEST PROJECT: MARY'S LANIE WATIER CHANCE IN WOR.K I?.ERNEST NO.: 9C TREATMENT FACT 1,1'I' Y ENS[NEERS PROJECT NO:9-0223.018.00 OWNER: TOWN OF ESTES PARK INITIATION DATE: August 18, 19[12 ESTES PARK, COLORADO TO : .1 E N N I S O N C O N S ' 1' 1?. l e 'l' 1 O N C O . REQUESTED HY: TOWN OF ESTES PARK 8122 S. PAR.K LANE SUITE 210 LITTLETON, CO 80120 Aljl'1101?.TZED BY: TOWN OF ESTES PARK PLEASE FURNISH CHANGE IN CONTRACT SUM FOR THE CHANGE IN WORK DESCRIBED BELOW. DO NOT ORDER MATERIAL OIl START ANY WORK UNTIL APPROVAL 19 RECEIVED. EVERY EFFORT W [1.11, IllE MADE '1'0 ]NCORPORATE THIS CHANGE INTO THE WORK WITHOUT AFFECTING THE CONTRACT DATE. Upgrndes Lo the UPS HyS |.(3111. Loc:,11.p. UPS branker panel in electrian 1 room. Panel PP2E will no longer be fed by UPS. Jennison Con 41.ruction Company CPR- NOA. T agree to change the work described above for the change in prices shown below. T have attached n breakdown which lists n] 1 costs of labor, materials, Laxes, overhead, profit, and all. other changes and/or charges involved. Signature of Lhe contractor 11:di.cates hi.s figreement. herewith, i.tic].uding any adjust,ment in the Contrtic L Sum or Contract Time. Fov, 4 r 1-VJ '1'he. Contract Time will be (increased) hy '1>!lg (~1) days. No change in Coril raet Sum (lri i t. i 01 i f no hhange) N/A Al)1) 1,0 the (lontract Stlill _*4{}Q{}ing DEDUCT From Lhe Con 1.rac L Sum N/A This informalion shall he valid for thirty (30) calendar days from Lhe date of signature below. CONTRACTOR'S STSNATURE _ 15+27-121-5/&9-4/ . I) ATE B /9-91 Contractor shall reLai one,f (,0 -:opy and return ORTHINAI, 1.0 Engineer. m 11//1 0 APPROVED BY ENGTNEER ' A,A- O/a~- DATE tilz okL AUT]IORIZED BY OWNER / / DATE ACCEPTEl) CHANGE TN WORK 1111:{RIJEST WILI., RE TNCI,Ill)ED IN A FIJTURE FORMAL CHANGE 01?.DEl?.. 1?9.--NO'!'_11!-!il. FOR THIS CHANNE UNTIL A FORMAL CHANGE ORDER HAS BEEN EXECUTED HY ALL PARTIES. ACeEPTANC:F, TS DIRECTION TO PROCKED WITH THE WORK DESCI?.[BED HEREIN. N( )'1' VAI,T I) UNI,ESS SIGNED HY THE OWNER, THE ENG I NEER AND THE CONTRACTOR. 34 ,, CHANGE WORK REQUEST PROJECT: MAI?.Y'S LAKE WATER CHANGE [N WORK REQUEST NO.: 91) TREATMENT FACILITY ENGINEERS PROJECT NO:9-0223.018.00 OWNER: TOWN OF ESTES PARK ]NITIATION DATE: August 18, 1992 ESTES PARK, (COLORADO '1'o: .JENNI SON CONS'l'RUCT]Ohi ('.0. REQUESTED HY: TOWN OF ESTES PARK 8 122 S. PARK [,ANE SUITE 210 LITTLETON, CO 80120 AUTHORIZED BY: TOWN OF ESTES PARK PLEASE FURNISH CHANGE IN CONTRACT HUM FOR THE CHANGE IN WORK DESCRIBED BELOW. 1)0 NO'I' 01?1)1E1? MATER I AL OR START ANY WORK UNTIL APPROVAL ]S I?.ECE[VED. EVERY EFFORT WILL RE MADE TO INCORPORATE THIS CHANGE INTO THE WORK WITHOUT AFFECTING THE CONTRACT DATE. Upgrade brenhers in panels PP-2(:, Pr-ZE und PP-2 F from 40A to 100A. Jenni son Consiruction Company CPR-52. I agree to change Lhe work described above for the change in prices shown below. 1 h a v e a L 1. n c h e d n b r e a k d o w n w h i c h l i s t s n 1 1 cost.s of labor, mal,et·inls, 1.#ixes, Overhead, profit, and all other changes and/or charges involved. Sign#,Lure of Lhe conit·neLor indical.es his ngreement herewil.h, including any ndjusl.ment in the Contract Sum or Conl.rneL Time. '1'he ('.01,1.ract. Time will 1,0 (unchanged) hy NLA._ (N/A) days. No ch:inge i n (101,1,1·1101, Sum (111 i I. i :11 i [' 1,r) (1|1211,ge) __N/A_.,. _._ ADD Ix} Lhe Contract Sum $117(}.{)() DEDUCT from Lhe Contract Sum N/A This informution shul] be valid for thirLy (30) calendur days from the date of signature below. CONTRACTOR 'S SIONATURE -pk~la- 1)ATE 9-19,94. AJ.tk Contractor shall rel.Vin o U e/jff cir)py and rel.urn ORTGINAL to Engii,eer. APPROVED BY EN(11 NEEI?. 111-wt ·f..f- DATE 8/-20/6/L il A AUTHOR[ZED HY OWNER 1) ATE ACCEPTED CHANGE I N WORK REQUEST WILL BE I NCI,IJI)El) IN A FUTURE. FORMAL CHANGE ORDER. DO NOT BiLL FOR THIS CHANGE UNTIL A FORMAL CHANGE ORDER HAS BEEN EXECUTED HY ALL PARTIES. ACCNEPTANGIE TS DTRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. NOT VALID UNLESS S I GNED HY THE OWNER, THE ENG I NEER AND THE CONTRACTOR. 3-5 1. TOWN of ESTES PARK Inter Office Memorandum August 25, 1992 TO: Bill Linnane, Public Works Director FROM: Greg Sievers ~,~f SUBJECT: Street Improvement Project Change Order #1 Attached is Change Order #1. I am requesting these quantities for the following reasons: 1. Tonnage increase to accommodate the large state highway intersection radii. Four of the five streets intersect state highways. 2. Patching quantities increased due to the existing 5" thicknesses found on Manford Avenue and Community Drive. 3. Paving fabric is recommended for a total covering on High Pine Drive due to its extremely deteriorated condition. 4-1 1. CIIANGE ORDER Change Order Number 1 as of (date) August 14 , 1992-. for Town of Estes Park Project: 1992 Street Improvement Project Contractor: Western Mobile Original Contract Price: $ 57.970.00. Address: P.O. Box 18570 Boulder. CO 80308 Gentlemen: Upon Contractor acceptance and Owner approval, the work and Contract Documents for the above mentioned project will be adjusted to include the following: 1. Street Overlay 42" AC 50 tons $31.50/ton $1,575.00 2. Street Patching 381.4/SY $10.00/SY $3,814.00 3. Fabric Patching 805/SY $ 1.00/SY $ 805.00 TOTAL $6,194.00 Contract Caleiidar Adjustments to Contract Price and Time Price Davs Contract Totals through and including Change Order No. 1 : $ 57.970 20 Adjustments this Change Order: (Increase) (Decrease) $ 6.194 0 Contract Totals to Date - Including this Change Order; $ 64.164 20 Contract Time Expires on: September 5. 1992, APPROVED: Company: TOWN OF ESTES PARK By: By: Title: Title: Public Works Director Date: Date: 4-2 ROCKY MOUNTAIN CONSULTANTS, INC. gmc 437 South St. Vraln Estes Park, CO 80517 (303) 586-2458 Metro (303) 825-8233 FAX (303) 825-8912 Augusl. 24, 19 !) 2 Bill Litill:Ille Town oE ENLe4 Pai·k P.O. Box 1200 Esies Park, CO 80517 Re: 1992 WaLer Looping ProjecLH Dear Hill: Rocky 14'Ir),11!l.ni,11 (1011>41,11.;1111.4, 11,(t. (I?.M(.1) is providing f.(,>1|, estimates for the 1992 WaLer Looping Projects. The est.imated project costs are as follows: HEq j. / 1(. 1.1. EstimnLed Cost. M:,11 for·(1 Ail,lil.ir,11 lili.f· r·,tr)t,11(·f· 1. i {,11 .............., !1:",5 , 51)(1. {)1) Sunny Aerev Addil.ion Loop......................$27,500.00 Wesl. Wonder·vic.w Aven,1,· Wai.(.1· Mnin E.x|.ensif),1.,.,*(;7,5(H).00 Moilit L View Park Water Na.in.....................$19,000.00 1992 Wnter Looping Projects...................*139,500.00' [ f you ha.ve ariy giles|. i 0113, pl en!-4(·~ (111 noL lur-t i Eli Le |,0 cal l , S i ric: f? r· ely, ROCKY MOUNTAIN CONSILTANTS, INC. -, 2 - 0-71 --- //26€=Z»- , -lzE-- KI,vi,1 1/.Ki/'111 Civil kilgitic,er APK\wjk CIVIL AND ENVIRONMENTAL ENGINEERING • PLANNING 5-1 . TOWN OF ESTES PARK, COLORADO 1 ~1*#0 41*,p,r#7*#CA P.O. BOX 1200 Mt*fixit,424,6 ESTES PARK, COLORADO 80517 210 ~.folf.*** PHONE: (303) 586-5331 4 Tjar I T 1 1 11\ T \ ),)--··I=~=·fip~~--Ii~(F 11*---~----***-----T-T. / ~:.~\* MOUNT VIEW PARK PROJECT LOCATION k 4 -- 11«« 1:Illi' 11]-1..... ·~i'~jt~ SEE SHEETS 6 8 7 1 *'46·2, --d ATRAEGER StleD. PRO.IECT 1-~ 1.91\11 »4: T .1 < 1/ .j) 1 1 -\.d ?.1! i t . . k tii| i ..t.OCATION SEE SIIEET S 8119 i,-1 1 W. ti#;1-[19·lit ·?.- 21 .2 - /-1 ·limtu : 1 1 k* ,,~V~L~-r J ,~1F~:5 -~~1~ 9044 IME~-r=-- 4%*w -- i i-1-*2,2 'i··:n-'Figjit<f7.*-LII 2.,i '-34---· - ,~· -,A#J~,43*·9*48,11i' ~ S -f....i.- 2.- 1--4-ittlrifil[,1 -61 Y:ul.gs. -lii&*(jl~%- DA 2.F,2..9~- .-4 *if?4:tr ·5 ·· · 1 W WONDERVIEW PROJECT LOCATION AlidfZ~te·'b 1:32··rii;MJW~- 4 «t ·-· =u,f--9-r-- SEE SHEETS 485 in.'Auta#ANVIAG>5{2~179>~ iNkj.· ··· ····· SUNIJY ACRES ADON PROJECT LOCATION ~ 1 --.V-- 1 -m-aw'.1~11)m#ti##5)44-F+1 4,/Cr SEE SIIEET 3 =- ~~~~~~,.i~ 1 < ~bil ·· •,0, 4 .'4E+~3 T ~C~~~~f~~ ~12- 1 1 9 4, -4 1/ 4 f .4 41....,5 th A I t. .1- ./.1: .14¢f-1-· = ./4 - 2 .1-9 -/1* 1.1:,<41111: 47,fl*)'t .1 1 1 >«tir>141:.7:-Ili -: :,rif lit~ i I,ili~lk:yA~,ET 2 v 1,pMANFORD ADDN PROJECT - i iy'-i -9745~#.~hi41 j tw * - *14.1.11:l )9114* 11 /; i 1 1 -3.-?...il-tr-- 91*F·· fy*'il~~illl 21'(N- .if. . C. ··- --=. -1 -· 0* , .rrf.134,liL liH 'A 11| | LI F -__i *~J~ill· -- ---IE- ! ia 2<· ' Ill l / 1 1 ' - 1 1 1,21 1111~11€\I b '/66-45-32- M'TA** 14*4,4 0--Ittl~·U~LAAM# 904>f-Ifix .,2 1.:n 1---1-.1/2.5,4 -- 1- - - .. .'-re»wri f~~6~.~~0~~*~dd#V..ir--- -..- b ./2.1 · ]Iil>f:,· ~: ,_-LF w ,'2'1141|0. 1/'.~~14 ./; 1 1 1/11! , - 71.9.74396%44 .. r - 3. 4.1 1. . i -1-1- ---- 1+- - - -|1 -Ctft,·2-1-i=Cltg~*-;-.v FrTGBff -2-------4-- - *#-4 'd-'LE'134%444.- 1l ~| * - gl 411' IN.:2' :':73:I 1 . 4 0*49ki.....- 1 1 ----. _. _ « 4 ili~ ?~ 34 ~~»3:1 VICINITY MAP N.TS. 5-2 ROCKY MOUNTAIN CONSULTANTS. INC. 9mC 437 Soulh Sl. Vialn Esles Park, CO 80517 (303) 586-2458 Metro (303) 825-8233 FAX (303) 825-8912 August 24, 1992 Iii 11 Iii!1111~11€3 Town of EMLes Purk P.O. Box 1200 Estes Park, CO 80517 Re: Trueger Subdivision Water Main Project (TALL 2.Jete. U. M ..7D,tn o~) Dear Bill: Rocky Mount.nin Consultants, ine. (UNC) is providing a cosL estimate for a 629 lineal foot secLion of 12" waker main which will cross Trneger Subdivision. The wal.er muill will he cons I.rueled prior I.(1 paving n I. 1.11 (, s i I.c·. Thic, will 1),tneril. 1.lie Town by decreasing construel.ion cosi.4 (eliminates repaving) and the owner of I.he proper·t.y (eli min:il.es :,splint t. p:·il,clies. ~Fi re 6- prolter.:1.ion wil l. be firlded 1,0 1,1,(. prriher:I. vi:] n |'ire hydr·h,)11 al. 1,}re 1 owner' 4 r·:x])(311$41. i f lic! 8,1 (]Ps i reK . f'~'1'lir. cligi 1 tr,(:rs n s I.im:il.r: f'or #013 construction of the project is $14,000. T f you have any questions, please do noL liesi |.,il.,1 1.0 e:,1 1. :; i lir.,· t·,/I ,· , ROCKY MOUNTAIN CONSIIL'VANTS, 1 N(:. K,·vii, 1'.Ki,·11, (Ji v i I E,ig i tic:fi,· 1(PK\14 j k 6-1 CIVIL AND ENVIRONMENTAL ENGINEERING • Pl.ANNING TOWN OF ESTES PARK, COLORADO 34 .4,1,61- 4-rkl P.O. BOX 1200 ESTES PARK, COLORADO 80517 y'*14,£***23*- PHONE: (303) 586-5331 Rilr iii \ f ..... ! i-~744.-1 ! 1 / <..f|P MOUNT VIEW PARK PROJECT LOCATION A NE - -1 11..4-111 [ .*W, SEE SHEETS 687 4*th41 - i •TRAEGEA SUBO. PRO.IECT ~i ~7 f~ ril Il:1 j_l ~:40-0 ~1 i ;~l~} .~0~i~LOCATION SEE SHEET S 88 91 X J'i i : t ... 7 11 22-13 --~-:~ -%96-[<-i.--1 %Mu-<* .3,qk*jIfWAi- _ 0 14$/ I i ~ ~:4*ff.fuff»-~.ir+Ilik?/r»{ftil-=-~21.)1.(14%*fit~i~«..~u~ ~*~~~~~ ~ ff..1.-i b t\'telt*•· ' 1-1-21-3409-4.....1:LANFI-f:·.'9*03, . 2 --".,t'·*i:~# 1%6,94 *f f - - 4~1~ijit<%.~ j.29»-:tq?)3.Iliati - W WONDERVIEW PROJECT LOCATION ,|~~~47*/viy*.i.4:11# M ; mor -U63 0.7&.*...LAI.-' 1,2,ki SEE SHEETS 485 , ' SUNNY ACRES ADDN PROJECT LOCATION ~1.-24*4117.1-~~79¢~F~'~~~~ I __ _--p~»..3%9~tg?i,·}ilfk¢<758%».1-]--..Cr...~R, 5 4 ~ =4. L...i:]t-.--flh N 1 J MANFORD ADDN PROJECT '50=) pr-lhop., ipme 4419 - i : , SEE SHEET 2 1- 3-312(-j»fit-3~ -,f- 2 ----flf¢11'rrN,9 .~ 1 -1-7,4-1 , 1 c..41:fi j,1*f~ -42 4 2- 1 --1 4, w gi -- · ©2.n---F:f.;' 1 1 \ ly-{0.---9311~ -t~~ 411 h .4?¢ 6 - 93.~tuilly- U.IN 1214 f., 1.7, - 1------1 fk'·.ir - ·i-· " -f'-i»'. 1 liff€4:P=42*21£92ri F,]*lr,3 ~··gf··s..c-1 ~. ---" I al·:Lof» / : . 1 ' : 3 " 11<I - 1 -2- A--**1-7*pt,2,09./·r . -·1 . kj /!.A,%#*U.·>gy 1 1 1 4 7411 3 ' ' ' 9441.-1. 1 8'1/1,% Ii; 1 &'1 1 :1.-67:tify,KIL¢*'i .Bi:·.7 :In.:i 1 i ..b 1 1111'1~~~- VICINITY MAP N.T.S. 6-2 TOWN OF ESTES PARK PUBLIC WORKS DEPARTMENT Cll-IZEN SERVICE RESPONSE REPORT JULY 1992 TYPE OF CALL NO. OF CALLS HOURS UTILITY LOCATION - MAIN 21.00 37.00 UTILITY LOCATION - SERVICE 4.00 10.00 TAP REQUEST 7.00 17.50 WA1 ER QUALITY - TASI E 3.00 3.50 PRESSURE PROBLEMS - LOW 1.00 1.00 LINE BREAKS - MAIN 3.00 39.50 METER REPAIR 54.00 105.00 FINAL INSPECTION , 7.00 6.25 STREET REPAIR 1.00 1.00 STREET SWEEPING 1.00 1.00 SIGN REQUESTS 1.00 1.00 STORM DRAINAGE 1.00 5.00 TRAFFIC HAZARD 1.00 2.50 OTHER 10.00 16.25 ======== TOTALS FOR JULY 1992 115.00 246.50 HIS-rORICAL DATA THIS MONTH LAST MONTH LAST YEAR TOTAL CALLS 115.00 87.00 88.00 TOTAL MAN 1IOURS 246.50 189.75 169.25 %CHANGE(CALLS/MHS) +32.68%/+29.91% +35.38%/-1.600/0 +30.68%/+45.64% R 1-1 ESTES PARK JULY& YTD WATER BILLED 160,000,000 ~ 0.1% f- 01 ,1 1 140,000,000 - fl- 4 -4 i -W 1- 1 r- *: mi * i 120,000,000 -'ca 8 If?-m , - 1 1 91 -p':-9 _#£_ 9 100,000,000 - GALLONS 80,000,000 60.000.000 - ~ 8, --%1-1 1 40,000,000 f 41 -- 8 - 88 , f.. ': 4. - -15,61% 7 i·t 1-i@ ..nt:31 20,000,000 -'le &0· 49 ti·®411 fit: H 0 ,-Mt _m t: trf-_f 417_14 9 31,- 4~· ~1-3 4 ~ .~+ 4.49 d M fl * A W h 00 C) 0 - M CO CO CX) OX) EX) CO 00 DC) 0, 03 0 1 01 01 0, 0, 0/ 0/ 01 0, 0, 0} - --- 1 YTD YEAR 5 JUL ESTES PARK JULY & YTD WATER REVENUE 600,000.00 -- -0.6% 500,000.00 - .c• Bl It lit Il 041 1! li 400,000.00 -= .9 DOLLARS 300,000.00 - 2 Eli 111 4 I fll-~~~1- 1Ilitil--15.13% 200,000·00 -1~1-4I- I-WI-Wl-I -8 -411111-11.1 4'1 100,000.00-lili-*4-!i -11,1-All,ZE - #L tl,6 EW*" F.lb'*I 2 m E E m E 2 51-0, 81 01 01 0 0-) Cl C, C, C) 01 01 8 YTD YEAR i JUL R 2-1 al h TOWN OF ESTES PARK JULY, 1992 ACCOUNTABLE WATER REPORT 1) Treated water for June 14,1992 through July 13, 1992: June 14 to 31 Water Treated: Black Canyon 0 *Fall River 0 Glacier Creek 22,367,000 * Big 1 hompson 6,038,907 *Crystal 0 July 1 to 13 Water Treated: Black Canyon 0 *Fall Iliver 0 Glacier Creek 20,899,000 0 Big Thompson 5,503,791 *Crystal 0 Total Water Treated in Billing Period 54,808,698 Gal. 2) Water accounted for from June 14 to July 13: Adjustments: 2,361,110 Billing: 38,203,710 *Backwash . 577,135 Total Water accounted for: 41,141,955 Gal. 3.) PERCENT ACCOUNTED FOR: 75% R 2-2 ADJUSTMENTS JULY, 1992 1.) Water Dispenser TOTAL WATER DISPENSER (Gal.) 159,000 2.) Bleeders a. Stanley Heights, Fall River 1,831,810 b. Metered plus Mize 122,000 TOTAL BLEEDERS (Gal.) 1,953,810 3.) Flushing/Leaks/Misc. a. 7-Jul Fire NPV North 150,000 b. 8-Jul Broken meter 34,000 c. 9-Jul Flush 5th St 5,000 d. 10-Jul Broken meter 59,300 e. f. g. h. i. j. k. 1. m. TOTAL FLUSHING, MISC. (Gal.) 248,300 TOTAL ADJUSTMENTS (Gal.) 2,361,110 R 2-3 TOWN OF ESTES PARI< WATER USE RECORDS JULY, 1992 -ATE BLACK FALL GLACIER SUBTOTAL 810 CRYSTAL SUBTOTAL 1 : TOTAL CANYON RIVER CREEK (GAL} CFS TIIOMP. (GAL) CFS ,... (GAL) i 0 0 1,268,000 1,268,000 1.97: 400,146 0 400,146 0.62} { 1,668,146 2 0 0 1,408,000 1,408,000 2.19 ? 9 307,604 0 307,604 0.48 i i 1,715,604 8·{ I> 3 0 0 1,536,000 1,536,000 2.39: 4 434,361 0 434,381 0.67. 1,970,361 4 0 0 1,832,000 1,832,000 2.85 396,888 0 396,888 0.61 Li 2,228,888 5 0 0 1,724,000 1,724,000 2.6811 515,396 0 515,396 0.80{ 2,239,396 6 0 0 2,188,000 2,188,000 3.41 515,172 0 515,172 0.801-1 2.703.172 7 0 0 1,525,000 1,525,000 2.37 332,695 0 332,695 0.51 1,857,695 8 0 0 1,243,000 1,243,000 1.941 4 468,838 0 468,838 0.73 i i 1,711,838 9 0 0 1,589,000 1,589,000 2.47 404,047 0 404.047 0.63 E j 1,993,047 10 0 0 1,805,000 1,805,000 2.81 : 502,789 0 502,789 0.78 2 2,307,789 11 0 0 1,731,000 1,731,000 2.70 ; i 406,989 0 406,989 0.63 3 2,137,989 12 0 0 1,394,000 1,394,000 2.17 328,459 0 328,459 0.51 ' 1,722,459 13 0 0 1,656,000 1,656,000 2.58 ] 1 490,407 0 490,407 0.76 2,146,407 14 0 0 1,624,000 1,624,000 2.53 416,765 0 416,765 0.64:i 2,040,765 15 0 0 1,825,000 1,825,000 2.84: 396,888 0 396,888 0.61 2,221,888 16 0 0 1,709,000 1,709,000 2.66 i i 396,888 0 396,888 0.61 1., 2,105,888 17 0 0 1,148,000 1,148,000 1.79, 428,170 0 428,170 0.66: i 1,576,170 18 0 0 1,802,000 1,802,000 2.81 : 419.046 0 419,046 0.65. 2,221,046 19 0 0 1,523,000 1,523,000 2.37 1 i 339,212 0 339,212 0.52 1,862,212 20 0 0 1,375,000 1,375,000 2.14 512,565 0 512,565 0.79. 1,887,565 21 0 0 1,465,000 1,465,000 2.28 348,010 0 348,010 0.54 1 1,813,010 22 0 0 1,070,000 1,070,000 1.67: 477,699 0 477,699 0.74 1,547,699 23 0 0 1,259,000 1,259,000 1.96 : 438,271 0 438,271 0.68 ' J 1,697,271 24 0 0 2.020,000 2,020,000 3.15: 454,564 0 454,564 0.70 i 2,474,564 5% 0 0 1,442,000 1,442,000 2.25: 438,271 0 438,271 0.68.· 1 1,880,271 0 0 1,137,000 1,137,000 1.77: j 449,024 0 449,024 0.69: 1,586,024 27 0 0 1,352.000 1,352,000 2.11: 445,114 0 445,114 0.69 1,797,114 28 0 0 1,731,000 1,731,000 2.70 1 441,204 0 441,204 0.68 2,172,204 29 0 0 1,509,000 1,509,000 2.35{ 449,024 0 449,024 0.69 1,958,024 30 0 0 1,839,000 1,839,000 2.86: 342,313 0 342,313 0.53{ ~ 2,181,313 31 0 0 1,973,000 1,973,000 3.07. 593,972 0 593,972 0.92: 2,566,972 TOT. 0 0 48,702.000 48,702,000 :j 13,290.791 0 13,290.791 61,992.791 *i AF 0.00 0.00 149.47 149.47 40.79 0.00 40.79 190.26 CFS 0.00 0.00 2.43 2.43 0.66 0.00 0.66 h ~ 3.09 1 {} E § BWI-1 N/A 0 N/A 0 ,{ -946,900 0 -946,900 -946,900 BLI-) N/A N/A N/A N/A 2 N/A N/A N/A -2,361,110 GAL 0 0 48,702,000 48,702,000 : 12.343.891 0 12.343,891 ~ 58,684,781 37.88 0.00 37.88 180.11 AF 0.00 0 149.47 149.47 1st-13 0 0 20,899.000 5,503,791 0 14-31 0 0 27,803,000 7,787,000 0 R 2-4 TOWN OF ESTES PARK TOTAL WATER PLANT PRODUCTION (CALENDER MONTH MINUS BLEEDERS) 1991 1991 1992 1992 MONTH YTD I i MONTH YTD % % X MONTH TOTAL TOTAL & 1 TOTAL TOTAL : f CHANGE CHANGE (GAL.) (GAL.) (GAL.) 8 j (GAL.) (GAL.) 1 (MONTH) (YTD) JANUARY 25,753,376 25,753,376 k { 22,227,168 22,227,168: 1 -13.69% -13.69% FEBRUARY 20,818,236 46,571,612 t 1 18,753,245 40,980,413> 1 -9.92% -12.01% MARCI-1 23,065,946 69,637,558 i ~ 22,019,445 62,999,858 2 1 -4.54% -9.53% APRIL 23,868,231 93,505,789 f 24,054,701 87,054,559 .6 0.78% -6.90% MAY 33,828,478 127,334,267 39,232,054 126,286,613 ·· i 15.97% -0.82% JUNE 47,550,123 174,884,390 1 if 44,414,452 170,701,065 2 1 -6.59% -2.39% JULY 61,171,426 236,055,816 58,684,781 229,385,846 -4.07% -2.83% i § AUGUST 54,753,043 290,808,859 f i SEPTEMBER 45,080,259 335,889,118 i j OCTOBER 29,400,590 365,289,708 1 f NOVEMBER 21,662,560 386,952,268 1 I I DECEMBER 21,290,647 408,242,915 TOTAL 408,242,915 1C - FT 1,252.94 R 2-5 TOWN OF ESTES PARK PARK & RIDE STATISTICS July 19 - July 25 1992 - TROLLEY - OTHER - PARKED AT WORK SMTWTFS 07/19 07/20 07/21 07/22 07/23 07/24 07/25 TOTAL TOWN OF T- l T- 4 T- 7 T- 5 T- 3 T- 2 T- OT- 22 ESTES PARK 0- 6 0 - 25 0 - 23 0 - 24 0 - 24 0 - 21 0 - 6 0 - 129 P- 5 P - 10 P - 14 P - 12 P - 12 P - 13 P - 5 P- 71 ALL OTHER T - 30 T - 26 T - 44 T - 23 T - 29 T - 15 T - 13 T - 180 BUSINESSES TOTAL T - 31 T - 30 T - 51 T - 28 T - 32 T - 17 T - 13 T - 202 0- 60-250-230-240-240-210- 60- 129 P- 5 P - 10 P - 14 P - 12 P - 12 P - 13 P - 5 P- 71 R 4-1 CO»3 TOWN OF ESTES PARK PARK & RIDE STATISTICS JULY 26 - AUGUST 1 1992 T - TROLLEY 0 - OTHER P - PARKED AT WORK SMTWTFS 07/26 07/27 07/28 07/29 07/30 07/31 08/01 TOTAL TOWN OF T- 3 T- 3 T- 4 T- 3 T- 4 T- 3 T- l T- 21 ESTES PARK 0- 6 0 - 26 0 - 24 0 - 26 0 - 22 0 - 20 0 - 7 0 - 131 P- 5 P- 9 P - 16 P - 11 P - 17 P - 13 P - 4 P - 75 ALL OTHER T - 17 T - 27 T - 27 T - 25 T - 28 T - 18 T - 23 T - 165 BUSINESSES TOTAL T - 20 T - 30 T - 31 T - 28 T - 32 T - 21 T - 24 T - 186 0- 6 0 - 26 0 - 24 0 - 26 0 - 22 0 - 20 0 - 70- 131 P- 5 P- 9 P - 16 P - 11 P - 17 P - 13 P - 4 P - 75 R 4-2 ' . TOWN OF ESTES PARK PARK & RIDE STATISTICS August 2 - August 8 1992 T - TROLLEY 0 - 0'1'11IER P - PARKED AT WORK SMTWTFS 08/02 08/03 08/04 08/05 08/06 08/07 08/08 TOTAL TOWN OF T- l T- 3 T- 3 T- 2 T- 2 T- OT- l T- 12 ESTES PARK 0- 70-280-270- 2.2 0-230-210- 70- 135 P- 5 P - 11 P - 13 P - 13 P - 16 P - 18 P - 7 P- 83 ALL OTHER T - 16 T - 29 T - 35 T - 29 T - 27 T - 26 T - 19 T - 181 BUSINESSES TOTAL T - 17 T - 32 T - 38 T - 31 T - 29 T - 26 T - 20 T - 193 0- 7 0 - 28 0 - 27 0 - 22 0 - 23 0 - 21 0 - 7 0 - 135 P- 5 P - 11 P - 13 P - 13 P - 16 P - 18 P - 7 P- 83 R 4-3 TOWN OF ESTES PARK PARK & RIDE STATISTICS August 9 - August 15 1992 - TROLLEY - OTHER - PARKED AT WORK SMTWTFS 08/09 08/10 08/11 08/12 08/13 08/14 08/15 TOTAL TOWN OF T- l T- l T- 2 T- 2 T- 2 T- 2 T- 1 T - 11 ESTES PARK 0- 30-210-190-170-210-190- 50- 105 P- 5 P - 12 P - 16 P - 19 P - 15 P - 13 P - 6 P- 86 ALL OTHER T - 24 T - 31 T - 30 T - 28 T - 26 T - 22 T - 21 T - 182 BUSINESSES TOTAL T - 25 T - 32 T - 32 T - 30 T - 28 T - 24 T - 22 T - 193 0- 3 0 - 21 0 - 19 0 - 17 0 - 21 0 - 19 0 - 50- 105 P- 5 P - 12 P - 16 P - 19 P - 15 P - 13 P - 6 P- 86 f R 4-4 4 f '. ..., TOWN OF ESTES PARK PARK & RIDE STATISTICS August 9 - August 15 1992 - TROLLEY - OTHER - PARKED AT WORK SMTWTFS 08/09 08/10 08/11 08/12 08/13 08/14 08/15 TOTAL TOWN OF T- l T- l T- 2 T- 2 T- 2 T- 2 T- l T- 11 ESTES PARK 0- 3 0 - 21 0 - 19 0 - 17 0 - 21 0 - 19 0 - 50- 105 P- 5 P - 12 P - 16 P - 19 P - 15 P - 13 P - 6 P- 86 ALL OTHER T - 24 T - 31 T - 30 T - 28 T - 26 T - 22 T - 21 T - 182 BUSINESSES TOTAL T - 25 T - 32 T - 32 T - 30 T - 28 T - 24 T - 22 T - 193 0- 3 0 - 21 0 - 19 0 - 17 0 - 21 0 - 19 0 - 50- 105 P- 5 P - 12 P - 16 P - 19 P - 15 P - 13 P - 6 P- 86 R 4-5 v C »3 TOWN OF ESTES PARK PARK & RIDE STATISTICS August 16 - August 22 1992 T - TROLLEY O - OTHER P - PARKED AT WORK SMTWTFS 08/16 08/17 08/18 08/19 08/20 08/21 08/22 TOTAL TOWN OF T- l T- l T- 3 T- 3 T- l T- OT- l T- 10 ESTES PARK 0- 3 0 - 20 0 - 21 0 - 20 0 - 17 0 - 17 0 - 4 0 - 102 P- 4 P - 15 P - 11 P - 13 P - 19 P - 15 P - 6 P- 83 ALL OTHER T - 22 T - 19 T - 17 T - 25 T - 17 T - 17 T - 17 T - 134 BUSINESSES TOTAL T - 23 T - 20 T - 20 T - 28 T - 18 T - 17 T - 18 T - 144 0- 3 0 - 20 0 - 21 0 - 20 0 - 17 0 - 17 0 - 4 0 - 102 P- 4 P - 15 P - 11 P - 13 P - 19 P - 15 P - 6 P- 83 R 4-5