Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PACKET Community Development Committee 2002-12-05
COMM . 111 V. AGENDA PACELTS - 2001 - 2002 -4.'ll..... Al...~al..........m d...lit I . }m... .94 1 1 1, 5 ( t AGENDA Town of Estes Park Community Development Committee Thursday, December 5,2002 8:00 a.m. *Revised: December 3,2002 1. Museum A. Museum Mission Statement B. Bi-Monthly Report 2. Senior Center A. Bi-Monthly Report 3. Community Development A. Habitat for Humanity request for waiver of building permiUplan check fees. *B. Outdoor display discussion - a look at examples from other communities. (Postponed to January 2,2003). C. Policy on issuance of CO's for single-family homes. Prepared December 2,2002 The Community Development Committee reserves the right to consider other appropriate items not available at the time the Agenda was prepared. MEMORANDUM To: Community Development Committee From: Betty Kilsdonk Re: Bi-Monthly report Date: December 5,2002 Exhibits A Light-Hearted History of Tourism closed November 17. As I reported at the last meeting, we have been collecting customer feedback data since the exhibit opened in May. Attached is a report on the results from 124 visitor surveys. The next exhibit in the NPS building will be Mountain Air: Works from the Artist- in-Residence Program at Rocky Mountain National Park. A reception sponsored by the Estes Park Auto Mall will be held Friday, December 13 from 5 to 7 PM. The exhibit will be on display through April 6,2003. Upcoming 2003 Programs for January and February 2003 Jan. 11 Old Timers Series: YMCA. 1 Pm in the Muni. Bldg. Board Rom Jan. 19 Free Day Feb. 2 What is the Artist-In Residence Program? Senior Center, 2 PM. Feb. 15 Old Timers Series: Fine Arts Guild. 1 PM in the Muni. Bldg. Bd. Rm. Feb. 23 Free Day: Last Day of Preserving Our Past: The Birch Cabin and the Knoll 2003 Exhibits Mountain Air: Works from the RMNP Artist-in-Residence Program through April 6,2003 (NPS bldg) Estes Park Woman's Club March 3, 2003-July 31, 2003 (main gallery) American Roads, traveling exhibit from the CU Art Gallery May 31, 2003-August 31, 2003 (NPS bldg) History of Estes Park Schools August 31, 2003-January 2004 (main gallery) Who Needs Water? September 15, 2003-February 28, 2004 (NPS building). . "A Light-Hearted History of Tourism" Exhibit CUSTOMER OPINION CARDS 124 museum visitors completed the cards. Exhibit ran from May 10 to November 17, 2002. - Poor Excellent One Two Three Four Five INFORMATION 1 0 11 21 83 USE OF OBJECTS 3 2 7 19 84 ACTIVITIES 3 3 6 32 67 PHOTOGRAPHS 3 1 5 25 83 OVERALL 2 2 5 25 90 COMMENTS/SUGGESTIONS: • Especially liked the old home movies of the people, park and town • Loved the interactive dress up • I liked the activities in the kids' place • Thanks 4 keeping the past alive for us! • It was fun to [p.lut the clothes on, is fun, The Cherrys • I thought it was really cool & fun! Haley Davis (Wilm. NC) • To[0] much noise. It's depressing. It smelled good (from a child). • This exhibit was great! - 6 • Good • We really enjoyed learning about Estes Park • Great for own "interaction" with obj ects, sense of"time" • I think more old photos would be nice, obtaining them through the Internet, & old newspapers & folks from their collection of images from the past would be great! Request from the townspeople to seek and find old photos in their attics etc. with luck a story behind the photos will come with them. This idea worked with the Kentucky Explorer magazine.com. Thanks, Keith H. Anderson, Durham NC • Video was neat! • Outstanding! • Thank you! - 2 • Excellent! • It was fun • It was cool ! • The exhibit is nice, a great deal of info in a small space - but the paint smell is still strong. • Poor lighting on exhibits needs to be fixed in the main museum. • Wonderful ! • Please add examples of feces so we can tell which animals have been on trails. • Always hunger for more, more, more... • Nice job • Very impressed with children's involvement and being able to wander without interference. Great job ! • Put better signage in the windows to encourage your visits, "Yes, we're open" • The video was grand • We loved the antique clothes ! • Never tire of seeing what new exhibits are displayed - really enjoyed [it] my 4-year old loved the dress up area! • I loved it - give us more! • Awesome! Even for us "older" kids! • Enjoyed videos/photos • Keep up the good work • So nice to see an exhibit on tourism on the physical & conceptual size - it works very well! • Great for kids ! Thanks ! • Add the t-shirt from Estes Park paramedics - feed the bears, climb the rocks... • We're adults and had a ball trying on the clothes. Loved the video. • A really great exhibit & museum! • Loved the video ! • Could have more oral stories to listen to - not read • Very nice • Fun, kids loved the old clothes • Pretty cool ! • Coolness! • Really neat that you have hands on area for children. Even though we are grandparents, we appreciate [it] • I really liked the cloths (sic) • The exhibits were fun & really good! • Great exhibit for both children & adults ! • My daughter really enjoyed the children activities. • Great - should be kept permanent! Loved the kids corner - I could concentrate on exhibit • This is a very good place for information • Enjoyed hearing "Casey" again. • A lot of fun! • Loved the hands on exhibits! ! • This is wonderful! Thanks so much! Judy Hilton Box 450 Conifer CO 80433 Museum/Senior Center Services Department Memo To: Honorable Mayor Baudek Board of Trustees Town Administrator Widmer From: Betty Kilsdonk Date: December 2,2002 Subject: Museum Mission Statement Background. At a joint meeting of the Museum's Advisory and Friends Boards on November 16, 2001, we began a conversation about possible changes to the Museum's mission statement. We discussed the components of an effective mission statement: to state what the organization tries to accomplish in a broad sense, to provide a motivating inspiration, and to be brief. We reviewed mission statements from several other museums, noting that the Longmont and Loveland museums had had mission statements similar to ours, but had broadened their statements to include art and science. During that meeting, and at two subsequent joint meetings, on January 26, 2002 and February 8, 2002, we discussed what we would like the mission statement to look like. Among the comments were the following: Some current exhibits include art and photography, areas that aren't included in our mission statement. Also, the Museum in the past has turned down interesting exhibits because they didn't fit the mission statement, such as baseball history, death in the Victorian era, cowboy poetry, and science-oriented traveling exhibits. The question was raised as to how a mission statement change would impact what the Museum collects and preserves. The Longmont Museum's curator of collections suggested that the statement read that we will exhibit traveling art and science exhibits, and hold art and science programs, but not necessarily collect art and science or be expected to produce our own art and science exhibits. This made sense to us in consideration of our limited staff size, storage areas and funding. A draft mission statement, arrived at by both groups, was sent to the Advisory Board for their review on October 7,2002, for recommendation to the Town Board. Here is the current Estes Park Area Historical Museum Mission Statement, adopted in 1995. The Estes Park Area Historical Museum operates for the purpose of collecting, preserving, interpreting and exhibiting local history for our residents and visitors. Here is the proposed Estes Park Area Historical Museum Mission Statement, as recommended by the Museum Advisory Board. . The Estes Park Area Historical Museum collects, interprets and preserves local history, as well as presenting exhibits, programs and events, for the education and benefit of residents and visitors of all ages. Budget. None. Action. Staff requests consideration of the revised museum mission statement for adoption by the Town Board. • Page 2 M 1 ON 9 Vt P - ·,71'·' ~·'· ~2•3'0!'0*'11 (,'·~AND'~-'~- '~ f„- 44 >, 60) 49 ON 1- U) 20 00 9 22 O of (no - 0 7 U) .1 i ~ P'tr#Le n·, :4..1/Al,1£§1:202·2,¢«Wasqgam »0 .... i 11 h. Al*'8*71,4:..,:·. 4,50,0:Re?J*~kee»~~mt/499 U. p VI E .¤ .3 0 0) 4 .g£ u. 9, U. 10 0 N. I O 10 O 10 0 N 64 -25»,>·'A: 769/z...........,I.........../... » 00 10 0 11 1 0 (V 146> MI '*41~ 2 A- S: 9 0 2 24 ,+1.3.44,4.-A.. U. 90 - (0 21 .. R &.:4...2/3(~f'*24:-920.tr#fi''t.4~1 IJL' 98 - » - » 00 u. P lilli Estes Park Area Historical Museum Month of October, 1998 YTD = lapsed Attendance & 94: 9 9290 October 2002 attendance = 728 LO, 00, 66. Z099 11721 N a P 0 „: 0 0 = m M - O 22 9 - a Z' .-0 83 2 rt a 0 C L i.. 5 -9, 0 - 89: 2 M 0 11 91 UL .- .f 4- .© 0 %9 0 - 1 2 CO .0 - N 0 -2, OE M . %0 0 4- CO 0 ic C a, M 2 0 = 1,1 9 % #4 Q - C (1) (0 0 N 11~ex NI- 9' 071 3 O 2 0 N CO 0 \ 9 \ r,/ 0 0, 1 '' J - J 00- ar 0 6 2 P .1 N O 2 E K 16 Z WN 00-LL= LU i i z 32 oraine Park-30, Englewood Senior droplant tours-42, Estes Park Area Historical Museu nnual me 74, Laramie Senior Center ween Hullabaloo-150 Th %10. visitor origin ( a . EM ON 0 to I 64 0 paski:.-ASK/4 7.j®Z * P 0 0 6 , 0 E f6 00 O 8= .-29 - 0 0 2 -J 4-4m-- ----m=<-*pa-**** u- 9 »0 - - » CD - N 10 O 44 R„ 1..~-~ LLC 08 0 UZ 10 11 C> 11 C = 1- ... 0 82 , 1 2 p.-1. .¥-. 7.7, 00 0- C - . , (NO) C ZA - 0 . 7. b· 2: 2,· ,~- c.7.-.,- 7 5*Fcle: ;. ...fl. 1 - lilli 3% of budget it ipsed 9439 $5,599 Estes Park Area Historical Mus mber, 1998-2 11721 $6.771 $5449 $5,899 217~ZZZ November 1 1 1 1% 0 - C -A I--p#/.--.- C - E fo *~ 9 - 0 E 0 - 0, 01 O - Z N 0 W - r<r#. M< j - 00 N ® Zo. 66. 86. rthern Front Range Mus ms at hydroplant-18;CSU ~~oog.naemr~d~ude~~~tt~ddcr~~~anen~-f5~~~thouses of Colorado-80;Native American Cratts-20 Estes Park Area Historical M %ZZ EPAHM Nov. 602 attendance by visitor origin (gallery only) usle'o:1 10 *no MEMORANDUM TO: Community Development Committee From: Jody Thompson Re: Bi-Monthly Report Date: December 5,2002 Board Activity The Board is actively soliciting candidates to serve on the Board in 2003. There are two openings for expiring terms. The 2003 annual meeting will be held at the Senior Center on January 7 at which time ballots will be cast for the new slate of officers and Board members. Board Project for 2003 Becomes 2002 The Board decided they wanted the modification of entrance doors to automatic- opening doors done as quickly as possible. This was due to the acknowledged difficulty in entering the facility with oxygen or wheelchairs in winter with cold, high winds. Therefore, work will be completed by Tuesday, December 10, when the doors will be operational. Senior Center, Inc. has provided the funding for the entire project, estimated cost to be about $6,000. Outreach The Director and two Board members will represent the Senior Center at an informal meeting in the Pine Knoll club house on December 11. SHARE Food Distribution, Salvation Army, and Special Transit representatives will also participate. Literature from all agencies will be available, as well as the Larimer County 2002-2003 Services Guide for older adults. Focus will be on the services and programs with sliding scale eligibility, emphasizing complete privacy and confidentiality. Thanksgiving Feast This meal was provided on November 26 and was enjoyed by 94 guests. The home-schooled students and parents again provided the setup, serving, and cleanup which allows everyone to sit back and enjoy the fellowship and food in a leisurely manner. Donations of $6 per meal allow the Seniors to receive $2 per meal as a fund raiser. Randy Repola again graciously agreed to be the auctioneer for the pie auction. Besides providing some fun and good pies for the guests, his efforts resulted in $170 for Senior Center, Inc. Upcoming Activities/Programs Christmas Feast on December 20 Eagle Rock School Choir Handbell Ensemble Starting Monthly Bingo Square Dancing Meals Congregate Meals on Wheels Total October, 2001 643 247 890 October, 2002 565 248 813 November, 2001 663 221 884 November, 2002 585 250 835 . .. MEMORANDUM To: Community Development Committee From: Bob Joseph, Director Date: 12-3-02 Subject: Request for waiver of building permit fees Background: Consistent with the adopted policy of the Town Board, the committee will hear the request ofHabitat for waiver ofthis fee. Prior to establishing this policy fees have been waived for this development. Recommendation: Approval of the request to waive building permit plan review fees. . MEMORANDUM To: Community Development Committee From: Bob Joseph, Director Date: 12-3-02 Subject: Certificates of Occupancy for Single Family Homes Background: The past practice ofthe Town has been to issue temporary CO's, when basic life safety concerns have been met. This has often resulted in unattended loose ends. Staff has been working on a policy, and new form of certificate, to better address the process of final completion of all required improvements after taking occupancy. Recommendation: Will Birchfield will make a brief presentation to outline the basic policy considerations. 6 R109.1.2 - R110.5 ADMINISTRATION prior to the placing of concrete. The foundation inspection and shall either indicate the portion of the construction that is shall include excavations forthickened slabs intended forthe satis factory as completed, orshall noti fy the permitholderoran support of bearing walls, partitions, structural supports, or agent of the permit holder wherein the same fails to comply equipment and special requirements for wood foundations. with this code. Any portions that do not comply shall be cor- rected and such portion shall not be covered or concealed until R109.1.2 Plumbing, mechanical, gas and electrical sys- authorized by the building official. tems inspection. Rough inspection of plumbing, mechani- cal, gas and electrical systems shall be made prior to cover- ing or concealment, before fixtures or appliances are set or installed, and prior to framing inspection. SECTION Rll0 CERTIFICATE OF OCCUPANCY Exception: Ground-source heat pump loop systems tested in accordance with Section M2105.1 shall be per- R110.1 Use and occupancy.No 66ilding or structure shall be, mitted to be backfilled prior to inspection. ,,used oroaipiedaritiffoehange in theexisting occupancy clas- / 7sification of a building or structure or portion thereof shall be R109.1.3 Floodplain inspections. For construction per- ' made until the building official has issued a certificate ofoccu- mitted in areas prone to flooding as established by Table £bancy therefor as provided herein. Issuance of a certificate of R301.2(1), upon placement of the lowest floor, including occupailcy shall not be construed as an approval of a violation basement, and prior to further vertical construction, the of the provisions of this code or of other ordinances of thejuliL building official shall require submission of a certification, diction. CERificates preliinlii€ to giGE authority to violate or / - prepared by a registered professional engineer or land sur- gancel the provisions of this code or othg ordinances of the veyor, of the elevation of the lowest floor, including base- rjurisdiction *all not be valid. ment, required in Section R327. R110.2 Change in use. Changes in the character or use of an R109.1.4 Frame and masonry inspection. Inspection of existing structure shall not be made except as specified in Sec- framing and masonry construction shall be made after the tions 3405 and 3406 of the International Building Code. roof, masonry, all framing, firestopping, draftstopping and R110.3 Certificate issued. After the building official inspects bracing are in place and after the plumbing, mechanical and the building or structure and finds no violations of the provi- electrical rough inspections are approved. sions of this code or other laws that are enforced by the depart- R109.1.5 Other inspections. In addition to the called ment of building safety, the building official shall issue acertif- inspections above, the building department may make or icate of occupancy which shall contain the following: require any other inspections to ascertain compliance with 1. The building permit number. this code and other laws enforced by the building depart- 2. The address of the structure. ment. 3. The name and address of the owner. R109.1.5.1 Fire-resistance-rated construction inspec- 4. A description of that portion of the structure for which the tion. Where fire-resistance-rated construction is required certificate is issued. between dwelling units or due to location on property, the 5. A statement that the described portion of the structure has building official shall require an inspection of such been inspected for compliance with the requirements of construction after alliathing and/or wallboard is in place, this code. but before any plaster is applied, or before wallboard 6. The name of the building official. joints and fasteners are taped and finished. 7. Theeditionofthecodeunderwhichthepermitwasissued. R109.1.6 Final inspection. Final inspection shall be made 8. If an automatic sprinkler system is provided. after the permitted work is complete and prior to occupancy. 9. Any special stipulations and conditions of the building permit. R109.2 Inspection agencies. The building official is autho- - _ rized to accept reports of approved agencies, provided such ~110.4 Temporary occupancy. the building official is autho- agencies satisfy the requirements as to qualifications and reli- rized to issue a temporary certificate of occupancy before the ability. completion of the entire work covered by the permit, provided that such portion or portions shall be occupied safely. The R109.3 Inspection requests. It shall be the duty of the person building official shall seta time period during which the tempo- doing the work authorized by apermit to notify the building of- rary certificate of occupancy is valid. ficial that such work is ready for inspection. It shall be the duty of the person requesting any inspections required by this code R110.5 Revocation. The building official shall, in writing, sus- to provide access to and means for inspection of such work pend or revoke a certificate of occupancy issued under the pro- visions of this code wherever the certificate is issued in error, or R109.4 Approval required. Work shall not be done beyond on the basis of incorrect information supplied, or where it is the point indicated in each successive inspection without first determined that the building or structure or portion thereof is in obtaining the approval of the building official.The building of- violation of any ordinance or regulation or any of the provi- ficial upon notification, shall make the requested inspections sions of this code. 6 2000 INTERNATIONAL RESIDENTIAL CODE™ ADMINISTRATION 110 - 112.2 holder or an agent of the permit holder wherein the same fails building official shall set a time period during which the tem- to comply with this code. Any portions that do not comply porary certificate of occupancy is valid. shall be corrected and such portion shall not be covered or concealed until authorized by the building official. 110.5 Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or com- SECTION 110 pletion issued under the provisions of this code wherever the CERTIFICATE OF OCCUPANCY certificate is issued in error, or on the basis of incorrect infor- mation supplied, or where it is determined that the building 110.1 Use and occupancy. No building or structure shall be or structure or portion thereof is in violation of any ordinance used or occupied, and no change in the existing occupancy or regulation or any of the provisions of this code. classification of a building or structure or portion thereof shall be made until the building official has issued a certifi- SECTION 111 cate of occupancy therefor as provided herein. Issuance of a SERVICE UTILITIES certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordi- 111.1 Connection of service utilities. No person shall make nances of the jurisdiction. connections from a utility, source of energy, fuel or power to any building or system that is regulated by this code for which 110.2 Change in use. Changes in the character or use of an a permit is required, until released by the building official. existing structure shall not be made except as specified in Chapter 34. 111.2 Temporary connection. The building official shall have the authority to authorize the temporary connection of 110.3 Certificate issued. After the building official inspects the building or system to the utility source of energy, fuel or the building or structure and finds no violations of the provi- power. sions_of this_code or_ether laws that are enforced by the department of building safety, the building official shall issue 1113 Authority to disconnect service utilities. The building a certificate of occupancy that shall contain the following: official shall have the authority to authorize disconnection of utility service to the building. structure or system regulated 1. The building permit number. by this code and the codes referenced in case of emergency where necessary to eliminate an immediate hazard to life or 2. The address of the structure. property. The building official shall notify the serving utility, 3. The name and address of the owner. and wherever possible the owner and occupant of the build- 4. A description of that portion of the structure for ing, structure or service system of the decision to disconnect which the certificate is issued. prior to taking such action. If not notified prior to discon- 5. A statement that the described portion of the struc- necting, the owner or occupant of the building, structure or ture has been inspected for compliance with the service system shall be notified in writing, as soon as practi- requirements of this code for the occupancy and cal thereafter. division of occupancy and the use for which the pro- posed occupancy is classified. SECTION 112 BOARD OF APPEALS 6 The name of the building official. 7. The edition of the code under which the permit was 112.1 General. In order to hear and decide appeals of orders, issued. decisions or determinations made by the building official rel- 8. The use and occupancy, in accordance with the pro- ative to the application and interpretation of this code, there visions of Chapter 3. shall be and is hereby created a board of appeals. The board 9. The type of construction as defined in Chapter 6. of appeals shall be appointed by the governing body and shall hold office at its pleasure. The board shall adopt rules of pro- 10. The design occupant load. cedure for conducting its business. 11. If an automatic sprinkler system is provided, whether the sprinkler system is required. 112.2 Limitations on authority. An application for appeal 12. Any special stipulations and conditions of the build- shall be based on a claim that the true intent of this code or ing permit. the rules legally adopted thereunder have been incorrectly 110.4 Temporary occupancy. The building official is autho- interpreted, the provisions of this code do not fully apply, or rized to issue a temporary certificate of occupancy before the an equally good or better form of construction is proposed. completion of the entire work covered by the permit, provid- The board shall have no authority to waive requirements of ed that such portion or portions shall be occupied safely. The this code. 2000 INTERNATIONAL BUILDING CODE® 9 108.8-109.6 1997 UNIFORM BUILDING CODE TABLE 1-A reinspection fee in accordance with Table 1-A or as set forth in the 1. The building permit number. fee schedule adopted by the jurisdiction. 2. The address of the building. In instances whbre reinspection fees have been assessed, no 3. The name and address of the owner. additional inspection of the work will be performed until the re- quired fees have been paid. 4. A description of that portion of the building for which the certificate is issued. ' 5. A statement that the described portion of the building has SECTION 109 - CERTIFICATE OF OCCUPANCY been inspected for compliance with the requirements of this code 109.1 Use and Occupancy. No building or structure shall be for the group and division of occupancy and the use for which the proposed occupancy is classified. used or occupied, and no change in the existing occupancy classi- fication of a building or structure or portion thereof shall be made 6. The name of the building official. until the building official has issued a certificate of occupancy therefor as provided herein. 109.4 Temporary Certificate. If the building official finds that no substantial hazard will result from occupancy of any building EXCEFI'ION: Group R, Division 3 and Group U Occupancies. or portion thereof before the same is completed, a temporary cer- Issuance of a certificate of occupancy shall not be construed as tificate of occupancy may be issued for the use of a portion or por- an approval of a violation of the provisions of this code or of other tions of a building or structure prior to the completion of the entire ordinances of the jurisdiction. Certificates presuming to give au- building or structure. thority to violate or cancel the provisions of this code or other ordi- nances of the jurisdiction shall not be valid. 109.5 Posting. The certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed ex- 109.2 Change in Use. Changes in the character or use of a build- cept by the building official. ing shall not be made except as specified in Section 3405 of this .. code. 109.6 Revocation. The building official may, in writing, sus- pend or revoke a certificate of occupancy issued under the provi- 109.3 Certificate Issued. After the building official inspects the sions of this code whenever the certificate is issued in error, or on building or structure and finds no violations of the provisions of the basis of incorrect information supplied, or when it is deter- this code or other laws that are enforced by the code enforcement mined that the building or structure or portion thereof is in viola- agency, the building official shall issue a certificate of occupancy tion of any ordinance or regulation or any of the provisions of this that shall contain the following: code. TABLE 1-A-BUILDING PERMIT FEES TOTAL VALUATION FEE S 1.00 to $500.00 $23.50 S501.00 to S2,000.00 S23.50 for the first $500.00 plus $3.05 for each additional S 100.00, or fraction thereof, to and including $2,000.00 S2,001.00 to S25,000.00 $69.25 for the first $2.000.00 plus S 14.00 for each additional S 1,000.00, or fraction thereo f, to and including $25,000.00 $25,001.00 to $50,000.00 $391.25 for the first $25,000.00 plus $10.10 for each additional S 1,000.00, or fraction thereof, to and including $50,000.00 S50,001.00 to S 100,000.00 $643.75 for the first $50,000.00 plus $7.00 for each additional S 1,000.00, or fraction thereof, to and including $100,000.00 S 100,001.00 to $500,000.00 $993.75 for the first S 100,000.00 plus S5.60 for each additional S 1,000.00, or fraction thereof, to and including $500,000.00 S500,001.00 to $1,000,000.00 $3,233.75 for the first S500,000.00 plus S4.75 for each additional S 1,000.00, or fraction thereof, to and including $1,000,000.00 S 1,000,001.00 and up 55,608.75 for the first S 1,000,000.00 plus $3.15 for each additional S 1,000.00, or fraction thereof Other Inspections and Fees: 1. Inspections outside of normal business hours 547.00 per hour' (minimum charge-two hours) 2. Reinspection fees assessed under provisions of Section 305.8 ........ 547.00 per hour' 3. Inspections for which no fee is specifically indicated .......................... ...................... ·· ······ 547.00 per hourl (minimum charge-one-half hour) 4. Additional plan review required by changes, additions or revisions to plans.......................... ······ ........ S.17.00 per hour' (minimum charge-one-half hour) Actual costsi 5. For use of outside consultants for plan checking and inspections, or both.......... 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead. equipment, hourly wages and fringe benefits of the employees involved. ]Actual costs include administrative and overhead costs. 1-6 TEMPORARY CERTIFICATE OF OCCUPANCY .RkE@2¢]E5. Address Building Permit Number The work approved by Building Permit Number has not been totally completed. However, applicable life-safety requirements comply with Municipal codes. Therefore, to allow owners the most possible use of their property, a Temporary Certificate o f Occupancy is being issued. HoweverFitirthE responsibility of the permittee and the property owner to complete all , -requiremen-ts associated with the permitted development, in a manner complying with all Municifial Laws. No changes from the approved site and construction plans are authorized, without prior approval o f the Building Official. The permittee and the owner must read and agree to the previous conditions and the following corrections, prior to issuance o f a Temporary Certificate of Occupancy. 1. This Temporary Certificate of Occupancy expires 2. 3. 4. 5. Permittee I)ate Owner I)ate Building Official I)ate 6,"* 5. 34 1/1 L . 4».41 \01 . 4