Loading...
HomeMy WebLinkAboutPACKET Estes Park Planning Commission 2023-11-21 This meeting will be streamed live and available on the Town YouTube page at www.estes.org/videos ADVANCED PUBLIC COMMENT By Public Comment Form: Members of the public may provide written public comment on a specific agenda item by completing the Public Comment form found at https://dms.estes.org/forms/EPPCPublicComment. The form must be submitted by 10:00 a.m., the meeting day. All comments will be provided to the Commission for consideration during the agenda item and added to the final packet. __________________________________________________________________________ AGENDA PLANNING COMMISSION – TOWN OF ESTES PARK Tuesday, November 21, 2023 1:30 p.m. AGENDA APPROVAL INTRODUCTIONS AND ANNOUNCEMENTS PUBLIC COMMENT items not on the agenda (Please state your name and address). CONSENT AGENDA 1. Planning Commission Minutes dated October 17, 2023 ACTION ITEMS 1. Preliminary Plat Habitat on Raven Planner Washam Review of a Preliminary Plat for a proposed five-lot subdivision on 0.82 acres. Continued from the October 17, 2023 meeting. 2. Amended Development Plan Max Storage Planner Washam Minor Modification to an approved Development Plan, substituting shrubs in place of trees. Continued from the October 17, 2023 meeting. DISCUSSION ITEMS: ADJOURN The Town of Estes Park will make reasonable accommodations for access to Town services, programs, and activities and special communication arrangements for persons with disabilities. Please call (970) 577-4777. TDD available. November 14, 2023 Page 1 Page 2 Town of Estes Park, Larimer County, Colorado, October 17, 2023 Minutes of a Regular meeting of the ESTES PARK PLANNING COMMISSION of the Town of Estes Park, Larimer County, Colorado. Meeting held in said Town of Estes Park on the 17 day of October 2023. Commission: Attending: Chair Matt Comstock, Vice-Chair Matthew Heiser, Charles Cooper, Chris Pawson, David Shirk Chair Comstock, Vice-Chair Heiser, Commissioners Cooper, Shirk, Pawson, Interim Community Development Director Jason Damweber, Planner I Kara Washam, Senior Planner Paul Hornbeck, Recording Secretary Karin Swanlund, Town Attorney Dan Kramer, Town Board Liaison Barbara MacAlpine Absent: none (Shirk arrived at 1:35 p.m.) Chair Comstock called the meeting to order at 1:30 p.m. There were 14 people in attendance. AGENDA APPROVAL It was moved and seconded (Heiser/Cooper) to approve the agenda. The motion passed 3-0-1, with Pawson abstaining and Shirk not yet in attendance. PUBLIC COMMENT: Kristine Poppitz, 650 Devon Drive, thanked Staff for the meet and greet held at the Community Center on the 16th. INTRODUCTIONS AND ANNOUNCEMENTS New Commissioner Charles Cooper and new Senior Planner Paul Hornbeck were introduced. CONSENT AGENDA APPROVAL It was moved and seconded (Heiser/Shirk) to approve the consent agenda. The motion passed 3-0, with Cooper and Pawson abstaining. ACTION ITEMS 1.Amended Development Plan Max Storage Planner Washam DJMC LLC, Owner/Applicant The Applicant has requested a minor modification to the landscape plan of the approved development plan. The plan proposed planting eight (8) trees along Acacia Drive. With the proximity of an existing sewer easement and insurance requirements for trees to be a minimum of ten (10) feet from the structure, the Applicant cannot install trees in this location. The Applicant proposes shrubs in place of trees in this location, at a ratio of three (3) shrubs to one (1) tree for a total of twenty-four (24) additional shrubs along Acacia Drive. DISCUSSION: Jes Reetz, Cornerstone Engineering, stated that insurance requirements brought on this amendment. The shrubs from the original plan are in place, but he can't install the trees in this location due to sewer easement requirements (10 feet required vs 5 feet available space). Trees were not a requirement for street buffering in the original Development Plan. The number of trees was required, but their specific placement was not. The overall intent should be met. Discussion on obtaining a Certificate of Occupancy (CO) was had. It was understood that once this amendment was submitted, the owner could receive the CO and start doing business. The Improvement guarantee for public improvements has been met. Leftover funds from that will be rolled into a Landscape Guarantee. dra f t Page 3 PUBLIC COMMENT: Mike Copp, 1940 Baldpate Court, stated that wildlife no longer migrates through this property. The structure has eight large street lights and suggested cutting that number in half and installing motion sensors. Other storage facilities use LED lights, and the Water Department uses only three lights. The lighting is affecting property owners two blocks away on Scott Avenue. He handed out photos of the property at night. Vice Chair Heiser confirmed that lighting was a part of the landscape plan requirements. Planner Washam stated that if there is a problem with lighting, it would be a Code Enforcement issue. Commissioner Shirk noted that, per code, "if installed, all exterior lighting shall meet the functional security needs of the proposed land use without affecting adjacent properties or the community." He requested the Applicant return with a specific landscape plan and lighting standards, suggesting finding a new location for trees. It was moved and seconded (Pawson/Shirk) to continue the amended MAX Storage Development Plan to the next regularly scheduled meeting, finding that a revised landscaping plan describing the replacement shrub type and location, and more information on how the landscaping will provide adequate screening of lighting be submitted. The motion passed 5-0. 2. Location and Extent Review 360 Community Drive Planner Washam Estes Valley Recreation and Park Department (EVRPD), Applicant. Planner Washam reviewed the staff report. The EVRPD proposes a new "all wheels" concrete/shotcrete skate park at Stanley Park. The skate park will be approximately 10,500 square feet in size. Public facilities and utilities will not be impacted. Lighting or power to the skate park is not being proposed, as the intention is a dawn-to-dusk operation. PUBLIC COMMENT: none DISCUSSION: Vice Chair Heiser suggested the Planning Commission could approve a Master Plan for Stanley Park to alleviate future individual Location & Extent hearings for the Park. It was moved and seconded (Shirk/Pawson) to approve the Location and Extent Review application, according to findings recommended by Staff. The motion passed 5-0. 3. Rezone TBD Raven Avenue Planner Washam Habitat for Humanity of the St. Vrain Valley, Inc., Owner/Applicant The Applicant proposes rezoning the 0.82-acre parcel from RM (Multi-family Residential) to R-1 (Single-Family Residential), with a minimum lot size of 5,000 square feet, to create five (5) lots. The two western lots, Lots 1 and 2, will have access by a single point from Raven Avenue, with Lots 3, 4 and 5 having individual access directly from Raven Avenue. Heiser disclosed that between 1999-2015 he was on the Board of the local Habitat for Humanity but had no financial or prior interest in this. PUBLIC COMMENT: Scott Moulton, Executive Director of the Housing Authority, expressed support and the need for the project. dra f t Page 4 DISCUSSION: David Emerson, Habitat for Humanity Director, stated that he has worked on this since 2019. Habitat does not want condo/stacked uses, hence the reason for the rezoning request. Medical and Education are the primary industries served by Habitat. He explained that Habitat clearly intended to develop this lot and that the landowners had been purposely working with them since the start in 2011. The Deed Restriction review is unnecessary during this hearing, per Town Attorney Kramer. There is no requirement for a Development Plan in single-family developments; the Preliminary Subdivision Plat provides the documentation needed. Chair Comstock suggested expediting a Code Amendment that addresses "changes in conditions in the areas affected" as this wording is too vague. Shirk noted that his subdivision was created in 2020, thus creating a change in conditions. Considerable conversation on interpreting the Development Code and Comprehensive Plan, where mistakes were made, and the history of the lot was had. Shirk recommended denying the zoning request because the town board approved a multi-family zoned lot on this location three years ago. He later withdrew the motion. Shirk questioned why townhouses weren't considered. That would maintain the multi- family zoning, allow the Applicant to use the property as they want and is in alignment with the Comprehensive Plan, giving a different product without rezoning. Pawson concurred. Emerson explained that they were told the minimum lot size would still be an issue, or they would have pursued that path. It was moved and seconded (Heiser/Cooper) to forward a recommendation of approval to the Town Board of Trustees of the Zoning Map Amendment application to rezone the 0.82-acre parcel from RM to R-1, according to findings of fact recommended by Staff. We find that the conditions of 3.3.d have been met and are compatible with the Comprehensive Plan and existing growth patterns in the Estes Valley. The motion passed 3-2, with Shirk and Pawson voting against. A five-minute break was taken at 3:20 p.m. Commissioner Pawson had prior commitments and excused himself from the meeting. 4. Preliminary Plat TBD Raven Avenue Planner Washam Habitat for Humanity of the St. Vrain Valley, Inc., Owner/Applicant Habitat for Humanity plans to develop the five proposed lots with single-family residences in the R-1 zone, a use-by-right. The subdivision application is contingent on approval of the proposed rezoning application, known as Raven Subdivision Rezoning. Habitat for Humanity will construct the dwellings and sell the homes to individual, qualified buyers. §4.3.D.4 of the Estes Park Development Code (EPDC) states, "All developments in the R-1 District shall be subject to the attainable housing limitations for rental and owner occupancy outlined in §11.4.C." A Deed Restriction or Restrictive Covenant and Agreement is required per §11.4.E.4. PUBLIC COMMENT: Ken Davis, 1776 Olympian Lane Unit B, supports the project. It provides needed workforce housing and is compatible with the other houses across the street. dra f t Page 5 John Fridrich, 1776 Olympian Lane Unit D, commented that, concerning the willow removal, there are drawbacks to any development. He supports the project and won't miss the willows if they must be removed. DISCUSSION: The willows are not in a wetlands area. Shirk recommended preserving the willows by incorporating them into the open space and would like to see what vegetation is being removed. Per Daniel Barrett, Van Horn Engineering, regrading will occur for drainage to flow into the detention pond, which may affect the willows. Shirk requested more consideration for conservation and possible movement of the swale, so it isn't impacting the willows, starting with the stormwater design. Emerson stated that there aren't many options due to drainage, existing conditions and landscaping near a house. The plan is for the Housing Authority to take responsibility for the open space on Lot 5. This is simpler than having five owners governing an out-lot. There is still more to be worked through with the Conservation Easement before this goes before the Town Board, per Attorney Kramer. Heiser stated that the findings for a continuance would not change the conditions or what this plan is trying to accomplish. It was moved and seconded (Shirk/Comstock) to continue the recommendation of the Raven Subdivision Preliminary Plat to the next regular meeting. We request more information on 7.2.d, limits of disturbance, Subsection 2, criteria for establishing limits of disturbance, information about the maintenance of a stormwater pond, requirements of appendix B.2.c, submittal requirements for Preliminary Subdivision Plans showing the vegetation on site. The Applicant consented to the continuation. The motion passed 4-0. REPORTS: Interim Director Damweber spoke on where the Town stands with hiring a new Community Development Director. Interviews of four candidates took place on October 16. Town Administrator Machalek will be the final decision maker. There being no further business, Chair Comstock adjourned the meeting at 4:05 p.m. _______________________________ Chair Comstock Karin Swanlund, Recording Secretary dra f t Page 6 Page 7 To: Chair Matt Comstock Estes Park Planning Commission Through: Jason Damweber, Interim Community Development Director From: Kara Washam, Planner I Date: November 21, 2023 Application: Raven Subdivision Preliminary Plat Habitat for Humanity of the St. Vrain Valley, Inc. (Owner/Applicant) Van Horn Engineering and Surveying (Representative) Recommendation: Staff recommends the Estes Park Planning Commission forward a recommendation of approval to the Town Board of Trustees, subject to the findings described in the staff report. Land Use: Comprehensive Plan Designation: (Future Land Use): Mixed Residential Neighborhood Existing Zoning District: R-1 (Single-Family Residential) Site Area: 0.82 Acre PUBLIC HEARING ORDINANCE LAND USE CONTRACT/AGREEMENT RESOLUTION OTHER______________ QUASI-JUDICIAL YES NO Objective: The Applicant requests the Planning Commission review the proposed Raven Subdivision Preliminary Plat to create five (5) lots in an R-1 (Single-Family Residential) Zoning District. Location: The property is legally described as Lot 2A, Ward Minor Subdivision. It is located approximately 300 feet east of the southeast corner of the intersection of Lone Pine Drive and Raven Avenue. Background: The 0.82-acre subject property is undeveloped and was created through the Ward Minor Subdivision in January 2021. The property was previously zoned RM (Multi- Family Residential). The Minor Subdivision was completed in anticipation of further subdividing the property, enabling Habitat for Humanity to develop single-family Page 8 residences on five proposed lots. The rezoning application, known as Raven Subdivision Rezoning, was submitted for concurrent review with this subdivision application and proposed rezoning the 0.82-acre parcel from RM (Multi-Family Residential) to R-1 (Single-Family Residential), which has a minimum lot area requirement of 5,000 square feet. The Town of Estes Park Board of Trustees voted to approve Ordinance 09-23 for the Raven Subdivision Zoning Map Amendment at the regular public hearing held on November 14, 2023. Project Description: Habitat for Humanity plans to develop the five proposed lots with single-family residences in the R-1 zone, which is a use by right. Habitat for Humanity will construct the dwellings and sell the homes to individual, qualified buyers. §4.3.D.4 of the Estes Park Development Code (EPDC) states that “All developments in the R-1 District shall be subject to the attainable housing limitations for rental and owner occupancy set forth in §11.4.C.” A Deed Restriction or Restrictive Covenant and Agreement is required per §11.4.E.4. This will be finalized and recorded with the subsequent Raven Subdivision final plat. Open Space is required per §4.3.D.1 of the EPDC at a minimum of 15% of the total subdivision. The applicant proposes a conservation easement for the open space on Lot 5, with the Estes Park Housing Authority serving as Grantee of the easement. This will be finalized and recorded with the subsequent Raven Subdivision final plat. The open space is approximately 6,288 square feet and is 17.5% of the total subdivision. The open space will be used for passive recreation and accessed from the proposed sidewalk along Raven Avenue. Location and Context: The proposed subdivision is situated approximately 500 feet north of Big Thompson Avenue (Highway 34) near an area with a mixture of density and uses, including residential, accommodations, and commercial. The adjacent residential properties exhibit a range of density, including RM (Multi-Family) to the north and directly west of the subject property. The properties to the east of the subject property are lower density and zoned E (Estate). These lots are approximately 0.47 acres. The Rocky Mountain Hotel and Conference Center sits just south of the subject property and is zoned A (Accommodations). Page 9 Zoning Map Table 1: Zoning and Land Use Summary Comprehensive Plan Zone Uses Subject Site Mixed Residential Neighborhood R-1 (Single-Family Residential) Residential North Mixed Residential Neighborhood RM (Multi-Family Residential) Residential South Mixed-Use Centers & Corridors A (Accommodations) Accommodations, Motel East Suburban Estate E (Estate) Residential West Mixed Residential Neighborhood RM (Multi-Family Residential) Residential, Condominiums Page 10 Vicinity Map Project Analysis Review Criteria Per the EPDC, Chapter 3 Review Procedures and Standards, Section 3.9.C.1., General, "Subdivisions are approved in two stages: first, a preliminary subdivision plat is approved, and second, a final subdivision plat is approved and recorded." Section 3.2 requires a Planning Commission review and recommendation of the preliminary plat, with the Town Board's final action (approval or denial) as the decision- making body. The final plat goes only to the Town Board. The Applicant intends to submit a final plat application soon. Depending upon the project's complexity, this section may be a brief summary of the standards of review or may involve a more detailed analysis of the criteria based on issues relevant to any particular project. 1. Lots. The proposed Raven Subdivision is a resubdivision of Lot 2A of Ward Minor Subdivision, approved and recorded in early 2021. The proposed subdivision Page 11 includes four (4) lots approximated 5,975 square feet in size with Lot Five (5) approximately 11,950 square feet. With approval of the concurrently reviewed Raven Subdivision Rezoning application, all lots meet applicable minimum zoning standards for the R-1 (Single-Family Residential) Zoning District. 2. Comprehensive Plan. The subject property is designated as a Mixed Residential Neighborhood in the Estes Forward Comprehensive Plan's Future Land Use Map. This category "accommodates high density mixed residential development that facilitates the coexistence of townhomes, condos and multi -family complexes." There is a variety of existing development in this area of Estes Park and a variety of Future Land Use categories surrounding the subject property. Nearby uses include Accommodations, multi-family and single-family residential, commercial and service uses. The proposed subdivision is consistent with the surrounding area and with the recommendations of the Estes Forward Comprehensive Plan. 3. Grading and Site Disturbance. Limits of Disturbance. The EPDC Section 10.5.B.2 requires that limits of disturbance (LOD) be established with the subdivision of land. With platted easements, setback requirements, an existing 20- foot Drainage and Utility Easement and another proposed Drainage Easement, the building area of each of the five lots is limited to a specific location. This establishes limits of disturbance for the subdivision. 4. Open Space Area. The EPDC Section 4.3.D. requires residential subdivisions containing five or more lots to set aside a percentage of the gross land area for open areas. The proposed subdivision has 17.5% set aside for open space, which exceeds the minimum requirements. 5. Geologic and Wildfire Hazard Areas. There are no Geologic or Wildlife Hazard areas within this subdivision area. 6. Water. The Town of Estes Park will provide water service to the five proposed lots. Town Utilities/Water has stated they can provide water with service lines using existing mains in this area and has "no objection" to the preliminary plat application. 7. Fire Protection. The Estes Valley Fire Protection District has reviewed this proposal and has provided comments. Specific requirements apply to building permit applications. 8. Electric. There is an overhead electric line across the subject area. There was some question about whether the proposed residential structures would have the 7.5-foot minimum required separation from this line. The Applicant has determined this distance can be met. This will be verified through the building permit review process and prior to the issuance of any Certificate of Occupancy. Power & Communications does not have any other issues or concerns. Page 12 9. Sanitary Sewer. Sewer service is provided by the Upper Thompson Sanitation District (UTSD). Revisions to easements were made on the preliminary plat as requested by UTSD, and with those revisions, UTSD has "no new comments." 10. Stormwater Drainage. A Utility, Grading and Drainage plan was submitted by the Applicant and revised as requested by Public Works. An onsite detention pond with drainage easement is proposed to capture stormwater flows from the project. Public Works notes a Final Drainage Report will be required with construction plans which will be finalized and approved prior to the recordation of the final plat (Attachment 5). 11. Streets and Access. The two western lots, Lots 1 and 2, will have access by a single point from Raven Avenue, with Lots 3, 4 and 5 having individual access directly from Raven Avenue. An Access and Driveway Easement Agreement has been submitted for the common drive for Lots 1 and 2. This will be finalized and recorded with the final plat. A five (5) foot concrete sidewalk is proposed and will follow the existing curb and gutter with a 2% cross-slope. 12. Public Right-Of-Way. There is no dedication of public right-of-way associated with this subdivision plat. Reviewing Agency Comments: The preliminary plat application was referred out for agency comments. Agency comments were received by Staff, which have been addressed with the revised plat submittal (Attachment 3). There are no outstanding issues. Planning Commission Continuance: The Raven Subdivision Preliminary Plat application was presented to the Estes Park Planning Commission on October 17, 2023. Questions were raised at that time, with the Planning Commission ultimately voting to continue the Subdivision to the November 21st hearing. The following is a brief discussion of the questions that were raised on October 17th: 1. Concern for existing vegetations, specifically willows. The willows are not in a wetlands area. Commissioner Shirk recommended preserving the willows by incorporating them into the open space and would like to see what vegetation is being removed. a. Per Daniel Barrett, Van Horn Engineering, regrading will occur for drainage to flow into the detention pond, which may affect the willows. b. Commissioner Shirk requested more consideration for conservation and possible movement of the swale, so it is not impacting the willows, starting with the stormwater design. Page 13 c. Per David Emerson, Habitat for Humanity, there are not many options due to drainage, and the Fire Department does not allow for landscaping near a house. 2. It was moved and seconded (Shirk/Comstock) to continue the recommendation of the Raven Subdivision Preliminary Plat to the next regular meeting, requesting more information on 7.2.d, limits of disturbance, Subsection 2, criteria for establishing limits of disturbance, information about the maintenance of a stormwater pond, requirements of appendix B.2.c, submittal requirements for Preliminary Subdivision Plans showing the vegetation on site. The Applicant consented to the continuation. The motion passed 4 -0. a. The applicant’s consultant submitted a revised preliminary plat, showing existing vegetation in greater detail, including the extent of the willows. The revised preliminary plat also shows the Limits of Disturbance in greater detail. (Attachment 3) b. The applicant’s consultant provided a response letter to summarize the limits of disturbance and to provide more information on detention pond maintenance. (Attachment 7) Public Comments: A neighborhood and community meeting regarding the project was held on August 7, 2023, at the Presbyterian Community Church. There were seven attendees. The Applicant discussed the rezone and subdivision projects and answered questions regarding the zoning, timeframe for the project, property valuation, and landscaping of the proposed development. Staff has meeting notes and a sign-in sheet on file (Attachment 6). In accordance with the notice requirements in the EPDC, notice of the Planning Commission meeting was published in the Estes Park Trail-Gazette, on November 3, 2023. Notification was mailed to all required adjacent property owners on October 2, 2023. Staff has received no inquiries or opposition at this writing. Any comments submitted will be posted to: www.estes.org/currentapplications. Staff Findings: Based on the foregoing, Staff finds: 1. The Planning Commission is the Recommending Body for the Preliminary Plat. 2. The Town of Estes Park Board of Trustees is the Decision -Making Body for the Preliminary Plat. Town Board approval of a Final Plat is also necessary to subdivide the property. Page 14 3.Adequate public/private facilities are currently available to serve the subject property. 4.This request has been submitted to all applicable reviewing agency staff for consideration and comment. 5.The Preliminary Plat application complies with applicable standards set forth in the EPDC. Recommendation: Staff recommends approval of the Raven Subdivision Preliminary Plat. Sample Motions: 1.I move to forward a recommendation of approval to the Town Board of Trustees of the Raven Subdivision Preliminary Plat, according to findings of fact recommended by Staff. 2.I move to continue the Raven Subdivision Preliminary Plat application to the next regularly scheduled meeting, finding that … [state reasons for continuing]. 3.I move to forward a recommendation of denial to the Town Board of Trustees of the Raven Subdivision Preliminary Plat application, finding that … [state findings for denial]. Attachments: 1.Application 2.Statement of Intent 3.Revised Preliminary Plat 4.Preliminary Grading Plan 5.Public Works Comment Letter- April 4, 2023 6.Neighborhood and Community Meeting Notes 7.Van Horn Engineering Response Letter 8.Preliminary Landscape Plan Page 15 Condominium Map Preliminary Map Final Map Pre-App Development Plan Special Review Preliminary Subdivision Plat Final Subdivision Plat Minor Subdivision Plat Amended Plat Project Description Lot Size Area of Disturbance in Acres Proposed Land Use Town Well None Town Well None Existing Sanitary Sewer Service EPSD UTSD Septic None Proposed Sanitary Sewer Service EPSD UTSD Septic Is a sewer lift station required?Yes No Existing Gas Service Other None Existing Zoning Proposed Zoning Are there wetlands on the site?Yes No Site staking must be completed at the time application is submitted. Complete?Yes No Name of Primary Contact Person Complete Mailing Address Primary Contact Person is Owner Applicant Consultant/Engineer Existing Land Use Existing Water Service Attachments Proposed Water Service Site Access (if not on public street) Please review the Estes Park Development Code Appendix B for additional submittal requirements, which may include ISO calculations, drainage report, traffic impact analysis, geologic hazard mitigation report, wildfire hazard mitigation report, wetlands report, and/or other additional information. Project Address Parcel ID # Legal Description General Information Boundary Line Adjustment ROW or Easement Vacation Street Name Change Rezoning Petition Annexation Request Time Extension Other: Please specify Project Name Supplemental Map ESTES PARK PLANNING DEPARTMENT APPLICATION Type of Application Submittal Date: Site Information Application fee Statement of intent 2 copies (folded) of plat or plan 11" X 17" reduced copy of plat or plan Xcel Primary Contact Information Community Development Department Phone: (970) 577-3721  Fax: (970) 586-0249  www.estes.org/CommunityDevelopment Town of Estes Park  P.O. Box 1200  170 MacGregor Avenue  Estes Park, CO 80517 Other (specify) Other (specify) Digital Copies of plats/plans in TIFF or PDF format emailed to planning@estes.org PLEASE CHECK ONLY ONE BOX Sign Purchase ($10) Page 16 Page 17 Page 18 STATEMENT OF INTENT for the RAVEN PRELIMINARY SUBDIVISION PLAT and REZONING of LOT 2A of the WARD MINOR SUBDIVISION, located in Section 20, Township 5 North, Range 72 West of the 6th P.M., Town of Estes Park, Larimer County, Colorado September 29, 2023 PROJECT LOCATION: The proposed development is within the Town of Estes Park, in Section 20, Township 5 North, Range 72 West of the 6th P.M. The property is located adjacent to and south of Raven Avenue which is north of US 34 and east of Lone Pine Drive. The property addresses will be off of Raven Avenue and there are no new named roads associated with this subdivision. OWNER: The owners of this land and the applicant is Habitat for Humanity with a contact of David Emerson. Habitat will own the property until their new owner qualification and application process is finalized, at which time, each lot will be deeded to new owners. PROJECT DESCRIPTION: This project is proposed as a 5 lot subdivision. The detention pond will be included with the eastmost lot and will be covenant controlled for maintenance. Each of the four western lots are 5,975 s.f. in size and the eastmost lot contains 11,950 s.f. Density is calculated at 5/0.82 or 6.1 units per acre which meets the allowed R-1 zoning density. While the intent of this subdivision is to generally supply local workforce housing, no density bonus is requested or applied for. This property is within the annexation limits of the Town currently. There is a dedicated road (Raven Avenue) for the lot frontage. No new right of way dedication is proposed or needed. Utility Easements are proposed to be dedicated for the proposed utility needs associated with the buildout of this plan (see preliminary plan). This project proposes to rezone the current property from residential (RM) zoning to residential (R-1) zoning which will allow building of single family homes on proposed lots 1-5. As lots are built out under Habitat for Humanity processes, 5 lots with a house each will be sold individually and used as single family housing for owners and/or residents in the Estes Valley. This development is intended for local working families, and not vacation rentals. An HOA with covenants will be formed for the proposed use and care of the common spaces and improvements. ACCESS: Currently the 0.82 acre single lot (2A) is vacant and has no internal roads or driveways. A single access point will serve the two western lots. The remaining three eastern lots will access directly from Raven Avenue. The purpose of the shared driveway on the west is to provide better sight distance given the crest vertical curve that exists on Raven Avenue. This project will easily provide access for emergency purposes by having individual or shared driveways close to (or on) Raven Avenue. Given the small size of the development, no traffic study was required. OPEN SPACE: Open space is provided by the area on the east side of Lot 5 that contains an existing drainage and utility easement and a proposed drainage easement. The total square footage of this area is approximately 6,287 sq-ft which is 17.5% of the existing Lot 2A. This open space area will be used for passive recreation. The remaining area of Lot 5 to the west of the open space area is 5,660 sq-ft, Page 19 which meets the allowed R-1 zoning density. Furthermore, this project includes relatively dense vegetation on the south and east sides. These vegetated areas have been reviewed and determined to not be a wetland. Nonetheless, we are proposing minimal impact to the vegetated areas on site. Two large deciduous tree clusters exist on site. The west of the two is directly under the proposed home construction on Lot 5, so it will be removed. The east cluster of the two is directly over the sewer line that exists and will also be removed in time. UTILITIES (see individual utility notes below): This property is currently adjacent to all the main utilities. The main lines will be tied into via service lines and no main lines will be extended. ELECTRIC: The existing overhead utility lines along the south right of way for Raven Avenue are proposed to remain overhead. WATER: A water main exists in Raven Avenue and one trench is proposed to connect 4 of the 5 service lines to. The fifth lot is proposed to connect to the fire hydrant stub on the south side of Raven Avenue. Regarding fire protection, there is an existing hydrant on site (mentioned above). SEWER: There is an existing sewer main downhill from the proposed homesites and all 5 new houses are proposed to connect via 4” pvc separate service lines that exit the south side of each new home. Each service line will be able to provide sewer service by gravity flow. There is also mention of (but no formal locates as of yet) a sewer service line near the proposed service lines that serves the building to the west. Said line will need to be located and maintained or relocated for that service to continue. GAS: Gas service has not been worked out at this preliminary stage, but is planned to be secured from gas lines in the neighborhood. PUBLIC FACILITIES: Curb and gutter exist along the south side of Raven Avenue and a new 5’ wide public sidewalk (concrete) is proposed to be added along the subdivision’s frontage. The grade of the sidewalk will follow and be attached to the curb and gutter. The sidewalk will be within the public right of way. For non-access areas, curb height will be returned to existing 6” height. LANDSCAPING: This project requires landscape buffers along the north (non-arterial) road and the district buffer along the south (accommodation zoned property). The requirements for buffering of the streets and districts require significant landscaping that historically has overcrowded the trees so the future landscape plan (with final plat submittal) will likely propose an alternative. It is planned to utilize the required number of trees and shrubs, however distribute them throughout the property including around the proposed houses. Locating trees around the houses provides screening as well and will add to the visual appeal of the overall property. STORMWATER: This property is not close to a river, yet has an outfall flow path that can be used for the outfall from the detention pond that is proposed. The single detention pond is designed to capture the developed difference in flow and release at 90% of the historic flow, which will minimize-lessen stormwater impacts downstream. The pond is designed with an outlet structure with an orifice plate restriction to mimic the 90% historic flow. The location of the release is such that less adverse impacts will result downstream. There is a significant off-site pass through flow to the east that exists as a grass lined swale along the southern line of the property. This off-site flow is detained upstream in at least two detention ponds. No change to this off-site flow quantity is proposed and only enhancement of the existing swale and repair of one adjacent culvert is proposed (see notes on Page 20 drainage sheet). The pond is intentionally kept shallow for safety and the side slopes are proposed at a 3:1 (H:V) ratio slope so that grasses will take hold, prevent erosion and look aesthetically pleasing. The pond is also curved and shaped to blend into the natural environment better than a rectangular pond would. ARCHITECTURE: Attached to this preliminary proposal are elevations and floorplans for a ‘typical’ house to be built on this subdivision once it is approved. SCHEDULE: The houses will not all be constructed at the same time, but a steady construction process is planned as families apply and are matched up with Habitat for Humanity. The utility service lines will all be installed at one time once approval is given for the subdivision. There is no formal phasing plan to build the homes by. Regarding “Standards for Review” for rezoning set forth in EPDC Section 3.3: • The proposed rezoning and preliminary subdivision plat meet the three requirements laid out in EPDC. Further, by rezoning from RM to R-1 it allows for the building of high- density single-family homes. RM zoning allows for high-density development but forces them to be multi-family attached townhomes or condos. The existing lot is currently vacant and not a steeply sloped lot, so it is an ideal candidate to be developed and add to the growth of Estes Park consistent with the policies and intent of the Comprehensive Plan. There are adequate services, utilities and facilities in this area as well. OTHER: • This property was granted a Variance in January of 2023 by the Estes Valley Board of Adjustment to allow 50’ wide lots (where 60’ is the Code minimum). • A Neighborhood meeting was held in early August of 2023 for this subdivision. Minutes of said meeting are attached with this application. • All setbacks for the R-1 zone are met with the proposed construction within this proposed subdivision (as shown on the attached mapping). • A wetland study was completed by Van Horn Engineering (in 2009) and that determined that there are no wetlands present on the property. Dense vegetation exists in the south east of the property due to the concentration of storm drainage across this section of the property. • The property does not lie within a Mapped Estes Valley hazard area Page 21 Page 22 Page 23 PUBLIC WORKS PUBLIC WORKS Ward Minor – Preliminary Subdivision Plat Habitat for Humanity – Raven Ave (5 lots) Public Works Comments April 4, 2023 SUMMARY The following documents were submitted by Van Horn Engineering and Surveying, unless otherwise noted, in support of this Preliminary Subdivision Plat review:  Statement of Intent (3/15/22)  Preliminary Subdivision Plat (3/15/23)  Preliminary Utility, Grading & Drainage Plan (3/15/23)  Architectural Plan by BAS1S (3/15/23)  Preliminary Drainage Report (3/15/23) Public Works finds that the Preliminary Subdivision Plat is acceptable.  A Final Drainage Report shall be submitted for approval with the Construction Plan.  Construction plans for subdivisions shall be approved prior to final plat approval (EPDC Appendix D, IX. A).  Construction plans for all developments shall be approved prior to issuance of first building permit (EPDC Appendix D, IX. A).  No building permits will be issued until the Improvement Agreement is executed (EPDC §10.5 K.3) and securities are in place. Alternatively, the applicant may construct the public improvements that otherwise must be securitized. These improvements must be “in place” according to EPDC §7.12 C.1.  Where multiple building permits are to be issued for a project, 25% of the building permits and certificates of occupancy may be issued prior to the installation and acceptance of the drainage facilities (EPDC §7.12 F. 2). ANALYSIS Statement of Intent. ACCESS: The shared driveway serving Lots 1 and 2 (accessed through Lot 1A of the Ward Minor Subdivision) shall be covered by submittal of a maintenance agreement for recordation (EPDC Appendix D, III. B. 6. c). Utility, Grading & Drainage Plan.  The proposed Ingress/Egress driveway is existing.  The existing opening with tapered curbs on Raven Ave shall be restored to continuous full height curb if not used for new driveway or other approved access.  The high slope area may be graded as necessary for the site design. Preliminary Drainage Report.  References to elements and information for the Final Drainage Report are acknowledged.  The effective FIRM (12/19/06) need not be included in the Final Drainage Report. Page 24 Meeting: Habitat for Humanity Raven Avenue Project Date/Time: Thursday, August 7, 2023 at 5:00 PM Location: Fellowship Hall, Presbyterian Community Church – 1700 Brodie Avenue Note Taker: Daniel Barrett, Van Horn Engineering Project Overview John Lovell, Director of Development for Habitat for Humanity of the St. Vrain Valley presented. John introduced professionals assisting with project. Lonnie Sheldon, Van Horn Engineering Daniel Barrett, Van Horn Engineering Lonnie Sheldon, Van Horn Engineering presented the following • Site Plan – show housing footprints, 5 single family homes, each house has a 1-car garage, homes would be two stories and have 3 or 4-bedrooms, two western most homes would utilize a shared driveway • Conceptual Architectural Plans –conceptual but gives you an idea of what this might look like. • Notice of Application – neighbors will be noticed that application submitted. Sign will be posted to let you know application has been submitted. • Reason for rezoning – RM zoning is high density but there is a caveat in the Code that does not allow for single family homes to be built on these proposed lots. Rezoning to R-1 would solve this problem and allow Habitat to keep the plans exactly as they are. Lonnie explained that the Town is waiving the rezoning fee to make this process easier for Habitat. The Town generally supports rezoning. Habitat loses out on timing because Van Horn did not catch this caveat in the Code. John Lovell, Habitat for Humanity presented the following • Habitat for Humanity overview o Summary of Habitat for Humanity’s vision/mission to provide permanently affordable housing. o Homeownership model o Affordable, USDA mortgages 1-3% interest, recycle to build more homes o Those selected need to have a housing need, ability to repay, and income in the range of 40-80% of the Area Median Income ($40,000 - $80,000/year income for a family of four) o Families partner, take classes to prepare for home ownership o Must be US Citizen or legal resident o Long term benefits to homeowners in the program – 2021 study completed in Colorado  Greater sense of well-being  Improved health  Safer neighborhood  Increased savings  Improved educational outcomes for family members o Goal is to make sure Habitat for Humanity homes blend in with other homes in the neighborhood where they are located. Provided examples of homes built in Estes Park. Have homes in 30 different neighborhoods. o Homes will become part of Estes Park’s permanently affordable housing stock. Page 25 • Project location –lot on Raven Avenue, across from Olympian Lane which will support 5 single family homes Public Comments & Questions Question:– Has rezoning been approved? Answer – No, not yet - this meeting is the first step in that process. Question:– How will this affect property taxes? Answer – John Lovell explained that property taxes tend to go up and houses appreciate at the same value as the rest of the neighborhood. Question:– Will the Town fix that zoning issue that makes it difficult to build high-density single family homes in RM zoning? Answer – Lonnie explained that former Planner Randy Hunt wanted to fix it but left before he could. Question:– From property owner across the street: will the thistle that was pulled from the lot and piled up on site be removed soon? Answer – John Lovell explained that it was supposed to be removed and thanked the property owner for bringing this to his attention. He expressed his intention to get it removed as soon as possible. Question:– What is the timeline to build? Answer – That depends on Town support and volunteers. Habitat hopes to build at least 1 house per year. With more community volunteers, they can build faster. Lonnie explained the utility work needed to get started with one road cut being necessary. If this plan is approved, they can begin building foundations in the spring (2024). Question:– Will it be landscaped and will wild, existing vegetation be replanted? Answer – The Town has landscaping guidelines that will be followed. Lonnie explained that there will be more public meetings moving forward and that can be discussed if the plan is approved. Lonnie explained reason for shared access on the west side. Page 26 Page 27 Page 28 Page 29 Page 30 To: Chair Matt Comstock Estes Park Planning Commission Through: Jason Damweber, Interim Community Development Director From: Kara Washam, Planner I Date: November 21, 2023 Application: MAX Storage Amended Development Plan DJMC LLC, Owner/Applicant Recommendation: Staff recommends the Estes Park Planning Commission approve the Amended Development Plan. Land Use: Comprehensive Plan Designation: (Future Land Use): Industrial Mix Existing Zoning District: CH (Commercial Heavy) Site Area: 0.84 Acres PUBLIC HEARING ORDINANCE LAND USE CONTRACT/AGREEMENT RESOLUTION OTHER______________ QUASI-JUDICIAL YES NO Objective: The Applicant requests the Estes Park Planning Commission review a minor modification to the landscape plan of an approved development plan, substituting shrubs in place of trees. Location: The property is legally described as Lot 3A, Amended Lots 3 & 4, Mountain Technological Center, Estes Park. It is located at 1748 Mountain View Court, at the southwest corner of Acacia Drive and Mountain View Court. Background: The development plan for MAX Storage was approved by the Estes Park Planning Commission at the October 20, 2020 public hearing (Attachments 3 & 4). Construction of the 12-unit storage facility was completed in 2023. Release of the Letter of Credit and issuance of Certificate of Occupancy were put on hold until a minor modification to the landscape plan could be considered. Sites visits to the property were made by Public Works and Planning staff in late September 2023. The As-Built plan for the building was Page 31 found to be satisfactory (Attachment 5). Landscaping was installed per the approved Landscape Plan sheet of the Development Plan, except for eight (8) trees at the north side of the property along Acacia Drive. Project Description: The Applicant has submitted an Amended Development Plan application and requests consideration of a minor modification to the landscape plan of the approved development plan. The approved development plan proposed eight (8) trees to be planted along Acacia Drive. With the proximity of an existing sewer easement and insurance requirements for trees to be a minimum of ten (10) feet from the structure, the Applicant is unable to install trees in this location. The Applicant proposes shrubs in place of trees in this location, at a ratio of three (3) shrubs to one (1) tree for a total of twenty-four (24) additional shrubs along Acacia Drive (Attachment 6). Location and Context: Zoning Map Page 32 Vicinity Map Table 1: Zoning and Land Use Summary COMPREHENSIVE PLAN ZONING USES SUBJECT PARCEL Industrial Mix CH (Commercial Heavy) Commercial NORTH Mixed Residential Neighborhood RM (Multi-Family Residential) Residential SOUTH Neighborhood Village R (Residential) Residential EAST Industrial Mix I-1 (Industrial) Industrial WEST Industrial Mix CH (Commercial Heavy) Commercial Project Analysis Review Criteria: Amendments to approved development plans fall under “Minor Modifications” and is subject to the Chapter 3 Review Procedures and Standards detailed in Section 3.7. of the EPDC. Section 3.7.B.2. states that “Minor modifications to an approved Page 33 development plan, final PUD plan or final subdivision plat shall be noted on a revised plan/plat, which shall be plainly marked as ‘Amended’ and submitted to the Staff.” The Estes Park Planning Commission (EPPC) is the Decision-Making Body for the proposed Amended Development Plan. Under the Estes Park Development Code (EPDC), Chapter 7 Landscaping and Buffers, Section 7.5.C.2. states “Alternatives to the specifications concerning minimum plant sizes and quantities set forth in this Section may be authorized by the Decision-Making Body, provided that the Applicant submits a detailed landscaping plan and that the Decision-Making Body determines that the proposed landscaping satisfies the purpose and intent of this Section.” Reviewing Agency Comments: The Amended Development Plan application was referred out for agency comments. No requirements or revisions were requested, and there are no outstanding issues. Planning Commission Continuance: The MAX Storage Amended Development Plan application was presented to the Estes Park Planning Commission on October 17, 2023. Questions were raised at that time, with the Planning Commission ultimately voting to continue the amended development plan to the November 21st hearing. The following is a brief discussion of the questions that were raised on October 17th: 1. Trees were not a requirement for street buffering along Acacia Drive in the original Development Plan. The number of trees was required, but their specific placement was not. The overall intent should be met. a. Concerns were expressed regarding the mature height of the proposed shrubs as well as the exact location and species of the proposed shrubs. 2. Concerns for excessive and noncompliant lighting was expressed through public comment. a. Vice Chair Heiser confirmed that lighting was a part of the landscape plan requirements. b. Commissioner Shirk noted that, per code, "if installed, all exterior lighting shall meet the functional security needs of the proposed land use without affecting adjacent properties or the community." 3. It was moved and seconded (Pawson/Shirk) to continue the amended MAX Storage Development Plan to the next regularly scheduled meeting, finding that a revised landscaping plan describing the replacement shrub type and location, and more information on how the landscaping will provide adequate screening of lighting be submitted. The motion passed 5-0. Page 34 a. The applicant’s consultant submitted a revised amended landscape plan, showing the proposed shrubs in greater detail. A Planting Legend is shown on the plan and delineates the typical spread and height of the proposed shrub species. (Attachment 6) b. Additional review by Planning staff determined that the exterior lights installed adjacent to the overhead doors of the building are noncompliant with §7.9.D.1. of the Estes Park Development Code. The applicant is agreeable to mitigating the issue by replacing the lights for compliance. The applicant provided a specification sheet for the proposed replacement lights. (Attachment 7) Public Comments: In accordance with the notice requirements in the EPDC, notice of the Planning Commission meeting was published in the Estes Park Trail-Gazette, on November 3, 2023. Notification was mailed to all required adjacent property owners on October 2, 2023. Staff has received no inquiries or opposition at this writing. Any comments submitted will be posted to: www.estes.org/currentapplications. Staff Findings: Based on the foregoing, Staff finds: 1. The Planning Commission is the Decision-Making Body for Amended Development Plan applications. 2. This request has been submitted to all applicable reviewing agency staff for consideration and comment. 3. The Amended Development Plan application complies with applicable standards set forth in the EPDC. Recommendation: Staff recommends approval of the MAX Storage Amended Development Plan. Sample Motions: 1. I move to approve the MAX Storage Amended Development Plan, according to findings recommended by Staff. 2. I move to continue the MAX Storage Amended Development Plan to the next regularly scheduled meeting, finding that … [state reasons for continuing]. 3. I move to deny the MAX Storage Amended Development Plan, finding that … [state findings for denial]. Page 35 Attachments: 1. Application 2. Statement of Intent 3. EPPC 10/20/2020 Minutes 4. Approved Development Plan 5. As-Built Plan 6. Revised Amended Landscape Plan 7. Exterior Lighting Specifications Page 36 Page 37 Page 38 Page 39 September 13, 2023 Town of Estes Park Community Development P.O. Box 1200 Estes Park, Co. 80517 RE: Max Storage Amended Development Plan -Statement of Intent Cornerstone Engineering and Surveying, Inc. (CES), on behalf of the owners DJMC, LLC, is submitting a minor modification to an approved development plan for 1748 Mountain View Ct, Estes Park, Colorado. Project Description The owner is requesting an Amendment to the development plan approved at the October 20, 2020 Planning Commission meeting. The approved development plan proposed trees to be planted along Acacia Dr (8 trees total). With the proximity of an existing sewer easement and insurance requirements requiring trees to be a minimum 10-feet from the structure, trees are unable to be planted in this location. The owner is proposing to plant shrubs in place of the trees at a ratio of 3 shrubs to 1 tree for a total of 24 additional shrubs added along the street frontage. Sincerely, Cornerstone Engineering & Surveying, Inc. Jes Reetz Planner Page 40 Town of Estes Park,Larimer County,Colorado,October 20,2020 Minutes of a Regular meeting of the ESTES PARK PLANNING COMMISSION of the Town of Estes Park,Larimer County,Colorado. Meeting held VIRTUALLY in said Town of Estes Park on the 20 day of October 2020. Committee:Chair Matt Comstock,Vice Chair Matthew Heiser, Commissioners Joe Elkins,Howard Hanson,Steve Murphree. Attending:Chair Comstock,Vice Chair Heiser,Commissioners Skins, Hanson,Murphree,Director Randy Hunt,Senior Planner Jeff Woeber,Planner II Alex Bergeron,Recording Secretary Karin Swanlund,Town Attorney Dan Kramer,Town Board Liaison Barbara MacAlpine Absent:none Chair Comstock called the meeting to order at 1:30 p.m. AGENDA APPROVAL It was moved and seconded (Murphree/Hanson)to approve the agenda and the motion passed 5-0. PUBLIC COMMENT. None CONSENT AGENDA APPROVAL It was moved and seconded (Heiser/Murphree)to approve the consent agenda and the motion passed 5-0. AMENDED PLAT:258/260 STANLEY AVENUE,Mountain Wood Townhomes Town Attorney Kramer noted that he is a neighbor to this project but it does not impact him.Commissioner Heiser disclosed that he does business with this applicant but has had no conversations and has no financial interest. Senior Planner Woeber reviewed the staff report.He explained that when the project was developed,a below-grade patio for use by the unit on Lot 2 ended up being located partially on Lot 1.This was initially approved through a Minor Modification of the Development Plan.The current owners propose a slight rearrangement of the common lot line to contain the patio entirely on Lot 2.This involves a change of 140 square feet being added to Lot 2.Staff recommends the Estes Park Planning Commission forward a recommendation of approval of the Amended Plat. DISCUSSION: Chair Comstock shared his hopes that the Planning Commission can approve the administrative code amendment to allow cases like this to be staff-level decisions. It was moved and seconded (HeiserlComstock)to recommend the Estes Park Board of Trustees APPROVE the Mountain Wood Townhomes Subdivision Amended Plat,to rearrange an internal lot line as described in the staff report, with findings as recommended by staff.The motion passed 5-0. MINOR SUBDIVISION:LOT 1,NORTH LAKE SUBDIVISION,Raven Avenue Vice-Chair 1-leiser disclosed that he had previously sat on the board for Habitat for Humanity. Planner II Bergeron reviewed the staff report.This Minor Subdivision would create a plat for two lots:(a)a western lot containing all of Northlake Condominiums and their common area including parking,and (b)a vacant lot consisting of the remainder of the original parent tract.The proposed plat would correspond to the 1 980s-era deed Page 41 RECORD OF PROCEEDINGS Estes Park Planning Commission —OCTOBER 20,2020 —Page 2 division,the legality of which is disputed by the Town and the applicant,except that the Northiake Condos (situated on newly-created Lot 1A)would include somewhat more area east of current development so that additional parking can be built there someday. I was noted that approval of this minor subdivision resolves the legal lot dispute. Should the Minor Subdivision of Lot 1,North Lake Subdivision be approved,the applicant proposes to further divide the newly created eastern lot (Lot 2A)into five or six single-family building lots,via a Subdivision process,with Habitat for Humanity building houses,over a period of time.Staff recommended approval of the Minor Subdivision. DISCUSSION: Planner Bergeron noted that the Board of Adjustment approved a density variance of 25 units per acre based on the entire lot’s dimension.Director Hunt explained the processes this parcel has gone through to get to this point and that rezoning will not be necessary. Referring to the EVDC Chapter 10.5.D.2.a,Vice-Chair Heiser asked at what stage sidewalks would be required.Considerable discussion was had on this subject.Joe Coop,Van Horn Engineering,understood that sidewalk installation would be at the Habit for Humanity project stage.This was initially proposed to be an amended plat before it was realized that the lot might not have been legally subdivided as initially thought by the applicant.Dave Emerson,Director of Habitat for Humanity in the Estes Valley,stated that they are planning on five lots with single4amily homes that would include sidewalks.It was concluded that the owner of Lot 1A (the Condos)would be responsible for the improvements if a development plan is required for the additional 19 parking spaces,which would be limited to that lot.Any further subdivision of Lot 2A would require the improvements to that entire frontage be guaranteed following the approval of that plat or development plan (if applicable due to a change of product concept). Commissioner Hanson asked for clarification on the increased density intentions for lot 2A.Cory Berg,Van Horn Engineering,answered that the variance on density granted by the Board of Adjustment would apply to Lot 1A which is already built over today’s density standards and that development on Lot 2A by Habitat for Humanity would be within permitted density allowances. It was moved and seconded (Comstock/Murphree)to recommend that the Town Board APPROVE the Minor Subdivision of Lot 1,North Lake Subdivision Preliminary Plat,with the requirement that public sidewalk improvements for Lot 2A be guaranteed prior to the approval of a Development Plan or further subdivision,in accordance with the findings as presented by staff.The motion passed 4-0.Commissioner Elkins was unavailable. DEVELOPMENT PLAN,MAX Storage,TBD Mountain View Court Commissioner Murphree recused himself from this project as he is personally involved with this project. Planner II Bergeron reviewed the staff report.The owner proposes to construct a 14,800 square-foot,12-unit self-storage facility.The subject lot is 1.01 acres,or 44,213 square feet,in size.The proposed building improvements are expected to cover 14,800 square feet and parking/drives are anticipated to cover 10,700 square feet.Staff recommended approval of the Minor Subdivision. DISCUSSION: Heiser questioned the definition of uses for mini self-storage vs.warehouse storage in this situation.Director Hunt explained that RV storage typically defaults to self-storage due to the uniformity of square footage needed. Page 42 RECORD OF PROCEEDINGS Estes Park Planning Commission —OCTOBER 20, 2020 —Page 3 It was moved and seconded (Heiser/Hanson)to APPROVE the MAX Storage development plan in accordance with the findings as presented by staff.The motion passed 3-0 with Murphree abstaining and Elkins unavailable. REPORTS: Downtown Building Height was proposed to the public via a media release and an op-ed in the Trail-Gazeffe.Consultants are working on a report which should be ready for the November meeting. The Comprehensive Plan grant has been filed.There were 43 applications submitted in addition to ours. Planning Technician position should be filled in November. Commissioner Skins has an ongoing scheduling conflict with Planning Commission meetings.Options for allowing him to continue to serve include meeting at an alternative meeting time.To change the meeting time,the Commission Bylaws would need to be amended.Attorney Kramer noted that calling a series of special meetings is an option. There being no further business,Chair Comstock adjourned the peting at 3:15 p.m. 4/7 Matt Cc(mstock1 karin Swanlund,Recording Secretary Page 43 X X X X X X X X X X X X X X X X X XX O H P O H P 1800 SF FF=7590.75 800 SF FF=7591.25 800 SF FF=7592.25 800 SF FF=7592.75 2518 SF FF=7593.25 3200 SF FF=7593.25 880 SF FF=7593.25 45.0 40 . 0 20.0 50.0 41 . 5 11 . 8 20 . 0 80 . 0 22 . 0 40.0 40.0 13. 6 40 . 0 10' UTILITY & DRAINAGE EASEMENT 10' UTILITY & DRAINAGE EASEMENT 15' BUILDING SETBACK 11'± 15.9'± EXISTING 21" ELLIPTICAL CULVERT U.S.INV= 7682.33 D.S INV= 7680.62 (SEE NOTE #13) ACACIA DRIVE OH P OH P OH P 7700 7 6 9 5 76 9 5 7 6 9 5 7690 769 0 76 9 0 7 6 8 5 76 8 5 S 86°00'00" E 200.00' S 0 4 ° 2 5 ' 1 0 " W 2 8 . 9 6 ' N 0 0 ° 4 7 ' 2 0 " W 1 4 4 . 0 6 ' N 0 0 ° 4 8 ' 3 8 " W 1 5 0 . 2 1 ' N 48 ° 5 9 ' 0 5 " E 1 5 6 . 6 7 ' 3 2 .2 6 ''''''''''''''''''''''''''''''''''''''''' C H =S 8 7 °5 2'1 6 " EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =5 7 0 .0 0 ''''''''''''''''''''''''''''''''''''''''' L =3 2 .2 6 ''''''''''''''''''''''''''''''''''''''''' D =3 °1 4 '3 5 """"""""""""""""""""""""""""""""""""""""" 6 4.50''''''''''''''''''''''''''''''''''''''''' C H =S 2 9°26'48" WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW R =75.00''''''''''''''''''''''''''''''''''''''''' L =66.67''''''''''''''''''''''''''''''''''''''''' D =5 0°56'06""""""""""""""""""""""""""""""""""""""""" 4 3 .2 5 '''''''''''''''''''''''''''''''''''''''''C H =S 8 0 °4 9 '59" EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =6 0 .00''''''''''''''''''''''''''''''''''''''''' L =4 4 .2 5''''''''''''''''''''''''''''''''''''''''' D =4 2 °15 '06""""""""""""""""""""""""""""""""""""""""" 103.46''''''''''''''''''''''''''''''''''''''''' C H = N 18° 28'38" EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =60.00''''''''''''''''''''''''''''''''''''''''' L=124.74''''''''''''''''''''''''''''''''''''''''' D =119° 07'17""""""""""""""""""""""""""""""""""""""""" LOT 5 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 7 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 4 ACACIA CORNER ZONED CH-COMMERCIAL HEAVY LOT 1 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY 60' PUBLIC RIGHT-0F-WAY 50' PUBLIC RIGHT-0F-WAY 44' 20.00 20' ASPHALT SURFACE EXI S T I N G W O O D R A M P 800 SF FF=7593.25 20.0 20.0 20.0 20.0 800 SF FF=7591.75 20 . 0 20 . 0 800 SF FF=7593.25 800 SF FF=7593.25 800 SF FF=7593.25 RO O F R I D G E EL = 7 6 1 6 . 4 ± PROPOSED GRASS LINED DRAINAGE SWALE @ 2.0% PRO P O S E D CUL V E R T @ 1 . 0 % PROPOS E D C U L V E R T @ 1 . 0 % ASPHALT SURFACE 9 6 S S S S S S T 9 7 9 8 9 8 9 5 9 4 9 3 9 2 91 90 89 88 91 9092 93 93 92 92 91 95 96 9 4 9 5 97 PROPOSED CURB & GUTTER PROPOSED CURB & GUTTER 23' 14.4'± 15'± PROPOSED SELF STORAGE UNITS PROPOSED SELF STORAGE UNITS EXISTING ASPHALT ROADWAY MOUNTAIN VIEW COURT EXISTING 8" SEWER MAIN PROPOSED RIPRAP DRAINAGE SWALE 19.50 (TYP.) 9.00 8.00 5.00 15' BUILDING SETBACK PROPOSED 5-FOOT SID E W A L K W W W W W EX I S T I N G 6 " W A T E R L I N E 10' UTILITY & DRAINAGE EASEMENT PROPOSED 25 KVA TRANSFORMER EXISTING GUY-WIRE TO BE MODIFIED PROPOSED AREA INLET RIM=89.5 PROPOSED 6" FIRE LINE & WATER SERVICE (SEE NOTE #14)PROPOSED 4" SEWER SERVICE (SEE NOTE #14) PROPOSED CONCRETE PAN TO PROMOTE STORM FLOWS FROM ACACIA TO BE DIRECTED TO THE EXISTING CULVERT PROPOSED ACCESSIBLE RAMP W/ DETECTABLE WARNING 9 3 9 2 9 1 9 0 TOW 88.5 BOW 86 TOW 88.5 BOW 86 PROPOSED WATER QUALITY POND DETENTION BASIN 2 ~763 CF88 87 86 TOW 89 BOW 87 PROPOSED WATER QUALITY POND DETENTION BASIN 1 ~692 CF SUBJECT PROPERTY LINE BUILDING SETBACK LINE EXISTING EASEMENT AS NOTED EXISTING INDEX CONTOUR EXISTING INTERMEDIATE CONTOUR W EXISTING WATER LINE S EXISTING SEWER LINE G EXISTING GAS LINE 5020 EXISTING TELEPHONE PED EXISTING POWER POLE EXISTING SEWER MANHOLE EXISTING TREE (TYP.) X X X X X X EXISTING FENCE PROPOSED SEWER CLEANOUT PROJECT LOCATION SO U T H S A I N T V R A I N FIS H C R E E K R O A D 18-HOLE GOLF COURSE TO E S T E S PA R K TO A L L E N S PA R K PEAK VIEW DR. ACACIA DR. R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. NOT TO SCALE VICINITY MAP MAP TAKEN FROM TOWN OF ESTES PARK DIGITAL MAP Utilities: Water Town of Estes Park Electric Town of Estes Park Sewer Upper Thompson Sanitation District Gas Excel Telephone Century Link AVERAGE SLOPE = ~7.0% ALLOWABLE MAXIMUM NET DENSITY (UNITS/SF): GROSS/NET LAND AREA -36,850± SF 0.846± ACRES SITE LAND AREA COVERAGE STATISTICS COVERAGE % LOT (GROSS LAND AREA - 36,850± SF) PROPOSED LOT COVERAGE Buildings 14800 sf 40.16% Parking/Drives 10700 sf 29.04% TOTAL IMPERVIOUS COVERAGE 25,500 sf 69.20% TOTAL OPEN SPACE 11,350 sf 30.80% SITE STATISTICS: 1) ZONING - CH- COMMERCIAL HEAVY 2) SETBACKS - 15 FEET FROM STREETS (25 FEET FROM ARTERIAL), 0 FEET FROM REAR AND 0 FEET FROM SIDES. 3) ALL EXTERIOR LIGHTING SHALL BE SHIELDED AND DOWNCASTING; (REFER TO ESTES VALLEY DEVELOPMENT CODE CHAPTER (EVDC) 7, SECTION 7.9 ). ALL STREET LIGHTS WILL NOT EXCEED 15 FT IN HEIGHT. 4) ALL DISTURBED AREAS WILL BE RESEEDED OR SODDED WITH NATIVE GRASSES/WILDFLOWER MIX. ALL NEW TREES AND SHRUBS WILL BE MAINTAINED IN A HEALTHFUL CONDITION. ALL AREAS WILL BE IRRIGATED. 5) TRASH ENCLOSURES WILL BE SCREENED WITH A SOLID FENCE AND ANIMAL RESISTANT. 6) CONTRACTORS MUST CALL UTILITIES NOTIFICATION CENTER OF COLORADO PRIOR TO EXCAVATING (1-800-922-1987). 7) THE BUILDING HEIGHT WILL BE WITHIN THE LIMITS SET FORTH IN THE REVISED HEIGHT MEASUREMENT PROVISION OF THE EVDC. 8) ALL INTERSECTIONS SHALL HAVE STOP SIGNS INSTALLED TO M.U.T.C.D. STANDARDS. 9) ALL REQUIRED IMPROVEMENTS SHALL BE COMPLETED OR GUARANTEED IN ACCORDANCE WITH EVDC 7.12 AND 10.5.K PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY 10) THE OWNER SHALL BE REQUIRED TO PROVIDE FOR HANDICAP ACCESSIBILITY IN ACCORDANCE WITH THE A.D.A., I.B.C. AND EVDC 7.11.J REQUIREMENTS. 11) CONTOURS ARE 1-FOOT INTERVAL. 12) CONDUITS, METERS, VENTS AND OTHER MECHANICAL EQUIPMENT ATTACHED TO THE BUILDING OR PROTRUDING FROM THE ROOF SHALL BE SCREENED, COVERED OR PAINTED TO MINIMIZE VISUAL IMPACT. 13)NOTICE FROM TOWN OF ESTES PARK PUBLIC WORKS (08/24/2020): IT IS ACKNOWLEDGED THAT THE EXISTING ELLIPTICAL CULVERT REQUIRES MAINTENANCE IN ORDER TO SERVE THE PROPOSED DEVELOPMENT. COORDINATION WITH PUBLIC WORKS DURING CONSTRUCTION WILL AIM TO RESTORE THE DOWNSTREAM CONVEYANCE CAPACITY. 14) WATER AND SEWER SERVICES SHOWN ARE INTENDED FOR POSSIBLE FUTURE USE (UTILITY SINK /HOSE BIBS). PROPOSED USE WILL BE DETERMINED PRIOR TO THE BUILDING PERMIT SUBMITTAL. GENERAL NOTES: DEVELOPMENT PLAN CUSTOM CONTRACTING, INC. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 3 SHEET 1954.002 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN JULY 2020 JLR JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2020 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459 JLRAGENCY COMMENTS 08/03/202008/17/2020 JLRADD WATER LINE ALONG WESTERN PL08/17/2020 JLRADD SEWER & WATER SERVICE09/01/2020 JLRADD SIGNTURE BLOCKS09/15/2020 JLRREVISE PROPERTY ADDRESS09/15/2020 LOT 3A, AMENDED PLAT OF LOTS 3 & 4, MOUNTAIN TECHNOLOGICAL CENTER SUBDIVISION, COUNTY OF LARIMER, STATE OF COLORADO LEGAL DESCRIPTION: DJMC, LLC 1220 ACACIA DR. (TBD MOUNTAIN VIEW CT.) ESTES PARK, CO 80517 PROPERTY OWNER: MAX STORAGE DEVELOPMENT PLAN TBD MOUNTAIN VIEW CT. ESTES PARK, CO 80517 LEGEND: 6040200 SCALE 1" = 20' 20 MAX STORAGE TBD MOUNTAIN VIEW CT. ESTES PARK, CO 80517 SHEET 1 DEVELOPMENT PLAN SHEET 2 LANDSCAPE PLAN SHEET 3 BUILDING SCHEMATICS SHEET INDEX: THE UNDERSIGNED, BEING ALL THE OWNERS AND LIENHOLDERS OF THE REAL PROPERTY AS SHOWN ON THIS DEVELOPMENT PLAN, SHALL BE SUBJECT TO THE PROVISIONS OF THE ESTES VALLEY DEVELOPMENT CODE AND ANY OTHER ORDINANCE OF THE TOWN OF ESTES PARK, COLORADO, PERTAINING THERETO. DJMC, LLC By: Print Name: OWNERS STATEMENT: APPROVAL: APPROVED BY THE ESTES VALLEY PLANNING COMMISSION THIS DAY OF , 20__. CHAIR APPROVED BY THE TOWN ENGINEER OF THE TOWN OF ESTES PARK, LARIMER COUNTY, COLORADO THIS ______ DAY OF ___________________________, 20__ A.D. TOWN ENGINEER TOWN ENGINEER M: \ C E S _ J o b s \ 9 5 4 _ 0 0 2 _ G r a n t C o l e S t o r a g e \ D e v e l o p m e n t \ M a x S t o r a g e b a s e m a p . d w g , 9 / 1 5 / 2 0 2 0 1 1 : 5 6 : 1 5 A M , J L R Attachment 2: Development Plan Page 44 X X X X X X X X X X X X X X X X X XX O H P O H P 80 . 0 10' UTILITY & DRAINAGE EASEMENT 10' UTILITY & DRAINAGE EASEMENT 15' BUILDING SETBACK 11'± 15.9'± ACACIA DRIVE OH P OH P OH P 7700 7 6 9 5 76 9 5 7 6 9 5 7690 769 0 76 9 0 7 6 8 5 76 8 5 S 86°00'00" E 200.00' S 0 4 ° 2 5 ' 1 0 " W 2 8 . 9 6 ' N 0 0 ° 4 7 ' 2 0 " W 1 4 4 . 0 6 ' N 0 0 ° 4 8 ' 3 8 " W 1 5 0 . 2 1 ' N 48 ° 5 9 ' 0 5 " E 1 5 6 . 6 7 ' 3 2 .2 6 ''''''''''''''''''''''''''''''''''''''''' C H =S 8 7 °5 2 '1 6 " EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =5 7 0 .0 0 ''''''''''''''''''''''''''''''''''''''''' L =3 2 .2 6 ''''''''''''''''''''''''''''''''''''''''' D =3 °1 4 '3 5 """"""""""""""""""""""""""""""""""""""""" 6 4.50''''''''''''''''''''''''''''''''''''''''' C H =S 2 9°26'48" WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW R =75.00''''''''''''''''''''''''''''''''''''''''' L =6 6.67''''''''''''''''''''''''''''''''''''''''' D =5 0°56'06""""""""""""""""""""""""""""""""""""""""" 4 3 .2 5'''''''''''''''''''''''''''''''''''''''''C H =S 8 0 °4 9 '59" EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =6 0 .00''''''''''''''''''''''''''''''''''''''''' L =4 4 .25''''''''''''''''''''''''''''''''''''''''' D =4 2 °15 '06""""""""""""""""""""""""""""""""""""""""" 103.46''''''''''''''''''''''''''''''''''''''''' C H = N 18° 28'38" EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =60.00''''''''''''''''''''''''''''''''''''''''' L=124.74''''''''''''''''''''''''''''''''''''''''' D =119° 07'17""""""""""""""""""""""""""""""""""""""""" LOT 5 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 7 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 4 ACACIA CORNER ZONED CH-COMMERCIAL HEAVY LOT 1 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY 60' PUBLIC RIGHT-0F-WAY 50' PUBLIC RIGHT-0F-WAY 44' 20.00 20' ASPHALT SURFACE EXI S T I N G W O O D R A M P ASPHALT SURFACE 9 6 S S S S S S T 9 7 9 8 9 8 9 5 9 4 9 3 9 2 91 90 89 88 91 9092 93 93 92 92 91 95 96 9 4 9 5 97 23' 14.4'± 15'± PROPOSED SELF STORAGE UNITS PROPOSED SELF STORAGE UNITS EXISTING ASPHALT ROADWAY MOUNTAIN VIEW COURT EXISTING 8" SEWER MAIN 19.50 (TYP.) 9.00 8.00 5.00 15' BUILDING SETBACK PROPOSED 5-FOOT SID E W A L K W W W W W EX I S T I N G 6 " W A T E R L I N E 10' UTILITY & DRAINAGE EASEMENT 9 3 9 2 9 1 9 0 TOW 88.5 BOW 86 TOW 88.5 BOW 86 88 87 86 TOW 89 BOW 87 R Know what's below. Call before you dig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daho fescue Flanders poppy Blue flax Gaillardia Rocky Mtn. penstemon Black-eyed susan Blue grama Sandberg bluegrass Western wheatgrass Sheep fescue Slender wheatgrass 3Festuca idahoensis 27.20TOTAL Papaver rhoeas 0.1 Linum lewisii 0.5 Gaillardia aristata 1 Penstemon strictus 1.5 0.1Rudbeckia hirta Bouteloua gracilis v. Hachita 2 2Poa sandbergii Pascopyrum smithii v. Rosanna 7 Festuca ovina v. Covar 3 7Elymus trachycaulus v. Pryor PLS/ACRE POUNDSBOTANICAL NAMECOMMON NAME SEED MIX REQUIRED LANDSCAPING TREES SHRUBS TOTAL REQUIRED:21 63 21 63 THIS DETAIL IS TYPICAL IN INTENT ONLY. CONTRACTOR SHALL ADJUST HIS ? SQUARE, OPEN TO THE SKY, AND NOT COVERED BY ANY PAVING OR GRATING. NOTE: THIS DETAIL ASSUMES THAT THE PLANTING SPACE IS LARGER THAN 8 FT. TREE PLANTING DETAIL - B&B TREES IN ALL SOIL TYPES ? ??????A MINIMUM OF THREE YEARS AFTER WORK TO ACCOMMODATE ALL CONDITIONS. UNDISTURBED SUBGRADE PLANTING.?? ? ? ? ??? ? ?? ?? ??? ?? ?? ? ? ? ? ? ? ? ? ? ? ? ? ? DECIDUOUS TREES: WRAP TRUNK W/4" TREE WRAP FROM BOTTOM UP TO FIRST BRANCH & SECURE. STAKE & GUY USING 2 STAKES SPACED 180°. EXTEND TO THE EDGE OF THE CROWN. THE TERMINAL BUDS OF BRANCHES THAT MAY BE PRUNED; HOWEVER, DO NOT REMOVE SOME INTERIOR TWIGS AND LATERAL BRANCHES LEADERS, AND BROKEN OR DEAD BRANCHES. PRUNE ONLY CROSSOVER LIMBS, CO-DOMINANT DO NOT HEAVILY PRUNE THE TREE AT PLANTING. TO FACE NORTH AT THE SITE WHEN EVER IN THE NURSERY, AND ROTATE TREE MARK THE NORTH SIDE OF THE TREE HIGHER IN SLOWLY DRAINING SOILS. SET TOP OF ROOT BALL FLUSH TO MAINTAIN THE MULCH WEED-FREE FOR MULCH IN CONTACT WITH TREE TRUNK. 3 IN. MULCH. DO NO PLACE GRADE OR 1-2 IN. POSSIBLE. ? 5 FT. DIAM. MIN. 8 IN. ? ? ? MULCH RING ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ?? ? ? ? ? ? ? ? ? ? ? ? ? ???? ? ? ? ? ?? ? ? ??? ?? ? REMOVE ALL TWINE , ROPE AND BURLAP FROM TOP HALF OF ROOT BALL THE ROOT BALL, CUT THE WIRE BASKET AND REMOVE. IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND ? SO THAT ROOT BALL DOES NOT SHIFT. BASE FIRMLY WITH FOOT PRESSURE TAMP SOIL AROUND ROOT BALL OR TAMPED SOIL. PLACE ROOT BALL ON UNEXCAVATED ? ? ? ?? ?? ? ? ?? ? ? ? ? ? ? ?? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ??? ?? EVERGREEN TREES: STAKE & GUY USING 3 STAKES @ 120° AROUND TREES. NO SPRAYING OR WRAPPING MAINTAIN UNDER ALL TOPO CONDITIONS APPROVED STAKE MATERIAL HARDWOOD STAKES OR OTHER 1.5 x 1.5 IN. TWIST WIRE TO TIGHTEN. GALVANIZED WIRE OR CABLE PLASTIC HOSE 0.5 IN. DIAM. DO NOT COVER THE TOP OF THE ROOT FLARE IS NOT VISIBLE SHALL BE REJECTED. OF THE ROOT BALL. TREES WHERE THE TRUNK THE TRUNK FLARE IS VISIBLE AT THE TOP EACH TREE MUST BE PLANTED SUCH THAT BEYOND EDGE OF ROOT BALL. 4 IN. HIGH EARTH SAUCER 4 ft. ? ? ?? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ?? ? ? ? ? ? ? ? ? ? ? ? ? 6 ft. BALL WITH SOIL. NOTE: PROTECT TREE WITH 5' TALL WIRE FENCING 1'-6" ABOVE GROUND. FENCE TO REMAIN UNTIL PLANT CAN SURVIVE WILDLIFE DAMAGE. EXCAVATE TREE PIT TO 2X BALL DIAMETER. LANDSCAPE PLAN CUSTOM CONTRACTING, INC. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 3 SHEET 2954.002 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN JULY 2020 JLR JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2020 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459 JLRAGENCY COMMENTS 08/03/202008/17/2020 JLRADD SEWER & WATER SERVICE09/01/2020 JLRREVISE PROPERTY ADDRESS09/15/2020 MAX STORAGE LANDSCAPE PLAN TBD MOUNTAIN VIEW CT. ESTES PARK, CO 80517 MAX STORAGE TBD MOUNTAIN VIEW CT. ESTES PARK, CO 80517 ESTES VALLEY DEVELOPMENT CODE §7.5.E-1: REQUIRES ONE TREE AND THREE SHRUBS TO BE PLNATED PER 1000 SF OF LOT COVERAGE EXCLUDING PARKING LOTS. (20,800 SF COVERAGE) ESTES VALLEY DEVELOPMENT CODE §7.5.F.2.b.(2)(c): STREET BUFFER NOT REQUIRED FOR CH-COMMERCIAL HEAVY ZONED PROPERTY ESTES VALLEY DEVELOPMENT CODE §7.5.G.2.a: PARKING LANDSCAPING NOT REQUIRED FOR CH-COMMERCIAL HEAVY ZONED PROPERTY SCALE 1"=20' M: \ C E S _ J o b s \ 9 5 4 _ 0 0 2 _ G r a n t C o l e S t o r a g e \ D e v e l o p m e n t \ M a x S t o r a g e l a n d s c a p e . d w g , 9 / 1 5 / 2 0 2 0 1 1 : 5 8 : 2 7 A M , J L R Page 45 16 ' - 0 " 8'x10' GARAGE DOOR 12'x16' GARAGE DOOR 8'x10' GARAGE DOOR 16 ' - 0 " 12'x16' GARAGE DOOR 12'x16' GARAGE DOOR 23 ' - 2 " 14'x12' GARAGE DOOR 14'x12' GARAGE DOOR 14'x12' GARAGE DOOR 8'x10' GARAGE DOOR 16 ' - 0 " 40'-0" 14'x12' GARAGE DOOR 14'x12' GARAGE DOOR 14'x12' GARAGE DOOR 12 4 0'-6" 14'x12' GARAGE DOOR 14'x12' GARAGE DOOR 14'x12' GARAGE DOOR 16 ' - 0 " 12 4 0'-6" EXISTING GRADE EXISTING GRADE BUILDING SCHEMATICS CUSTOM CONTRACTING, INC. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 3 SHEET 3954.002 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN JULY 2020 JLR JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2020 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. JLRAGENCY COMMENTS 08/03/202008/17/2020 JLRREVISE PROPERTY ADDRESS09/15/2020 EAST ELEVATION SCALE 1/8" = 1'-0" SOUTH ELEVATION SCALE 1/8" = 1'-0" WEST ELEVATION SCALE 1/8" = 1'-0" NORTH ELEVATION SCALE 1/8" = 1'-0" MAX STORAGE TBD MOUNTAIN VIEW CT. ESTES PARK, CO 80517 MAX STORAGE TBD MOUNTAIN VIEW CT. ESTES PARK, CO 80517 M: \ C E S _ J o b s \ 9 5 4 _ 0 0 2 _ G r a n t C o l e S t o r a g e \ D e v e l o p m e n t \ M a x S t o r a g e b a s e m a p . d w g , 9 / 1 5 / 2 0 2 0 1 1 : 5 6 : 4 0 A M , J L R Page 46 X X X X X X X X X X X X X X X X XX O H P 1800 SF FF=7590.75 7589.25 800 SF FF=7591.25 7590.25 800 SF FF=7592.25 7591.25 800 SF FF=7592.75 7592.25 1600 SF FF=7593.25 880 SF FF=7593.25 45.0 40 . 0 20.0 20 . 0 80 . 0 22 . 0 40.0 40.0 40 . 0 10' UTILITY & DRAINAGE EASEMENT 10' UTILITY & DRAINAGE EASEMENT 15' BUILDING SETBACK 11'± 15.9'± EXISTING 21" ELLIPTICAL CULVERT U.S.INV= 7682.33 D.S INV= 7680.62 (SEE NOTE #13) ACACIA DRIVE OH P OH P OH P 7700 7 6 9 5 76 9 5 7 6 9 5 7690 769 0 76 9 0 7 6 8 5 76 8 5 S 86°00'00" E 200.00' S 0 4 ° 2 5 ' 1 0 " W 2 8 . 9 6 ' N 0 0 ° 4 7 ' 2 0 " W 1 4 4 . 0 6 ' N 0 0 ° 4 8 ' 3 8 " W 1 5 0 . 2 1 ' N 48 ° 5 9 ' 0 5 " E 1 5 6 . 6 7 ' 3 2 .2 6 ''''''''''''''''''''''''''''''''''''''''' C H =S 8 7 °5 2 '1 6 " EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =5 7 0 .0 0 ''''''''''''''''''''''''''''''''''''''''' L =3 2 .2 6 ''''''''''''''''''''''''''''''''''''''''' D =3 °1 4 '3 5 """"""""""""""""""""""""""""""""""""""""" 6 4.50''''''''''''''''''''''''''''''''''''''''' C H =S 2 9°26'48" WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW R =75.00''''''''''''''''''''''''''''''''''''''''' L =66.67''''''''''''''''''''''''''''''''''''''''' D =5 0°56'06""""""""""""""""""""""""""""""""""""""""" 4 3 .2 5'''''''''''''''''''''''''''''''''''''''''C H =S 8 0 °4 9 '59" EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =6 0 .00''''''''''''''''''''''''''''''''''''''''' L =4 4 .25''''''''''''''''''''''''''''''''''''''''' D =4 2 °15 '06""""""""""""""""""""""""""""""""""""""""" 103.46''''''''''''''''''''''''''''''''''''''''' C H = N 18° 28'38" EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEE R =60.00''''''''''''''''''''''''''''''''''''''''' L=124.74''''''''''''''''''''''''''''''''''''''''' D =119° 07'17""""""""""""""""""""""""""""""""""""""""" LOT 5 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 7 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 4 ACACIA CORNER ZONED CH-COMMERCIAL HEAVY LOT 1 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY 60' PUBLIC RIGHT-0F-WAY 50' PUBLIC RIGHT-0F-WAY 44' 20.00 20' ASPHALT SURFACE EXI S T I N G W O O D R A M P 800 SF FF=7593.25 7593.25 20.0 20.0 20.0 20.0 800 SF FF=7591.75 7590.25 20 . 0 20 . 0 800 SF FF=7593.25 800 SF FF=7593.25 800 SF FF=7593.25 RO O F R I D G E EL = 7 6 1 6 . 4 ± 92.05 92.45 X 90.93X 90.03 88.63 X R10.00 R25.00 (7687.6)X (7687.2)X 90.96 89.48 X 6 . 1 5 % 5 . 7 8 % 88X 5.0% 1.50% 92.93X1.0% 4. 6 % 93.13X 93.13X 92.63 92.13 X 92.63 92.13 X 92.13 91.13 X 92.13 91.13 X 91.63 90.13 X 91.63 90.13 X 91.13 90.13 X 91.13 90.13 X 90.63 89.13 X 90.63 89.63 X 90.63 89.13XINV=90.97X INV=90.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X 93.13X R8.00 R25.00 5. 0 % (7687.7)X (7687.2)X (7686.1)X (7687.5)X (7687.6)X (7687.3)X ASPHALT SURFACE 9 6 S S S S S S T 9 7 9 8 9 8 9 5 9 4 9 3 9 2 91 90 89 88 91 90 92 93 93 9 2 92 91 95 96 9 4 9 5 97 INSTALLED CONCRETE CURB & GUTTER INSTALLED CONCRETE CURB & GUTTER 23' 14.4'± BUILDING 'A' INSTALLED SELF STORAGE UNITS EXISTING ASPHALT ROADWAY MOUNTAIN VIEW COURT EXISTING 8" SEWER MAIN INSTALLED RIPRAP DRAINAGE SWALE 19.50 (TYP.) 9.00 8.00 5.00 24.3 3 15' BUILDING SETBACK INSTALLED 5-FOOT SI D E W A L K W W W W W EX I S T I N G 6 " W A T E R L I N E 10' UTILITY & DRAINAGE EASEMENT INSTALLED 25 KVA TRANSFORMER EXISTING GUY-WIRE TO BE MODIFIED SS SS SS SS SS INSTALLED FIRE LINE & WATER SERVICE (FIRE LINE SIZE TO BE DETERMINED DURING FIRE SUPPRESSION DESIGN) INSTALLED 4" SEWER SERVICE 9 3 9 2 9 1 9 0 TOW 88.5 BOW 86 TOW 88.5 BOW 86 INSTALLED WATER QUALITY POND DETENTION BASIN 2 ~763 CF88 87 86 TOW 89 BOW 87 INSTALLED WATER QUALITY POND DETENTION BASIN 1 ~692 CF 92.30 92.72 X 92.05 92.27 X92.54X 1600 SF FF=7593.25 FG 94.0 X 93.0 X 93.0 X TOW 98.5 BOW 94.5 TOW 98.0 BOW 93.0 93 TOW 94.0 BOW 93.0 INSTALLED DRY-STACK ROCK WALLINSTALLED CONCRETE RETAINING WALL BUILDING 'B' INSTALLED SELF STORAGE UNITS 85 INSTALLED RECYCLED ASPHALT INSTALLED DRY STACK RETAINING WALL 88X 92.2 X 92.75 X 92.75 X 1.4% (MAX.) 12' B E T W E E N EAV E S 1. 4 % 2. 0 % (7687.4)X 5 . 4 3 % 89 2.5 5 % 1.32% 89 X INSTALLED 4-FOOT CONCRETE PAN INSTALLED CONCRETE PAN TO PROMOTE STORM FLOWS FROM ACACIA TO BE DIRECTED TO THE EXISTING CULVERT INSTALLED ACCESSIBLE RAMP W/ DETECTABLE WARNING INSTALLED 24" ASPHALT PATCH TBC 87.72X TBC 88.76X TBC 89.71X TBC 90.76X TBC 91.88X TBC 93.20X TBC 94.92X TBC 96.54X TBC 98.16X TBC 99.75X TBC 87.23X FL 86.42X FL 85.56X FL 84.88X FL 85.56X TBC 87.35 X TBC 86.76 X TBC 86.33 X TBC 86.31 X TBC 86.15 X SUBJECT PROPERTY LINE BUILDING SETBACK LINE EXISTING EASEMENT AS NOTED EXISTING INDEX CONTOUR EXISTING INTERMEDIATE CONTOUR W EXISTING WATER LINE S EXISTING SEWER LINE G EXISTING GAS LINE 5020 EXISTING TELEPHONE PED EXISTING POWER POLE EXISTING SEWER MANHOLE EXISTING TREE (TYP.) X X X X X X EXISTING FENCE PROPOSED SEWER CLEANOUT WOVEN GEOTEXTILE FABRIC MEETING: ASTM D4751-AOS US STD SIEVE #50 TO #70, ASTM D4633 MIN. TRAPEZOIDAL TEAR STRENGTH 100x60 LBS, MINIMUM COE SPECIFIED OPEN AREA OF 4% 4" Ø PERFORATED HDPE PIPE 3.0 FT. MIN. LINER OVERLAP 18" MIN. ASTM C 33 SAND WRAP ALL GEOTEXTILE FABRIC AND IMPERMEABLE LINERS TO THE TOP OF SAND LAYER. SECURLEY ATTACH TO WALLS OR SIDES OF BASIN. RIPRAP OUTLET PROTECTION 8" MIN. GRAVEL LAYER THAT MEETS CDOT SPECIFICATION 703 FOR AGGREGATE No. 3,4, OR 67. (AASHTO MR43 No. 3,4, OR 67) 3 D MIN. D 90.00 (#1) 85.00 (#2) 90.50 (#1) 85.50 (#2) 91.50 (#1) 87.00 (#2) SPILLWAY CREST OVERFLOW OUTLET TOP OF SAND FILTER 91.50 (#1) 87.00 (#2) TOP OF BERM 88.50 (#1) 83.50 (#2) BOTTOM OF SAND FILTER NONWOVEN GEOTEXTILE (SEE SPECIFICATION IN PROFILE VIEW) 4" 3" 8" M I N . GR A V E L LA Y E R 18 " M I N . AS T M C 3 3 SA N D 4" Ø PERF. HDPE PIPE PROJECT LOCATION SO U T H S A I N T V R A I N FIS H C R E E K R O A D 18-HOLE GOLF COURSE TO E S T E S PA R K TO A L L E N S PA R K PEAK VIEW DR. ACACIA DR. R Know what's below. Call before you dig. CALL 3-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. SITE PLAN CUSTOM CONTRACTING, INC. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 1 SHEET 1954.002 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN MAY 2021 JLR JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2023 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459 JLRBUILDING REVIEW MEMO DATED 12/06/202112/13/2021 JLRREVISE PARKING CURB12/20/2022 LEGEND: 6040200 SCALE 1" = 20' 20 MAX STORAGE 1748 MOUNTAIN VIEW CT. ESTES PARK, CO 80517 AS BUILT MAX STORAGE 1748 MOUNTAIN VIEW CT. ESTES PARK, CO 80517 SIDEWALK/CURB AND GUTTER TYPICAL DETAIL NOT TO SCALE FILTRATION POND DETAIL NOT TO SCALE TYP. FILTRATION POND SECTION NOT TO SCALE 1 1 JLRAS BUILT REVISIONS09/13/2023 Utilities: Water Town of Estes Park Electric Town of Estes Park Sewer Upper Thompson Sanitation District Gas Excel Telephone Century Link AVERAGE SLOPE = ~7.0% ALLOWABLE MAXIMUM NET DENSITY (UNITS/SF): GROSS/NET LAND AREA -36,850± SF 0.846± ACRES SITE LAND AREA COVERAGE STATISTICS COVERAGE % LOT (GROSS LAND AREA - 36,850± SF) PROPOSED LOT COVERAGE Buildings 12280 sf 33.32% Parking/Drives 10700 sf 29.04% Recycled Asphalt Surface 2520 sf 6.84% TOTAL IMPERVIOUS COVERAGE 25,500 sf 69.20% TOTAL OPEN SPACE 11,350 sf 30.80% SITE STATISTICS: 1) ZONING - CH- COMMERCIAL HEAVY 2) SETBACKS - 15 FEET FROM STREETS (25 FEET FROM ARTERIAL), 0 FEET FROM REAR AND 0 FEET FROM SIDES. 3) ALL EXTERIOR LIGHTING SHALL BE SHIELDED AND DOWNCASTING; (REFER TO ESTES VALLEY DEVELOPMENT CODE CHAPTER (EVDC) 7, SECTION 7.9 ). ALL STREET LIGHTS WILL NOT EXCEED 15 FT IN HEIGHT. 4) ALL DISTURBED AREAS WILL BE RESEEDED OR SODDED WITH NATIVE GRASSES/WILDFLOWER MIX. ALL NEW TREES AND SHRUBS WILL BE MAINTAINED IN A HEALTHFUL CONDITION. ALL AREAS WILL BE IRRIGATED. 5) TRASH ENCLOSURES WILL BE SCREENED WITH A SOLID FENCE AND ANIMAL RESISTANT. 6) CONTRACTORS MUST CALL UTILITIES NOTIFICATION CENTER OF COLORADO PRIOR TO EXCAVATING (1-800-922-1987). 7) THE BUILDING HEIGHT WILL BE WITHIN THE LIMITS SET FORTH IN THE REVISED HEIGHT MEASUREMENT PROVISION OF THE EVDC. 8) ALL INTERSECTIONS SHALL HAVE STOP SIGNS INSTALLED TO M.U.T.C.D. STANDARDS. 9) ALL REQUIRED IMPROVEMENTS SHALL BE COMPLETED OR GUARANTEED IN ACCORDANCE WITH EVDC 7.12 AND 10.5.K PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY 10) THE OWNER SHALL BE REQUIRED TO PROVIDE FOR HANDICAP ACCESSIBILITY IN ACCORDANCE WITH THE A.D.A., I.B.C. AND EVDC 7.11.J REQUIREMENTS. 11) CONTOURS ARE 1-FOOT INTERVAL. 12) CONDUITS, METERS, VENTS AND OTHER MECHANICAL EQUIPMENT ATTACHED TO THE BUILDING OR PROTRUDING FROM THE ROOF SHALL BE SCREENED, COVERED OR PAINTED TO MINIMIZE VISUAL IMPACT. 13)NOTICE FROM TOWN OF ESTES PARK PUBLIC WORKS (08/24/2020): IT IS ACKNOWLEDGED THAT THE EXISTING ELLIPTICAL CULVERT REQUIRES MAINTENANCE IN ORDER TO SERVE THE PROPOSED DEVELOPMENT. COORDINATION WITH PUBLIC WORKS DURING CONSTRUCTION WILL AIM TO RESTORE THE DOWNSTREAM CONVEYANCE CAPACITY. 14) WATER AND SEWER SERVICES SHOWN ARE INTENDED FOR POSSIBLE FUTURE USE (UTILITY SINK /HOSE BIBS). PROPOSED USE WILL BE DETERMINED PRIOR TO THE BUILDING PERMIT SUBMITTAL 15) THE MINOR MODIFICATION APPROVED IS FOR REVISING THE PROPOSED STRUCTURE, REDUCING THE STRUCTURE(S) FOOTPRINT. GENERAL NOTES: LOT 3A, AMENDED PLAT OF LOTS 3 & 4, MOUNTAIN TECHNOLOGICAL CENTER SUBDIVISION, COUNTY OF LARIMER, STATE OF COLORADO LEGAL DESCRIPTION: DJMC, LLC 1220 ACACIA DR. (TBD MOUNTAIN VIEW CT.) ESTES PARK, CO 80517 PROPERTY OWNER: NOT TO SCALE VICINITY MAP MAP TAKEN FROM TOWN OF ESTES PARK DIGITAL MAP AS-BUILT M: \ C E S _ J o b s \ 9 5 4 _ 0 0 2 _ G r a n t C o l e S t o r a g e \ A s - B u i l t \ M a x S t o r a g e f o u n d a t i o n F i n a l _ A S B U I L T . d w g , 9 / 1 3 / 2 0 2 3 2 : 5 9 : 1 7 P M , J L R Page 47 X X X X X X X X X X X X X X X X X XX O H P O H P 80 . 0 10' UTILITY & DRAINAGE EASEMENT 10' UTILITY & DRAINAGE EASEMENT 15' BUILDING SETBACK 11'± 15.9'± ACACIA DRIVE OH P OH P OH P 7700 7 6 9 5 76 9 5 7 6 9 5 7690 769 0 76 9 0 7 6 8 5 76 8 5 LOT 5 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 7 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY LOT 4 ACACIA CORNER ZONED CH-COMMERCIAL HEAVY LOT 1 MOUNTAIN TECHNOLOGICAL CENTER ZONED CH-COMMERCIAL HEAVY 60' PUBLIC RIGHT-0F-WAY 50' PUBLIC RIGHT-0F-WAY 44' 20.00 20' ASPHALT SURFACE EXI S T I N G W O O D R A M P ASPHALT SURFACE 9 6 S S S S S S T 9 7 9 8 9 8 9 5 9 4 9 3 9 2 91 90 89 88 91 90 92 93 93 9 2 92 91 95 96 9 4 9 5 97 23' 14.4'± BUILDING 'A' INSTALLED SELF STORAGE UNITS EXISTING ASPHALT ROADWAY MOUNTAIN VIEW COURT EXISTING 8" SEWER MAIN 19.50 (TYP.) 9.00 8.00 5.00 15' BUILDING SETBACK INSTALLED 5-FOOT SI D E W A L K W W W W W EX I S T I N G 6 " W A T E R L I N E 10' UTILITY & DRAINAGE EASEMENT SS SS SS SS SS 9 3 9 2 9 1 9 0 TOW 88.5 BOW 86 TOW 88.5 BOW 86 88 87 86 TOW 89 BOW 87 TOW 98.5 BOW 94.5 TOW 98.0 BOW 93.0 93 TOW 94.0 BOW 93.0 BUILDING 'B' INSTALLED SELF STORAGE UNITS 85 12' B E T W E E N EAV E S 89 INSTALLED 24" ASPHALT PATCH Amelanchier x grandiflora (Autumn Brilliance Serviceberry) 15/20 (2 TOTAL) Malus x 'Spring Snow' (Spring Snow Crabapple) 18/18 (2 TOTAL) Populus tremuloides (Aspen) 20/20 (3 TOTAL) Picea Pungens 'Baby Blue Eyes' (Baby Blue Spruce) 15/30 (3 TOTAL) Acer grandidentatum 'Schmidt' (Rocky Mountain Blow Maple) 15/20 (3 TOTAL) EXISTING TREE TO REMAIN (1 TOTAL) Juniperus sabina 'Buffalo' (Buffalo Juniper) 8/1 (7 TOTAL) Pinus mugo 'Slowmound' (Dwarf Mugo Pine) 8/5 (9 TOTAL) Ribes aureum (Golden Currant) 4/5 (8 TOTAL) Philadelphus microphyllus (Littleleaf Mockorange) 3/4 (8 TOTAL) Potentilla fruticosa 'Fargo' (Dakota Sunspot Potentilla) 3/3 (12 TOTAL) Amelanchier alnifolia 'Regent' (Regent Serviceberry) 6/6 (6 TOTAL) Shepherdia argentea (Silver Buffaloberry) 8/10 (7 TOTAL) Viburnum burejaeticus 'PO17S' (Mini-Man Viburnum) 4/4 (5 TOTAL) Spread (typ.) Height (typ.) Perovskia atriplicifolia (Purple Russian Sage) 3/3 (23 TOTAL) Thuja occidentalis 'Emerald Green' (Emerald Green Arborvitae) 4/14 (1 TOTAL) R Know what's below. Call before you dig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daho fescue Flanders poppy Blue flax Gaillardia Rocky Mtn. penstemon Black-eyed susan Blue grama Sandberg bluegrass Western wheatgrass Sheep fescue Slender wheatgrass 3Festuca idahoensis 27.20TOTAL Papaver rhoeas 0.1 Linum lewisii 0.5 Gaillardia aristata 1 Penstemon strictus 1.5 0.1Rudbeckia hirta Bouteloua gracilis v. Hachita 2 2Poa sandbergii Pascopyrum smithii v. Rosanna 7 Festuca ovina v. Covar 3 7Elymus trachycaulus v. Pryor PLS/ACRE POUNDSBOTANICAL NAMECOMMON NAME SEED MIX PLANTING LEGEND: REQUIRED LANDSCAPING TREES SHRUBS TOTAL REQUIRED:21 63 21 63 THIS DETAIL IS TYPICAL IN INTENT ONLY. CONTRACTOR SHALL ADJUST HIS ? SQUARE, OPEN TO THE SKY, AND NOT COVERED BY ANY PAVING OR GRATING. NOTE: THIS DETAIL ASSUMES THAT THE PLANTING SPACE IS LARGER THAN 8 FT. TREE PLANTING DETAIL - B&B TREES IN ALL SOIL TYPES ? ??????A MINIMUM OF THREE YEARS AFTER WORK TO ACCOMMODATE ALL CONDITIONS. UNDISTURBED SUBGRADE PLANTING.?? ? ? ? ??? ? ?? ?? ??? ?? ?? ? ? ? ? ? ? ? ? ? ? ? ? ? DECIDUOUS TREES: WRAP TRUNK W/4" TREE WRAP FROM BOTTOM UP TO FIRST BRANCH & SECURE. STAKE & GUY USING 2 STAKES SPACED 180°. EXTEND TO THE EDGE OF THE CROWN. THE TERMINAL BUDS OF BRANCHES THAT MAY BE PRUNED; HOWEVER, DO NOT REMOVE SOME INTERIOR TWIGS AND LATERAL BRANCHES LEADERS, AND BROKEN OR DEAD BRANCHES. PRUNE ONLY CROSSOVER LIMBS, CO-DOMINANT DO NOT HEAVILY PRUNE THE TREE AT PLANTING. TO FACE NORTH AT THE SITE WHEN EVER IN THE NURSERY, AND ROTATE TREE MARK THE NORTH SIDE OF THE TREE HIGHER IN SLOWLY DRAINING SOILS. SET TOP OF ROOT BALL FLUSH TO MAINTAIN THE MULCH WEED-FREE FOR MULCH IN CONTACT WITH TREE TRUNK. 3 IN. MULCH. DO NO PLACE GRADE OR 1-2 IN. POSSIBLE. ? 5 FT. DIAM. MIN. 8 IN. ? ? ? MULCH RING ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ?? ? ? ? ? ? ? ? ? ? ? ? ? ???? ? ? ? ? ?? ? ? ??? ?? ? REMOVE ALL TWINE , ROPE AND BURLAP FROM TOP HALF OF ROOT BALL THE ROOT BALL, CUT THE WIRE BASKET AND REMOVE. IF PLANT IS SHIPPED WITH A WIRE BASKET AROUND ? SO THAT ROOT BALL DOES NOT SHIFT. BASE FIRMLY WITH FOOT PRESSURE TAMP SOIL AROUND ROOT BALL OR TAMPED SOIL. PLACE ROOT BALL ON UNEXCAVATED ? ? ? ?? ?? ? ? ?? ? ? ? ? ? ? ?? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ??? ?? EVERGREEN TREES: STAKE & GUY USING 3 STAKES @ 120° AROUND TREES. NO SPRAYING OR WRAPPING MAINTAIN UNDER ALL TOPO CONDITIONS APPROVED STAKE MATERIAL HARDWOOD STAKES OR OTHER 1.5 x 1.5 IN. TWIST WIRE TO TIGHTEN. GALVANIZED WIRE OR CABLE PLASTIC HOSE 0.5 IN. DIAM. DO NOT COVER THE TOP OF THE ROOT FLARE IS NOT VISIBLE SHALL BE REJECTED. OF THE ROOT BALL. TREES WHERE THE TRUNK THE TRUNK FLARE IS VISIBLE AT THE TOP EACH TREE MUST BE PLANTED SUCH THAT BEYOND EDGE OF ROOT BALL. 4 IN. HIGH EARTH SAUCER 4 ft. ? ? ?? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ? ?? ?? ? ? ? ? ? ? ? ? ? ? ? ? 6 ft. BALL WITH SOIL. NOTE: PROTECT TREE WITH 5' TALL WIRE FENCING 1'-6" ABOVE GROUND. FENCE TO REMAIN UNTIL PLANT CAN SURVIVE WILDLIFE DAMAGE. EXCAVATE TREE PIT TO 2X BALL DIAMETER. LANDSCAPE PLAN CUSTOM CONTRACTING, INC. SHEET TITLE: BY:REVISION:DATE: CLIENT: SHEET 1 SHEET 1954.002 JOB NO.MST DATE SCALE APPROVED BY AS SHOWN SEPT 2023 JLR JLR MST DRAWN BY CHECKED BY DESIGNED BY PROJECT TITLE: 2023 CORNERSTONE ENGINEERING & SURVEYING, INC. COPYRIGHT - ALL RIGHTS RESERVED 1692 BIG THOMPSON AVE. SUITE 200 ESTES PARK, CO 80517 PH: (970) 586-2458 FAX: (970) 586-2459 JLRREVISE LANDSCAPE PLAN ADD'L DETAIL11/13/2023 MAX STORAGE 1748 MOUNTAIN VIEW CT. ESTES PARK, CO 80517 ESTES VALLEY DEVELOPMENT CODE §7.5.E-1: REQUIRES ONE TREE AND THREE SHRUBS TO BE PLNATED PER 1000 SF OF LOT COVERAGE EXCLUDING PARKING LOTS. (20,800 SF COVERAGE) ESTES VALLEY DEVELOPMENT CODE §7.5.F.2.b.(2)(c): STREET BUFFER NOT REQUIRED FOR CH-COMMERCIAL HEAVY ZONED PROPERTY ESTES VALLEY DEVELOPMENT CODE §7.5.G.2.a: PARKING LANDSCAPING NOT REQUIRED FOR CH-COMMERCIAL HEAVY ZONED PROPERTY SCALE 1"=20' AMENDED DEVELOPMENT PLAN MAX STORAGE 1748 MOUNTAIN VIEW CT. ESTES PARK, CO 80517 TREES SHRUBS 13 87 TOTAL REQUESTED:13 87 AMENDED Page 48 FULL CUTOFF WALL PACK SERIES GKOWPG2 10330 Argonne Woods Dr. Ste. 200 Woodridge, IL 60517 Phone: 630-793-9449 Web: www.gkoled.com Key Features Product Overview GKOWPG2 27W / 45W / 70W GKOWPG2 90W / 135W CONSTRUCTION: ■ Rugged die-cast aluminum housing. ■ Housing has direct contact with the driver to help maintain low temperature and long lifespan. ■ Housing is completely sealed against moisture and environmental contaminants. INSTALLATION: ■ Wall mount or junction box mount options are available. ■ Easy installation with integrated bubble level and hinged door. LIFESPAN: ■ Estimated 50,000-hour LED lifespan based on IES LM-80 results and TM-21 calculations. LISTINGS: ■ DesignLights Consortium® (DLC) Premium qualified. ■ UL listed for wet locations. ■ Rated for ambient operating temperature -40˚F to 104˚F (-40˚C to 40˚C). OPTICS: ■ Light engines are available in standard 4000K and 5000K configurations. ■ A range of lumen options available from 4,100 to 18,000 Lumens, replaces up to 400W metal halide. ■ Impact and UV-resistant polycarbonate lens is precisely designed to give a specific light distribution, maximizing efficiency and application spacing. ELECTRICAL: ■ Universal 120-277V input voltage. ■ THD: ≤20%, Power Factor: ≥90%. High performing, DLC Premium series GKOWPG2 Full Cutoff Wall Packs are an energy-efficient replacement for a traditional metal halide wall pack, up to 400W. The full cutoff design minimizes vertical light to reduce glare and light pollution. FINISH: ■ The exterior is protected by a rust-resistant powder coat finish that provides superior resistance to weathering and corrosion. ® ® E 488272 Page 49 10330 Argonne Woods Dr. Ste. 200 Woodridge, IL 60517 Phone: 630-793-9449 Web: www.gkoled.com Example:GKOWPG290W27V50KD Full Cutoff Wall Pack Series GKOWPG2 Fixture Type GKOWPG2 45W 27W 70W Wattage 27V 120-277V Voltage 40K 4000K 50K 5000K CCT D Dark Bronze Finish Perfomance Data Lumen Output Lumens Efficacy Efficacy Lumens 120-277V 120-277V 120-277V 147lm/W 152lm/W 6600lm 4100lm 147lm/W 152lm/W 6600lm 4100lm 141lm/W9900lm 141lm/W9900lm 45W 27W 70W 5000K(70CRI)4000K(70CRI) 120-277V 120-277V 136lm/W12200lm 136lm/W12200lm 133lm/W18000lm 133m/W18000lm 90W 135W System Watts Voltage 90W 135W Dimensions & Weight Net Weight 45W: 5.98lb 27W: 5.77lb 70W: 6.16lb Note: Not all product variations listed on this page are DLC qualified. Visit www.designlights.org/search to confirm qualification. Ordering Information ® GKOWPG2: 27W & 45W & 70W GKOWPG2: 90W & 135W Net Weight 90W: 10.48lb 135W: 10.95lb 9. 2 5 i n . 14.21in. 7. 9 9 i n . 9. 7 5 i n . 9. 0 2 i n . 18.1n. Page 50