Loading...
HomeMy WebLinkAboutPACKET Transportation Advisory Board 2023-01-181/13/2023 TRANSPORTATION ADVISORY BOARD January 18, 2023 12:00 p.m. REGULAR MEETING Town Hall | Room 202 AGENDA In-Person Meeting | Board, Staff, and Public 12:00 pm Public Comment 12:05 pm Trustee Liaison Update Trustee Martchink 12:10 pm Approval of Minutes dated December 21, 2022 (packet) 12:15 pm Complete Streets Policy Report (packet) Manager Hook 12:25 pm Multi-Modal Trails & Signage (packet) Chair Morris 12:35 pm Mobility Services Updates (packet) Manager Solesbee 1:20 pm Engineering Update Director Muhonen 1:35 pm Administration Updates Director Muhonen 1:50 pm 2023 TAB Officers Election 1:58 pm Other Business Adjourn 1       2 Town of Estes Park, Larimer County, Colorado, December 21, 2022 Minutes of a Regular meeting of the TRANSPORTATION ADVISORY BOARD of the Town of Estes Park, Larimer County, Colorado. Meeting held in the Municipal Building in said Town of Estes Park on the 21st day of December, 2022. Board: Chair Belle Morris; Vice-Chair Kristen Ekeren; Members Javier Bernal, Jessica Ferko, Ann Finley, Larry Gamble, Linda Hanick, Mark Igel, and Gordon Slack; Trustee Patrick Martchink; Staff Liaison Greg Muhonen Attending: Chair Morris, Vice-Chair Ekeren; Members Bernal, Ferko, Gamble, Hanick, Igel, and Slack; Managers Hook and Solesbee; Trustee Martchink; Director Muhonen, Recording Secretary McDonald; Jeff Bailey, Public Works Engineer; Presenters Ryan Burke and Melita Pawlowski, Slate Communications; Tom Hannah, Public Attendee Absent: Member Finley Chair Morris called the meeting to order at 12:17 p.m. Prior to commencement of the official agenda, Director Muhonen thanked TAB members for their 2022 service. An appreciation lunch was available during the meeting. PUBLIC COMMENT Tom Hannah (Resident) expressed support of the Town’s work in exploring different traffic patterns on one-way streets in the Reclamation Neighborhood area. He also expressed safety concerns about the crosswalk at Highway 7 and First Street, where signage is difficult for drivers to see. TRUSTEE LIAISON UPDATE Trustee Martchink did not provide an update. APPROVAL OF MINUTES DATED NOVEMBER 16, 2022 It was moved and seconded (Gamble/Hanick) to approve the November 16, 2022, minutes with minor amendments, and the motion passed unanimously. DOWNTOWN WAYFINDING PLAN Manager Hook referenced the November 11 Downtown Wayfinding Signage Program – Design & Implementation Plan (DWP) that was presented at the TAB’s November 16 meeting. Plan review by the Colorado Department of Transportation (CDOT) revealed concerns about the language and icon use on type 7 signs in CDOT right-of-way, which do not comply with their wayfinding standards defined in the Manual on Uniform Traffic 3 Transportation Advisory Board – December 21, 2022 – Page 2 Control Devices (MUTCD). The DWP has been adjusted to eliminate directions to name- specific local destinations, since such specific language is reserved for brown signs signifying state and national resources. Manager Hook will redline CDOT’s specifications about its ROW signage guidelines in the DWP for reference when the affected signage nears its implementation phase. Structural member accommodations will also be made to address CDOT concerns. There was brief discussion about the need for improved signage prohibiting electric scooters and skateboards on sidewalks; this can best be addressed by adequate signage in the dismount zone, but further options can be discussed if such signage is ineffective. Member Hook anticipates bringing the DWP to the Town Board for adoption on January 24. CLEAVE STREET IMPROVEMENTS Engineer Bailey referred to the “Key Features” page of his presentation as the most illustrative and dynamic design for Cleave Street’s parking and ADA considerations. Transformer boxes will be moved to the south side of the street. Duct bank and gas lines will be moved at the expense of CenturyLink. The Town Board is receptive of the current plans but requests that dumpsters be consolidated and managed by the Town. The 90% plan is expected in January, barring utility work delays. TRANSIT BRANDING PROJECT KICK-OFF & VISIONING EXERCISE Manager Solesbee invited Slate Communications presenters Ryan Burke (Founder/Storyteller) and Melita Pawlowski (Communications Specialist) to introduce themselves and launch an interactive, Mentimeter visioning survey as phase one for the Estes Transit branding project. The goals of the Slate team, which has already begun stakeholder meetings, are to increase awareness of Estes Transit; develop a name and brand that define its identity and value to riders; and ensure that awareness leads to increased ridership during the 2023 visitor season. Discussion points included Estes Park’s “adventurous and outdoorsy” identity as the gateway community to Rocky Mountain National Park (RMNP), and the general symbiotic relationship between the town and the park; the “car-centric” nature of residents and visitors; the lack of connection between many of the area’s destinations; the community’s need for some respite from tourism crowds during the off-season; the lack of ease and convenience for people who wish to avoid driving and parking once they arrive; the need for consistency and understanding of weekday and weekend transit schedules from season to season; what resources are used by the average person planning to visit the area; what can be learned from transit systems in Colorado’s ski areas, with consideration for the Town’s comparably inferior funding resources; how families could be better served to promote utilization of Estes Transit; and educational opportunities about transit offerings and the general walkability of the area, especially from the parking structure. It was agreed that Estes Park’s ideal future would see greater and balanced use of public transportation by locals and visitors, and increased options for on-demand transit— particularly in light of the preferences and habits of millennials and following generations. MOBILITY SERVICES UPDATES 4 Transportation Advisory Board – December 21, 2022 – Page 3 Manager Solesbee advised that a February 14 Town Board Study Session would focus on coordinating regional transit along US 34 with Loveland, Greeley, and Fort Collins; the TAB will be provided further information between now and then. The 2022 Transit Report will be presented in January; the 2023 transit service will be presented to the TAB once updated hourly pricing is received from the Town’s contracted service provider. The Town typically “piggybacks” off Rocky Mountain National Park’s (RMNP) transit service contract, and that 2023 contract is still in process. The Parking Revenue Task Force plans its third meeting in January; thus far, discussions have focused on the desire for more parking spaces, improved communication about real-time parking availability, and expanded transit services. At a December 13 Town Board Study Session, staff’s recommendation to hold the parking program steady—stabilizing fees with operational improvements—was well-received, and a resolution to set 2023 parking fees will be presented in January; the TAB will be asked for a letter of support. The second trolley is in service as the “Jolly Trolley, and the battery life is keeping up with the season’s demands; the first trolley is still here and functioning but should return to the manufacturer next week for necessary repairs. DOWNTOWN ESTES LOOP & COMMUNITY DRIVE ROUNDABOUT Director Muhonen advised that the Downtown Estes Loop preconstruction meeting with Flatiron Construction will take place January 12. The Community Drive Roundabout bid opening was December 12; the one bid exceeded the engineer’s estimate by $1100, and CDOT is now reviewing the package for concurrence to award. Town crews will handle electrical and landscaping work. Staff will seek Town Board approval of the contract on January 28, and construction would begin mid-February for completion in June. ENGINEERING & ADMINISTRATION UPDATES Director Muhonen advised that the succeeding Town Engineer position is still open. Manager Hook advised that the new Civil Engineer starts January 9 and will attend the January 19 TAB. Construction of the Fall River Trail Extension begins the first week of January. The Graves Avenue – Safe Routes to School project is moving along. There are 10-12 bidding and design projects on deck for 2023, and grants for several projects are in motion. OTHER BUSINESS None. There being no further business, Chair Morris adjourned the meeting at 1:51 p.m. Lani McDonald, Recording Secretary 5       6 Public Works Engineering Streets Facilities Fleet Parks Parking & Transit 970-577-3587 publicworks@estes.org 170 MACGREGOR AVE. P.O. BOX 1200, ESTES PARK CO. 80517 WWW.ESTES.ORG PUBLIC WORKS Memo To: Transportation Advisory Board From: Trevor Wittwer, EIT, Civil Engineer David Hook, PE, Engineering Manager Date: January 18, 2023 RE: Complete Streets Policy Annual Report for 2022 The Complete Streets Policy helps promote the development of a multi-modal transportation network that will provide access to all users. The policy indicates that tracking and reporting should be done over the course of a project. This policy was implemented throughout the design stages of several projects in 2022. Reporting Data: 1. Number of projects completed: 1 (one) final design completed in 2022  Fall River Trail Extension (TAP & MMOF) – see attached final checklists for Complete Streets and Traffic Calming 2. Number of projects incorporating complete streets infrastructure: 3 (three) during design development  Fall River Trail Extension (TAP & MMOF) – final design completed in 2022  Cleave Street Improvements – not yet at final design  Graves Avenue (SRTS) – not yet at final design  Fall River Trail (CtB) – not yet at final design 3. Number of transit and non-motorized users:  Fall River Trail will add transit and non-motorized user features that will increase users along the US34 corridor  Cleave Street Improvements will add non-motorized user features that will increase users of the corridor  Graves Avenue will add non-motorized user features that will increase users of the corridor The overall community perception of all three projects listed above was positive feedback specifically for addressing a multimodal use and including Complete Streets infrastructure. The Transportation Advisory Board is encouraged to provide ongoing feedback and act as a conduit for public participation on the implementation of Complete Streets practices. Attachments: Policy 851 – Complete Streets Final Complete Streets Checklist for Fall River Trail (TAP & MMOF) Final Traffic Calming Guidelines for Fall River Trail (TAP & MMOF) 7 Effective Period:Until Superceded Review Schedule:Annual Effective Date:April 23,2019 References:Downtown Plan PUBLIC WORKS 851 Complete Streets Engineering Division 1.PURPOSE This policy establishes practices within the Public Works Department to promote and encourage the development of a multi-modal transportation network that will provide access to all users.Through the application of Complete Streets principles,we will provide comprehensive,safe,convenient,and comfortable routes for walking,bicycling, and public transportation.This will encourage active living lifestyles,wellness,reduce traffic congestion,reduce noise and air pollution,and improve the safety and quality of life of Estes Park residents and visitors. 2.POLICY The Town of Estes Park Complete Streets Policy is attached as Appendix 1. 3.PROCEDURE The attached Complete Streets Policy includes procedures to implement the policy (Section 2),procedures to track &report application of the policy over time (Section 3), a Complete Streets Checklist (Exhibit A),and Traffic Calming Guidelines (Exhibit B). Approved: Todd Jirs ,Mayor ‘-‘las!,, Date Document Title Final 4/23/19 Revisions:0 Town of Estes Park,Public Works Page 1 of 6 8 APPENDIX I -Town of Estes Park Complete Streets Policy Statement of Intent: The Town of Estes Park,through the adoption of this Complete Streets Policy,intends to promote and encourage the development of a multi-modal transportation network that will provide access to all users. Introduction Complete Streets are streets for everyone.A Complete Streets approach integrates people and place in the planning,design,construction,operation,and maintenance of our transportation networks.This helps to ensure streets are safe for people of all ages and abilities,balance the needs of different modes,and support local land uses,economies, cultures,and natural environments.Complete Streets make it easy to cross the street,walk to shops,and bicycle for work,play,shopping,and recreation. A Complete Streets Policy allows planners and designers to understand and meet the actual mobility needs of every community member,however,they travel -by foot,bicycle,scooter, skateboard,shuttle or automobile.A Complete Street ultimately encourages all community members to utilize mobility options to access destinations such as schools,downtown businesses,neighborhoods and recreation areas.This makes it easier for shuttles to run on time and make it safe for people to walk to and from parking areas such as the Visitor Center Parking Structure. Every transportation project that implements the Complete Streets approach will make the multi-modal transportation network better and safer for motorists,drivers,transit riders, pedestrians,and bicyclists,thus making the town a better place to live and visit. Policy 1.DEFINITIONS:The following words and phrases,whenever used in this Policy,shall have the meanings defined in this section unless the context clearly requires otherwise: a.Complete Street Infrastructure:According to the National Complete Streets Coalition,appropriate elements that make up a complete street would include sidewalks,bicycle lanes,shared use paths,designated transit lanes,safe and accessible transit stops,safe crossings for pedestrians (including median islands),grade separated crossings (i.e.underpasses or overpasses), accessible pedestrian signals,and curb extensions.Additionally,they include Document Title Final 4/23/19 Revisions:0 Town of Estes Park,Public Works Page 2 of 6 9 features identified in the Estes Valley Trails Master Plan and the Estes Park Downtown plan. b.“Street”includes streets,avenues,boulevards,road,lanes,alleys,and all public ways. c.“Street Project”means the capital construction or capital reconstruction of any street,whether by the public or private sector,and includes the planning, design,approval,and implementation processes.Operation and maintenance (O&M)based projects are excluded. d.“Multi-modal Transportation Network”means all facilities,vehicles and devices designed to facilitate the mobility of people. e.“Users”are individuals who use the Multi-modal Transportation Network. Categories of Users include pedestrians,bicyclists,motor vehicle drivers, public transportation riders and people of all ages and abilities. 2.IMPLEMENTATION. a.The Town of Estes Park shall consider every Street Project an opportunity to incorporate the principles of Complete Streets. b.The Town of Estes Park will work in coordination with other organizations,agencies, and jurisdictions to achieve safe,convenient and connected Complete Streets infrastructure within the Multi-modal Transportation Network. c.This policy will be used as a guide to the Town of Estes Park in development of transportation plans,transit plans,and design standards.As practicable,these documents and tools will be updated to reflect this Complete Streets Policy. d.Implementation of the Complete Streets Policy will consider the adjacent neighborhood,completion of the multi-modal network,priority corridors,and the financial costs of the Complete Street elements. e.The Complete Streets Checklist at Exhibit A below will be used in planning,design and construction or reconstruction of all transportation projects. f.Public works will present to the Transportation Advisory Board,CDOT (for proposed work within the CDOT right of way),and to the general public at neighborhood meetings all street reconstructions,modifications,and construction projects at the 30%preliminary design stage and 90%final design stage.When the proposed street work is at a location governed by the Complete Streets Policy,the presentation will include the Complete Streets Checklist results,recommended design cross-section,alternative improvements,if any,construction cost estimates for each alternative,clarification of maintenance responsibility,and estimated maintenance costs. g.Implementation of relevant parts of the Downtown Plan will also be considered in the implementation of this policy. Document Title Final 4/23/19 Revisions:0 Town of Estes Park,Public Works Page 3 of 6 10 h.Public works will encourage projects undertaken by other public agencies and private sector development to follow this policy. i.Exceptions to this policy for any Street Project can only be granted with the approval of the Public Works Director and the Town Administrator after coordination with the Transportation Advisory Board. 3.DATA COLLECTION AND PROGRESS REPORTING a.The Town will periodically collect,review and report performance data and benchmark measurements to demonstrate the effectiveness of this policy.This will include:number of projects completed,number of projects incorporating complete streets infrastructure, actual infrastructure added,number of transit and non-motorized users,and community attitudes and perceptions. b.The Transportation Advisory Board and the Shuttle Committee are encouraged to provide ongoing feedback and act as a conduit for public participation on the implementation of Complete Streets practices. DocumentTitle Final 4/23/19 Revisions:0 Town of Estes Park,Public Works Page 4 of 6 11 Exhibit A Complete Streets Checklist 1.Existing Conditions: a.What accommodations for bicycles,pedestrians,and transit are included in the existing facility and on facilities it intersects or crosses? b.If there are not pedestrian or bicycle facilities and transit,how far from the proposed project are the closest parallel walkways and bicycle facilities? c.Are there existing impediments for bicycle,transit,and pedestrian travel that the proposed project could address? d.What current or future trip generators are in the vicinity of the proposed project that could potentially attract more pedestrians,bicyclists,employees,transit or users of other travel modes? e.Did the project design consider conflicts between users of different modes of travel, including bicyclists,pedestrians,motor vehicles,transit or others? f.Do any previously adopted plans call for the installation of bicycle or pedestrian facilities such as bike or multi modal lanes on,crossing,or adjacent to the proposed facility?If yes,list the applicable plans. 2.Project Scope h.What accommodations,if any,are included for bicycle,pedestrians,and transit in the proposed project design? i.If the proposed project does not include bicycle and pedestrian facilities,list reasons. j.State the cost of the bicycle and pedestrian facilities and their proportion of the total project cost. k.What entity or district will be responsible for the maintenance of the bicycle and pedestrian facilities and how will they be budgeted? I.To what extent does the project include steps to calm traffic as outlined in the attached traffic calming guidelines at Exhibit B. DocumentTitle Final 4/23/19 Revisions:0 Town of Estes Park,Public Works Page 5 of 6 12 Exhibit B Traffic Calming Guidelines The following guidelines are not intended to be exhaustive but to give policymakers,the general public,planners,and designers a general idea of what traffic calming is about.For example,more detailed guidance and ideas can be found in the publication from The Institute of Transportation Engineers’(ITE)entitled Traffic Calming:State of the Practice.This defines traffic calming as “the combination of mainly physical measures that reduce the negative effects of motor vehicle use,alter driver behavior and improve conditions for non-motorized street users.” Suggested road designs that say slow down 1.Design roads that create a subconscious need to slow down. 2.Design roads that incorporate artifacts that encourage people to slow down. 3.Create roadways that make vehicle users feel uncomfortable to speed down residential roads. 4.Create roadways that have narrow lane width. 5.Add trees,garden plots,sculptures and benches along roadway shoulders to create calm and visual enjoyment for all users. 6.Add physical design of road signs. 7.Trees,bike lanes,and sidewalks included in designs. 8.Consider alternatives to traffic lights at intersections such as roundabouts to improve traffic flow and calming. Document Title Final 4/23/19 Revisions:0 Town of Estes Park,Public works Page 6 of 6 13 1 Complete Streets Checklist PROJECT: Fall River Trail (TAP & MMOF) Final 1-12-23 1. Existing Conditions: a. What accommodations for bicycles, pedestrians, and transit are included in the existing facility and on facilities it intersects or crosses? Answer: Currently there are no accommodations for bicycles, pedestrians, and limited transit improvements on the segment of Fall River Road from current Fall River Trail endpoint west of Sleepy Hollow Court to Fish Hatchery Road (where another previously constructed portion of the trail extends to the Rocky Mountain National Park boundary). The proposed TAP and MMOF project will complete this next segment (approximately a half mile) of the multiuse path and includes construction of transit facilities (bus pad). In addition, the future Colorado the Beautiful segment of the Fall River Trail construction will provide additional transit improvements in the form of bike racks, pedestrian waiting pad, and sitting benches at the bus pad constructed as part of the TAP and MMOF segment. b. If there are not pedestrian or bicycle facilities and transit, how far from the proposed project are the closest parallel walkways and bicycle facilities? Answer: Currently there are no existing parallel walkway or bicycle facilities within this segment of Fall River Road, but this project will be an extension from the existing trail terminus along Fall River Road. c. Are there existing impediments for bicycle, transit, and pedestrian travel that the proposed project could address? Answer: Yes. Due to inadequate shoulder width, heavy seasonal traffic, and lack of any parallel bike and pedestrian facilities, there are currently severe safety impediments to pedestrians and bicyclist who wish to traverse this segment of Fall River Road. Although there is currently bus/transit service on Fall River Road, there are no improved facilities with buses pulling partially out of traffic onto gravel shoulders, and no facilities or improvements for waiting riders. This current lack of transit improvements is a safety and use impediment for transit travel on this portion of Fall River Road. d. What current or future trip generators are in the vicinity of the proposed project that could potentially attract more pedestrians, bicyclists, employees, transit or users of other travel modes? Answer: Residents and visitors to Estes Park, including ownership and rental units along and above the MMOF and TAP segment are expected to generate much of the foot, bike, transit, and other travel modes trips on the proposed facility, along with trips generated by people traveling to and from Rocky Mountain National Park’s (RMNP) Fall River Entrance. RMNP boundary is 2.5 miles from where the current trail ends, and is the fifth most visited national park in the U.S. In addition, a future project to add workforce housing in the form of a moderately sized multi-family development on Fish Hatchery Road will be expected to generate significant future pedestrian, bicycle and transit trips. 14 2 e. Did the project design consider conflicts between users of different modes of travel, including bicyclists, pedestrians, motor vehicles, transit or others? Answer: Yes. The proposed multiuse path will cross several private drives and lanes where potential conflicts with motorized vehicles might be created, however the path will be made prominent by using colored concrete, and signage to reduce potential vehicular conflicts. In addition, in locations where the path is directly adjacent to Fall River Road (not separated by a landscape strip), a retaining wall and crash railing will protect trail users and prevent conflicts with vehicles on Fall River Road. f. Do any previously adopted plans call for the installation of bicycle or pedestrian facilities such as bike or multi modal lanes on, crossing, or adjacent to the proposed facility? If yes, list the applicable plans. Answer: Yes. Fall River Trail, including the MMOF and TAP segment, have been shown on the Estes Valley Master Trails Plan and maps since the master plan was adopted in 2016. Completion of the Fall River Trail from the Town to Rocky Mountain National Park has been identified as a top priority for funding and completion. 2. Project Scope h. What accommodations, if any, are included for bicycle, pedestrians, and transit in the proposed project design? Answer: The proposed project design provides needed accommodations primarily for bicycles, pedestrians, and transit. The project will provide a grade separated, 10-foot-wide concrete multiuse path for pedestrians and bikes, and a full concrete bus pullout for transit riders. A later segment construction (Colorado the Beautiful) will add bike racks, sitting benches, and a surfaced pedestrian waiting pad to the bus pullout facility. Safety improvements will include pedestrian railings adjacent to steep slopes and a wall/guardrail system to separate the trail from Fall River Road where it is directly adjacent to the road. i. If the proposed project does not include bicycle and pedestrian facilities, list reasons. Answer: The proposed project includes bicycle and pedestrian facilities. j. State the cost of the bicycle and pedestrian facilities and their proportion of the total project cost. Answer: Currently the estimated total project cost is $2,083,130 (Segment A+B) with close to 100% of the budget based on construction of the proposed multiuse path and related transit improvements. k. What entity or district will be responsible for the maintenance of the bicycle and pedestrian facilities and how will they be budgeted? Answer: The Town of Estes Park will be responsible for maintenance of the facility and is expected to be budgeted as part of the Town’s annual budget. I. To what extent does the project include steps to calm traffic as outlined in the attached traffic calming guidelines at Exhibit B. Answer: By designing a separated muti-use path facility (rather than attached bikeway lanes), the existing lane widths and shoulders of Fall River Road will remain unchanged. The separated facility allows landscaping and other roadside features such as mailboxes to be maintained or replaced along Fall River Road. By bringing these features close to the roadway and not increasing the width of the existing roadway lanes and shoulders, vehicular drivers on the road will be encouraged to slow down and typically feel uncomfortable driving at higher speeds. 15 Traffic Calming Guidelines PROJECT: Fall River Trail (TAP & MMOF) Final 1-12-23 Suggested road designs that say slow down: 1. Design roads that create a subconscious need to slow down. N/A 2. Design roads that incorporate artifacts that encourage people to slow down. N/A 3. Create roadways that make vehicle users feel uncomfortable to speed down residential roads. a. Retaining walls, guardrails and pedestrian railings associated with the trail between the road and the trail will give vehicles on US34 the feeling that the roadway is narrower and encourage slower driving speeds. 4. Create roadways that have narrow lane width. a. N/A 5. Add trees, garden plots, sculptures and benches along roadway shoulders to create calm and visual enjoyment for all users. a. Amenities such as bike racks, benches, and concrete transit pads will be constructed along the trail and transit stops. 6. Add physical design of road signs. N/A 7. Trees, bike lanes, and sidewalks included in designs. a. The 10-foot-wide multimodal trail will be grade separated from the road. 8. Consider alternatives to traffic lights at intersections such as roundabouts to improve traffic flow and calming. N/A 16 17 18 19 @CompleteStreets Implementing Context Sensitive Design 20 PUBLIC WORKS Memo To: Honorable Mayor Wendy Koenig Board of Trustees Through: Town Administrator Machalek From:Vanessa Solesbee, CAPP, CCTM, Mobility Services Manager Greg Muhonen, PE, Public Works Director Date:February 14, 2023 ARE:Resolution xx-23 Establishing 2023 Seasonal Paid Parking and Parking Permit Fees PUBLIC HEARING ORDINANCE LAND USE CONTRACT/AGREEMENT RESOLUTION OTHER______________ QUASI-JUDICIAL YES NO Objective: Adopt Resolution xx-23 to establish 2023 seasonal paid parking and parking permit fees. Present Situation: At a Town Board Study Session (TBSS) on December 13, 2022, Public Works (PW) staff presented detailed results from the 2022 paid parking season and recommendations for the 2023 paid parking program. This initial presentation included a summary of parking occupancy and turnover, parking permit utilization, public outreach efforts and operational improvements implemented for the 2022 guest season. During that presentation, PW staff acknowledged that the downtown community will be impacted by two significant improvement projects in the coming year (Downtown Estes Loop and Cleave Street Improvements). With the uncertainty about the impact of these two projects and the anticipated loss of two heavily-used gravel parking areas, Public Works staff recommend focusing the 2023 paid parking program on improving the existing operation and customer experience rather than expanding the program and/or raising parking fees. Since the 12/13 TBSS, PW staff held the final of three meetings of the Parking Revenue Task Force. This short-term task force was assembled in November 2022 and participants included: Colleen DePasquale (Estes Chamber), Rebecca Gelsinger (Visit Estes Park), John Krueger (Estes Valley Library Board of Directors), Carissa McGill 21 (Simply Christmas), Rachel Rohrig (Lofts of Estes), Ann Finley (Transportation Advisory Board, TAB), Gordon Slack (TAB), Jessica Ferko (TAB), Greg Muhonen (Town), Dana Klein (The Car Park/Town) and Vanessa Solesbee (Town/Facilitator). Todd Jirsa (Village Goldsmith) attended the final meeting as substitute for Ms. McGill. The task force process, results from the group’s multiple homework assignments and results are included in the Attachments. In brief summary, the group agreed that 45% of paid (roughly $190,000) parking net revenues should be spent on additional parking supply, 45% (roughly $190,000) on maintaining, and if possible, expanding the Town’s transit service and 10% (roughly $40,000) would be retained as a reserve. Proposal: To continue the seasonal paid parking program for the 2023 summer guest season as follows:  May 26 – October 22, 2023  10 a.m. to 5 p.m., Monday through Sunday  $2 per hour  682 total spaces in the following same eight public parking areas as 2022: Town Hall, Bond Park, E. Riverside, Riverside, Virginia, Post Office, Wiest and Tregent. Additionally, as in 2022:  69% of all public parking in Estes Park and 33% of parking in the downtown core will remain free.  All spaces with persons for disabilities will remain free and without time limit.  Vehicles displaying Americans with Disabilities (ADA) placards or Disabled Veterans (DV) license plates will continue to be exempt from paying parking fees in Town-owned parking spaces.  Motorcycles parking in designated motorcycle parking spaces will continue to be exempt from paying parking fees  Town Hall, the Estes Valley Library and the Post Office will continue to have dedicated spaces without charge for patrons.  Residents/locals who live in the Estes Park School R-3 District will continue to be eligible for 60 minutes of free parking each day in the paid parking areas. Advantages:  Seasonal paid parking continues the Town’s commitment to implementation of the Board-adopted Downtown Parking Management Plan and the four objectives of the paid parking program contained in Chapter 10 of the Estes Park Municipal Code.  Implementation is designed to accommodate diverse user groups (locals, visitors and employees), is phased/incremental, and is in line with other Colorado communities that are supported by tourism-driven economies.  Paid parking fees will continue to reduce future reliance on the General Fund for parking management, future parking infrastructure (e.g., new parking structure downtown) and the heavily subsidized Town’s free shuttle service (Estes Transit). 22 Disadvantages:  Implementation of seasonal paid parking has been vocally opposed by some residents and business owners; however, staff will continue our commitment to working with all stakeholders to create the best possible parking experience for locals and visitors. Action Recommended: PW staff recommends the Town Board adopt Resolution xx-23 Establishing 2023 Paid Parking and Parking Permit Fees Finance/Resource Impact: Current Impacts: The current Parking Fund (256) balance is $270,274. As in 2021, the 2022 program has met its financial goals, including: 1. Program costs were fully covered by program fees; 2. The Parking Fund will be able to “repay” the General Fund for the 2022 Parking Division base budget; and 3. Net revenues in the amount of $150,000 - $160,000 will be added to the Parking Fund. Future Impacts: After the first two years of seasonal paid parking, the Parking Fund balance should be approximately $420,274 - $430,274. Due to the timing of the Town’s annual budgeting process, staff projected no significant changes to the 2023 paid parking program with $838,875 in anticipated revenue for the Parking Fund (256), including paid parking fees, permits, citations and special events. Expenses were conservatively projected at $811,215 for net revenues of $27,660. Based on the results of the Parking Revenue Task Force, PW staff propose to use existing net paid parking revenues (from the Parking Fund, 256) in the following ways: 1) contract design of a second level of public parking on the Big Horn parking lot, 2) once 2023 transit operating costs are known, define the amount of additional funding needed to maintain existing annual service levels for Estes Transit, and possibly, if funding allows, expand downtown trolley service hours to better accommodate employees, and 3) set aside 10% of the Fund as a reserve. Level of Public Interest Public interest in seasonal paid parking continues to be moderate. Opinions about how downtown parking should be used, managed and/or not managed at all—and who should have access to those spaces—varies widely. The Transportation Advisory Board (TAB) was engaged in discussions about options for the 2023 Paid Parking Program over the course of several meetings in Fall 2022. While opinions vary among the group members about whether the program should be held steady or begin incremental growth in 2023, as supported by 2021 and 2022 parking data, TAB submitted a letter in support of the PW staff recommendation. Sample Motion: I move for the approval/denial of Resolution #xx-23. Attachments: 23 1 Resolution #xx-23 Establishing 2023 Paid Parking and Parking Permit Fees 2 Public Works Policy 842 Revision 3 3 Parking Revenue Task Force Meeting Materials & Group Discussion Results 4 TBD: Support Letter (Transportation Advisory Board) 24 25 26 27 28 29 30 31 32 Parking Revenue Task Force Meeting #1 November 18, 2022 ESTES PARK COLORADO | THE CAR PARK33 ESTES PARK COLORADO | THE CAR PARK Brief Introductions: •Name, affiliation and stakeholder group you represent. Purpose: •To develop a recommendation to the Town Board on how paid parking revenues should be spent. 34 1.Support the Town’s business districts by making parking available and by encouraging economic development 2.Maintain adequate turnover of Town -controlled parking spaces 3.Encourage an adequate amount of parking availability for a variety of parking users •Efficient use of perimeter parking locations •Increase use of the Town’s free shuttle system and other transportation alternatives 4.Reduce congestion in travel lanes caused by drivers seeking available parking. * Defined in EPMC Ordinance 30-19 Paid Parking Program Goals* ESTES PARK COLORADO | THE CAR PARK35 ESTES PARK COLORADO | THE CAR PARK How Parking Revenues Can Be Spent Special Revenue Fund (EPMC 10.06.060) •Revenue may be expended only on the administration, operation, and enhancement of parking management and complementary transit and alternative transportation services. Current Fund balance: $270,274 Anticipated balance (by 12/31): $467,485 36 ESTES PARK COLORADO | THE CAR PARK Previous Direction –Planning & Stakeholders Plans & Studies •2005 Parking Study •2012 Transportation Visioning Committee Roadmap •2013 Transit & Parking Study •2018 Downtown Plan •2018 Downtown Parking Management Plan •2021-2022 Comp Plan (Visioning Process) o Key Themes ▪Increase transit service to serve both residents and visitors from the Front Range ▪Demand for bicycle infrastructure and multi-modal connectivity between neighborhoods, Downtown, and lodging destinations ▪Increased alternatives to driving and more park-once opportunities to alleviate vehicle traffic through Downtown Key Themes •Take care of employees •More parking is needed downtown •Expand the shuttle program •Invest in bicycle infrastructure 37 ESTES PARK COLORADO | THE CAR PARK Previous Direction –Planning & Stakeholders Downtown Parking Task Force (2021-2022) •Additional parking supply downtown, in a more centralized location •Additional transit service –increase frequency, early/evening service, expand routes, additional vehicles •Invest in bicycle infrastructure, specifically e-bike share •Move towards true Enterprise Fund •Employee transportation •Additional signage –specifically to delineate public vs. private parking Cleave Street Improvement Project (2022) •Additional supply in targeted locations; “micro-structure” concept 38 ESTES PARK COLORADO | THE CAR PARK Next Steps Meeting #2 (December) •Group will discuss and prioritize all suggested uses for revenue •Homework: Share group ranking (top 3) with your network, collect feedback; identify pros and cons Meeting #3 (January) •Finalize recommendation to the Town Board 39 Parking Revenue Task Force Meeting #2 December 7, 2022 ESTES PARK COLORADO | THE CAR PARK40 ESTES PARK COLORADO | THE CAR PARK Today’s Goal •Through today’s discussion, we hope to learn more from each other about our respective priority lists. •The exercise is designed to help you think through the problem we might solve (the need), who would benefit, implementation feasibility and cost. •Our next homework assignment will be to use this matrix to prioritize the most important and urgent need(s). (Challenge: one per box) •Important: We are solely focused on where to spend paid parking revenues; priorities identified through this process do not exclude investment (time/money) in other priorities through other means. •Our role is to funnel down and focus many good ideas/competing priorities for parking revenues. Future 41 ESTES PARK COLORADO | THE CAR PARK Homework Insights Colleen (Estes Chamber) Surveyed membership via Friday Focus –received 18 responses •Additional parking supply downtown / in a more central location (6) •Address/replace loss of parking due to Cleave St. project (5) •More transit service (4) •Invest in bicycle infrastructure; eBike share (2) •Transition to a true enterprise fund (1) Rebecca (Visit Estes Park) •Another multi-level garage or added parking spaces •Signage for use of bike/walking paths with better lighting •Free parking for local residents and discounts for drive market visitors 42 ESTES PARK COLORADO | THE CAR PARK Homework Insights Jessica (TAB) •Invest in safety infrastructure for pedestrians and cyclists, especially around Highway 7 corridor. •Consider grant funding for a fleet of eBikes to connect parking structure with downtown; program to provide eBikes to downtown employees who might drive to work. Ann (TAB) •Move the Hiker Shuttle to the Events Center; could help with congestion and folks could shuttle downtown (would need more Town service). •Continue to improve shuttle service via 1) more local service (e.g., Carriage Hills), 2) direct service to downtown w/out transfer at VC and 3) evening service for downtown employees. •Continue saving for a more ambitious project and increase paid parking program to ramp up revenue. Could include smaller structures around downtown (Wiest, Cleave St., Big Horn), another level at Events Complex, Performance Park and Tregent/Spruce). 43 ESTES PARK COLORADO | THE CAR PARK Homework Insights Rachel (Downtown Business -Lodging) •Construction parking mitigation; off-site parking and shuttle for construction workers •Signage and information to help visitors navigate the Loop project •Longer-term:additional parking in a more centralized location (e.g., Riverside lot) 44 ESTES PARK COLORADO | THE CAR PARK Homework Exercise 1.Based on today’s discussion, use the decision matrix to prioritize the most important and urgent need for paid parking revenues. (Challenge: one per box) a)Additional parking supply b)More transit service c)Bicycle infrastructure, programming 2.Include brief explanation for your ranking. 3.Send to Vanessa before next meeting. 4.Next meeting:Define group direction/priority(ies); discuss process Future 45 ESTES PARK COLORADO | THE CAR PARK Results Greg (Town) •Swift mitigation of lost parking spaces (DEL, Cleave) with a micro-structure on Big Horn. Design in 2023, build in 2024 with cash on hand (pkg revenue + General Fund) •Issue an RFP for P3 to design, fund and build a mixed-used parking facility on Town Hall lot. Consider new revenue bonds or structured debt. •Note: Expanded supply in other locations downtown would bring more congestion/ped conflict. Vanessa (Town) •Move towards a true enterprise fund with commitment from Town to redirect General Funds savings to projects that improve downtown infrastructure. •Additional supply near the Cleave Street project area (Big Horn or Spruce); could consider a P3 project, possibly with the Housing Authority, to add more parking and workforce housing. 46 47 48 49 50 51 52