HomeMy WebLinkAboutPACKET Estes Valley Board of Adjustment 2009-08-04P4epared Juiy
Revised:
AGENDA
ESTES VALLEY BOARD OF ADJUSTMENT
Tuesday, August 4, 2009
9:00 a.m. - Board Room, Town Hall
1. PUBLIC COMMENT
2. CONSENT
a. Approval of minutes dated July 7, 2009
3. REQUESTS
a. Metes and Bounds property located at 1209 Manford Avenue
Owner: Town of Estes Park
Applicant: Thorp Associates, PC
Request: Variance from Section 1.9.E to allow construction of a new
grandstand above the 30 foot height limit
Staff Contact: Alison Chilcott
4. REPORTS
5. ADJOURNMENT
Note: The Estes Valley Board of Adjustment reserves the right to consider other
appropriate items not available at the time the agenda was prepared.
RECORD OF PROCEEDINGS
Regular Meeting of the Estes Valley Board of Adjustment
July 7, 2009, 9:00 a.m.
Board Room, Estes Park Town Hall
Board: Chair Chuck Levine, Members John Lynch, Bob McCreery, Wayne
Newsom, and Al Sager; Alternate Member Bruce Grant
Attending: Chair Levine, Members Lynch, McCreery, Newsom, and Sager
Also Attending: Director Joseph, Planner Alison Chilcott, Planner Dave Shirk, and
Recording Secretary Thompson
Absent: None
Chair Levine called the meeting to order at 9:00 a.m.
1. PUBLIC COMMENT
None
2. CONSENT AGENDA
a. Approval of minutes dated June 2, 2009
It was moved and seconded (Newsom/Sager) to approve the minutes as
presented, and the motion passed unanimously
3. LOT 1, SILVER LANE STABLES ADDITION, located at 621 Big Thompson Avenue —
Request for a variance from §5.1.0.4.a,of the Estes Valley Development Code, which
requires that service stations and quick lubrication service uses shall be located at
least one hundred (100) feet from the property boundary of any residential zoning
district.
Staff Report:
Planner Chilcott stated Safeway is proposing to construct a service (fueling) station and
car wash on the Current Silver Lane Stables site, at the corner of Highway 34 and Steamer
Drive. The applicant has also submitted a development plan application for construction of
the service` station and car wash, which is being reviewed at staff level with a decision by
July 21,u2009.
Planner Chilcott stated that staff reviewed the variance request for compliance with Estes
Valley Development Code Section 3.6, which includes evaluating whether or not special
circumstances and practical difficulty exist in complying with the code standards from
which a variance is requested. Staff finds that special circumstances exist and practical
difficulty mayresult from strict compliance with Code standards.
The Estes Valley `D, evelopment Code (EVDC) requires that service station, car wash, and
quick lubrication service uses be located a minimum of one hundred feet from the
boundary of a residential zoning district. The setback requirement for this use is
significantly larger than typically required between commercial and residential uses. For
any other commercial use, the setback would be 15 or 25 feet, depending on zoning. The
R-zoned property in question is an outlot of the Stanley Hills subdivision and contains
postal cluster boxes and a driveway leading to the boxes. This outlot is available for future
roadway if a deed of dedication from the Stanley Hills Subdivision HOA was submitted.
The closest single-family lot to the proposed service station and car wash is approximately
135 feet away, with the closest house being about 370 feet away.
The setback is intended for a buffer between a service station, car wash, and/or quick
lubrication service use and a residential use, but in this case the buffer will never serve its
intended purpose. To layer on this increased setback adds a further and significant
development constraint to the property.
RECORD OF PwV,_' tFLDINGS
Estes Valley Bowe"' of Adjustment
July 7, 2009
In determining practical difficulty, Planner Chi cott stated the 100-foot required setback
would provide a buffer against a lot that in thL future could become a portion of the
Steamer Drive right-of-way. She also slated the essential character of the neighborhood
will not be substantially altered and adjoining properties will not suffer a substantial
detriment if the variance is granted. Staff has received several letters from the public with
strong opinions for and against the proposal.
Staff has determined the applicant cannot build as proposed without the requested
variance. The variance would not reduce the size of the lot; and, if granted, represents the
least deviation from the regulations that will afford relief.
Member Newsom questioned why staff recommended the variance be valid for three
years, rather than the typical one-year time period. Planner Chilcott stated staff
recommended this because Safeway does not plan on constructing the car wash
immediately, if at all. A three-year period gives Safeway a longer timeframe in which to
construct the car wash without reapplying to the Board of Adjustment.
Public Comment:
Jeff Fergot/Corporate Architect representing Safeway stated Safeway wants make sure
they have the entitlement in place for the car wash so they can construct it in the future if
there is a need or desire for it. He stated Safeway typically finds the highest demand for
car washes is during the winter months, which are Estes Park's slowest months. Safeway
would like to evaluate the need for the car wash after the gas station is constructed. If
built, the car wash will be a closed system with water reclamation.
Leslie Peng/Discovery Lodge owner has concerns about the effect on the water supply for
the Discovery Lodge fish pond. This water supply runs underground through the stables
property. Director Joseph stated this concern is valid and Community Development will try
to address the issue during the staff development plan review.
Greg Wheeler/Stanley Village has had positive experiences working with Safeway fueling
stations at other shopping centers. He believes Estes Park would benefit from this facility.
Member Newsom has a concern about canopy lighting. Director Joseph stated this
concern will be addressed in the development plan review. There is an illumination plan
for this project.
It was moved and seconded (Newsom/Sager) to APPROVE the request for a variance
from EVDC §5.1.0.4.a to allow construction of a fueling facility and car wash within
100 feet of the property boundary of a residential zoning district, with the following
conditions:
CONDITIONAL TO:
1. Approval of Safeway's development plan application #09-05.
2. Failure to apply for a building permit and commence construction or action with
regard to the variance approval within three years of final development plan
approval shall automatically render the decision of the Board of Adjustment null and
void.
3. Exterior lighting under the canopy will be completely recessed.
The motion passed unanimously.
4. REPORTS
There being no further business, Chair Levine adjourned the meeting at 9:30 a.m.
Chuck Levine, Chair
Karen Thompson, Recording Secretary
1209 Manford Avenue
Height Variance Request
Estes Park Community Development Department
Town Hall Building, 170 MacGregor Avenue
PO Box 1200
Estes Park, CO 80517
Phone: 970-577-3721 Fax: 970-586-0249 www.estesnet.com
I. PROJECT DESCRIPTION/BACKGROUND
DATE OF BOA MEETING: August 4, 2009
LOCATION: The site is located at 1209 Manford Avenue, within the
Town of Estes Park. Legal Description: metes and bounds parcel.
APPLICANT/PROPERTY OWNER: Roger M. Thorp, Thorp Associates
P.C., Architects and Planners/Town of Estes Park
STAFF CONTACT: Alison Chilcott
APPLICABLE LAND USE CODE:
Estes Valley Development Code (EVDC)
REQUEST:
The applicant has submitted a special review/location and extent application
for Planning Commission and Town Board review to replace the
grandstands at the Stanley Park Fairgrounds.
The applicant has also submitted a height variance application for Board of
Adjustment review, requesting that the ventilating cupolas on the
grandstand exceed the maximum allowable height by four feet four inches.
The main roof of the building will comply with the maximum allowable
height.
▪ 14.1161*
al FM oft
w▪ r1 ar
mom
sowaftrYw we
Odiei .hlk,_
' "eRriiau ce.
Cupolas Circled on North and West Elevations
L',�hu��!�il %u irr�M�t uiiViVl
IIll
,
�wa(rECTu w witteiPC.
t
OPT
poillet0 talip
411r! C:"'x
'n$r ip pP)
u r,
Specifically, the applicant requests a variance to Estes Valley Development
Code Section 1.9.E. Height, which establishes a maximum height limit of
thirty feet from existing grade (prior to site -specific slope adjustment).
Board of Adjustment members have received Development Plan Sheets 1,
2, 3, and 5 of 5 for review. Sheet 4 of 5 is a utility plan that is not relevant to
the height variance request.
II. SITE DATA AND MAPS
Number of Lots/Parcels
Parcel Number(s)
One
25304-05-943
Lot Size
Zoning
Existing Land Use
Proposed Land Use
SERVICES
Water
Sewer
Fire Protection
Electric
Telephone
7.555 acres per Development
Plan Sheet 1 of 5
CO -Outlying Commercial
329,100 square feet
Entertainment Event, Major (Stanley Park Fairgrounds)
Same
Town of Estes Park
Upper Thompson Sanitation District and
Estes Park Sanitation District
Town of Estes Park
Town of Estes Park
Qwest
Page #2 Height Variance Request for 1209 Manford Avenue (Stanley Park Fairgrounds Grandstand)
5 of 5
s with Ad'acent Land Uses and 2onin
''I� LIIIII YIII "
�d f id1i11P1111�
Location Ma
dwlPI�NIIi�IoIN!1!il�,''l'^
illtri3usPau or
• cIatilt alion
jl {1:1e 'rlist-ict}
loom
°���"��IIIIIIIIII IIIIII'I�
1111 III II �Iljl'ill�'
IyNllllll 00 o II iII
Page #3 - Height Variance Request for 1209 Manford Avenue (Stanley Park Fairgrounds Grandstand)
tmti1,j,d,1i�
111111L111,111111,11111111111 fey
III. REVIEW CRITERIA
All variance applications shall demonstrate compliance with the standards
and criteria set forth in Chapter 3.6.0 and all other applicable provisions of
the Estes Valley Development Code.
This variance request does not fall within the parameters of staff -level
review and will be reviewed by the Estes Valley Board of Adjustment.
IV. REFERRAL COMMENTS
This request has been submitted to reviewing agency staff and neighboring
property owners for consideration and comment. The following reviewing
agency staff and/or neighboring property owners submitted comments.
Estes Park Public Works and Utilities Departments See Tracy Feagans'
memo dated July 24, 2009.
Estes Park Fire Department See Derek Rosenquist's letter to Alison
Chilcott dated July 16, 2009.
Town Attorney See Greg White's letter to Alison Chilcott dated July 17,
2009.
Upper Thompson Sanitation District See Todd Krula's letter to Alison
Chilcott dated July 21, 2009.
Page #4 --• Height Variance Request for 1209 Manford Avenue (Stanley Park Fairgrounds Grandstand)
V. STAFF FINDINGS
Staff finds:
1. Special circumstances or conditions exist (e.g., exceptional
topographic conditions, narrowness, shallowness or the shape of the
property) that are not common to other areas or buildings similarly
situated and practical difficulty may result from strict compliance
with this Code's standards, provided that the requested variance
will not have the effect of nullifying or impairing the intent and
purposes of either the specific standards, this Code or the
Comprehensive Plan.
Staff Finding:
The special circumstances are related to the unique use of building as a
grandstand and the goal noted in the statement of intent to "maintain
good visibility of the arena ... for the spectators," while increasing the
grandstand seating capacity.
2. In determining "practical difficulty," the BOA shall consider the
following factors:
a. Whether there can be any beneficial use of the property without
the variance.
Staff Finding: Staff finds that there can be a beneficial use of the
property without the variance. The existing grandstand can remain.
A grandstand complying with the height limit could be constructed.
b. Whether the variance is substantial.
Staff Finding: The variance is not substantial. The main roof of the
grandstand complies with the height limit.
c. Whether the essential character of the neighborhood would be
substantially altered or whether adjoining properties would
suffer a substantial detriment as a result of the variance.
Staff Finding: The essential character of the neighborhood could be
improved as Stanley Park redevelops. The new grandstand is subject
to design criteria adopted by the Town and will be an improvement
in design over the old grandstand.
The cupolas are the only portion of the grandstand for which a
variance is requested. These cupolas may have some impact on
Page #5 -- Height Variance Request for 1209 Manford Avenue (Stanley Park Fairgrounds Grandstand)
views from properties to the south or Stanley Park, such as views
from the Lone Tree Village apartments.
d Whether the variance would adversely affect the delivery of
public services such as water and sewer.
Staff Finding: Granting a height variance for the ventilating cupolas
will not affect the delivery of public services.
e. Whether the Applicant purchased the property with knowledge
of the requirement.
Staff Finding: The applicant did not purchase the property with
knowledge of the requirement. This property was donated to the
Town of Estes Park, the property owner, many years ago.
f. Whether the Applicant's predicament can be mitigated through
some method other than a variance.
Staff Finding: A building could be designed that complies with the
height limit.
3. No variance shall be granted if the submitted conditions or
circumstances affecting the Applicant's property are of so general
or recurrent a nature as to make reasonably practicable the
formulation of a general regulation for such conditions or
situations.
Staff Finding: The submitted conditions or circumstances are not of so
general or recurrent a nature as to make reasonably practicable the
formulation of a general regulation.
4. No variance shall be granted reducing the size of lots contained in
an existing or proposed subdivision if it will result in an increase in
the number of lots beyond the number otherwise permitted for the
total subdivision, pursuant to the applicable zone district
regulations.
Staff Finding: The variance would not reduce the size of the lot.
Page #6 -- Height Variance Request for 1209 Manford Avenue (Stanley Park Fairgrounds Grandstand)
5. If authorized, a variance shall represent the least deviation from the
regulations that will afford relief:
Staff Finding: The variance represents the least deviation from the
regulations that will afford relief, i.e. to maintain good visibility of the
arena while increasing grandstand capacity. The main roof complies
with the height limit.
6. Under no circumstances shall the BOA grant a variance to allow a
use not permitted, or a use expressly or by implication prohibited
under the terms of this Code for the zone district containing the
property for which the variance is sought.
Staff Finding: The proposed use is permitted by special review in the
"CO" Commercial Outlying zoning district.
7. In granting this variance, the BOA may require such conditions as will,
in its independent judgment, secure substantially the objectives of the
standards varied or modified.
S. This request has been submitted to all applicable reviewing agency staff
for consideration and comment. All letters and memos submitted by
reviewing agency staff, referred to in Section IV of this staff report, are
incorporated as staff findings.
VI. STAFF RECOMMENDATION
Staff recommends APPROVAL of the requested variance with the
following condition:
1. A registered land surveyor shall set the survey stakes for the foundation
forms. After the footings are set, and prior to pouring the foundation, the
surveyor shall verify compliance with the variance and provide a height
certificate.
Page #7 Height Variance Request for 1209 Manford Avenue (Stanley Park Fairgrounds Grandstand)
ESTES I1. -, UtiP A R IC
COLORADO
To:
From:
Date:
Re:
Room 100. Town Hall
P.O. Box 1200, Estes Park, CO 80517
Alison Chilcott, Bob Goehring, and Scott Zurn, PE
Tracy Feagans
July 24, 2009
Variance Request -Stanley Park Grandstand Metes & Bounds aat 1209 Manford Ave.
Background:
The Public Works and Utilities Departments have enclosed progress comments regarding the
submittals received to date and remain general as the submittals are not complete and
construction drawings for the public improvements have not been submitted. It is important to
note that these Departments reserve the right to make additional comments and revise
comments as more detail is provided in the subsequent submittals and development plans.
Light & Power:
We have no comments or concerns.
Water:
After review of the Variance Request the Water Department has no comments.
Public Works:
No comments or concems.
• Page 1
P.O. Box 568
Estes Park, Colorado 80517
(970)-586-4544
(970) 586-1049 Fax
July 21, 2009
Alison Chilcott, Planner II
Town of Estes Park
P.O. Box 1200
Estes Park, CO 80517
Re: Variance Request
Stanley Park Grandstand
Metes & Bounds
1209 Manford Ave.
Dear Alison,
The Upper Thompson Sanitation District submits the following comments for the above referenced
property:
1. The District has no objection to the proposed variance request.
If you have any questions or need further assistance, please do not hesitate to contact me.
Thank you,
/�
`„i'
Todd Krula
Lines Superintendent
cc: Roger M. Thorp
Thorp Associates, PC
PO Box 129
Estes Park, CO 80517
FAX: 970-586-4145
North Park Place
1423 West 29t Street
Loveland, Colorado 80538
G E GO Y A. 1TE
Attorney at I..aw
July 17, 2009
ALISON CHILCO'IT, PLANNER II
COMMUNITY DEVELOPMENT DEPT
TOWN OF ESTES PARK
PO BOX 1200
ESTES PARK, CO 80517
970/667-5310
Fax 970/667-2527
Re: Board of Adjustment — Variance Request — StanIey Park Grandstand
Dear Ms. Chilcott:
I have the following comments:
1. Section 31-23-301 (1) C.R.S. provides that the Board of Adjustment may exempt any
Town structure from the terms and conditions of the Estes Valley Development
Code if satisfactory proof is presented to the Board of Adjustment that the proposed
structure is reasonably necessary for the convenience or welfare of the public. This
standard is different than the Board of Adjustment standards found in Section 3.6 of
the Estes Valley Development Code.
If you have any questions, pleas d do not hesitate to give me a call.
Gre
CC: Thorp Associates, PC/, Roger
Fax: 970/586-4145
GAW/ldr
Truly Yours,
..,____be
ry A. White
From. Der"kPoos^quisi
Sent: Thursday, �6.20081114AM
To: AUsi�ar�C11!InnK noge/0k
Subjelut: varian(.:�e requesit for Stanley Park grandstands
The Fire Department has no comment on the height variance request.
DomkKnxeoquist
Training Captain
Estes Park Volunteer Fire Department
970'577'3690
1,
^*
�
To: Bob Goehring
From: Mike Mangelsen
Date: 7-17-09
Re: Stanley Park Grandstands, Variance Request, 1209 Manford Avenue
The Light and Power Department has reviewed the variance request application for
the above referenced property and has the following comments:
1.) We have no comments or concerns
1
STANLEY PARK GRANDSTAND
1209 Manford Avenue
Estes Park, Colorado 80517
HEIGHT VARIANCE
STATEMENT OF INTENT
The design of the new Stanley Park Grandstand building involves special functional
requirements of seating and visibility to the arena that make it difficult to strictly comply with
the Estes Valley Development Code's standard for maximum building height. The original
project program, calling for a 3,000 seat grandstand, has been compromised down to just under
2,700 seats in order to minimize this requested height variance. Although the variance is
substantial, adding approximately 12% (4'-4") to the official height of the building with the
reduction in seating and careful design of the bleacher slope, the roof of the gyiandstand can stay
within the 30'-8" height limitation (as determined by the height adjustment brmula in Section
1.9E2 of the Development Code), making the ventilating cupolas at the roof's peak the only
element of the design needing a variance. By allowing the main roof of the grandstand to reach
the 30'-8" height limit, the design can still maintain good visibility of the arena and scenic
mountains beyond for the spectators.
Also, the ventilating cupolas, besides providing the very real function of naturally cooling the
grandstand on hot summer afternoons, will help the design meet the requirements of the recently
adopted Stanley Park Design Criteria, by visually breaking up the 250 foot long roof span and
adding elements of architectural interest.
The request for a 4'-4" height variance for the Grandstand building, thereby allowing ventilating
cupolas, will actually add architectural character to the Stanley Park complex, and is far enough
set back from any adjoining property that with the lowering slope of the property's grade there
will be no detriment to surrounding properties. The Stanley Park Fairgrounds has had a
grandstand in this location since 1947 and all public utilities are presently on location, and the
expansion of the facility will not adversely affect these public services in any way.
After studying the program requirements and site conditions for the project, no viable alternative
to a height variance has been found that would properly meet the functional requirements of the
facility and still meet the intent of the Stanley Park Design Criteria. For these reasons, a height
variance of 4'-4" is respectfully requested for the Stanley Park Grandstand project.
Subdivision: Manfotd
Parcel ID # 29304• 05+943 Secti
Lot Size
Existing Land Use
Proposed Land Use Grandstand
ESTES VALLEY
BOARD OF ADJUSTMENT
APPLICATION
Submittal Date:
enerai° Information.'
Record Owner(s): Tokn c £ Estee Park
�4 35 28EG rEN 1 4 COste ;°2P�-k, CO
street Address of Lot: N 5 g Sp PI E pI /
egal Description 5 5'�' 2 aR 1137.2 Ft -ru r�i �R L BRAD 640. FT 29 7 FT Tpo0 COLT 17 5 AC M/ L MAN FORD, Ep4'
Existing Water Service lotTown r Well r Other (Specify)
Proposed Water Service TATown r Well r Other (Specify)
Existing Sanitary Sewer Service
Proposed Sanitary Sewer Service
Existing Gas Service Xcel
Site Access (if not on public street)
Are there wetlands on the site?
✓ EPSD
✓ EPSD
✓ Other
Specific variance desired (state development code section #
fit
'iI Primary Contact Information
Name of Primary Contact Person
IR UTSD
Ix UTSD
r None
r Septic
r Septic
Roger M. Thorp, AIA LEER AP, Architect 586.9528
Mailin• Address PO box 12 Estes Park, CO 80517
Attachments
r Application fee (see attached fee schedule)
RI Statement of intent (must comply with standards set forth in Section 3.6.0 of the Estes Valley Development Code)
TX 1 copy (folded) of site plan (drawn at a scale of 1" = 20') **
F 1 reduced copy of the site plan (11" X 17")
Names & mailing addresses of neighboring property owners (see attached handout)
** The site plan shall include information in Estes Valley Development Code Appendix b.VIl.5 (attached).
The applicant will be required to provide additional copies of the site plan after staff review
(see the attached Board of Adjustment variance application schedule). Copies must be folded.
Town of Estes Park -a P.O. Box 1200.e. 170 MacGregor Avenue .n Estes Park„ CO 80517
Community Development Department Phone: (970) 577-3721 .. Fax: (970) 586-0249 . www.estesnet.com/ComDev
Primary Contact Person is r Owner y Applicant
Record Owner(s) Town o f Estes Park
Mailing Address PO Box 1200, Estes Park, CO 80517
Phone 970..577_ 37?5
Cell Phone
Fax 970.586.024 9
4flW,,t 1"
Consultant/EngineN•
Email
Applicant Roger M. Thorp, AIA, LPED AP, Thorp Associates PC, Arch & Planners
Mailing Address PO Box 129, Estes Park, CO 80517
Phone 970.586.9528
Cell Phone 970.679.7811
Fax 970.586.4145
Email ro ger@tho rpa s so c CO DI
Consultant/Engineer
Mailing Address
Phone
Cell Phone
Fax
Email
APPLICATION FEES
For variance applications within the Estes Valley Planning Area, both inside and outside Town limits
See the fee schedule included in your application packet or view the fee schedule online
at www.estesnet.com/ComDev/Schedules&Fees/PlanningApplicationFeeSchedule.pdf.
All requests for refunds must be made in writing. All fees are due at the time of submittal.
APPLICANT CERTIFICATION
► f hereby certify that the inforn'ration and exhibits herewith submitted are true and correct to the hest of my knowledge
and that in filing the application I am acting with the knowledge and consent of the owners of the property.
► In submitting the application materials and signing this application agreement, I acknowledge and agree that the
application is subject to the applicable processing and public hearing requirements set forth in the Estes Valley
Development Code (EVDC).
► I acknowledge that I have obtained or have access to the EVDC, and that, prior to filing this application, I have had the
opportunity to consult the relevant provisions governing the processing of and decision on the application.
(The Estes Valley Development Code is available online at www.estesnet.com/ComDev/DevCode.)
10. I understand that acceptance of this application by the Town of Estes Park for filing and receipt of the application fee by
the Town does not necessarily mean that the application is complete under the applicable requirements of the EVDC.
► I understand that this variance request may be delayed in processing by a month or mor f the information provided is
incomplete, inaccurate, or submitted after the deadline date.
► 1 understand that a resubmittal fee will be charged if my application is incomplete.
► The Community Development Department will notify the applicant in writing of the.date on which the application is
determined to be complete.
► I grant permission for Town of Estes Park Employees and Members of the Board of Adjustment with proper
identification access to my property during the review of this application.
► I acknowledge that I have received the Estes Valley Board of Adjustment Variance Application Schedule and that
failure to meet the deadlines shown on said schedule shall result in my application or the approval of my application
becoming NULL. and VOID. I understand that full fees will be charged for the resubmittal of an application that has
become null and void.
► I understand that I am required to obtain a 'Variance Notice" sign from the Community Development Department and
that this sign must be posted on my property where it is clearly visible from the road. I understand that the corners of
my property and the proposed building/structure corners must be field staked. I understand that the sign must be
posted and the staking completed no later than ten (10) business days prior to the Estes Valley Board of Adjustment
hearing.
► I understand that if the Board of Adjustment approves my request, "Failure of an applicant to apply for a building
permit and commence construction or action with regard to the variance approval within one (1) year of
receiving approval of the variance shall automatically render the decision of the BOA null and void." (Estes
Valley Development Code Section 3.6.D)
Names:
Record Owner PLEASE PRINT. Town of Estes Park
............................
Applicant PLEASE PRINT.
Signatures:
Record Owner
Applicant
APn, Thorp Associates PC
Date
Date
Revised 10/13/06
u r sfirorr, y 1.9 -Rules oa" Merisurelnpilt
vwOyir ITrIr-.FI'
90 00IDING SEIBAI MS
EQUAL TO FROM
TARP 5LIBACX
AT CORNER LOTS
Figure 1.2
E. Height.
1. Measurement of Maximum Building Height. Height shall be established by a plane
measured vertically above the existing natural terrain elevation prior to grading. Height
shall be measured as the vertical distance in feet from the original natural terrain within
the building footprint to the highest point of the finished roof situated directly above the
point of measurement. Small areas of rugged terrain inconsistent with this plane shall
not increase or reduce building height. "Smallareas" are those features with a
maximum width of twenty-five (25) feet. See Figure 1-3. (Ord. 18-02-#3)
HEANIT war FOLLOWS PROF.(
OP E=STI G NATORALORIIDE
- -�
poi _jag
FgNoma' OF
WILDING TM
EXTEN0AWDVE
HEIDHT LIMIT
EXISTING N ,WUR'L TERRAIN
PRIOR TO GRADING
CUT IN TERRAIN
19 E BURDBNG HEIGHT
EXISTING NATURAL TERRAIN
FILL INTEINi 1N
PRIOR TO O(IADIIG
FILL IN
TERRAIN
C NIT LSO FOLLOWS PROFILE
OP ENSTINO NATURAL TERRAIN
• DAMNS
TERRAIN
tt
Figure 1-3
Supp. 4
Genres af Provisions § 1 9 mules of Moasure,ne,?t
Measurement of Maximum Building Height on Slopes. The maximum height of
buildings on slopes may be adjusted up to a maximum of forty (40) feet using the
following calculation (see Figure 1-4). This adjustment requires submittal of a site plan
containing the following information: building elevations, roof design, finished floor
elevation, and grading plan with existing and proposed contours.
M030+[.50(a-b)] where:
Mb-Maximum height in feet at any given point above original grade
a=Elevation at highest point of natural grade of proposed building location
b=Elevation at any given point
•
•
M0 0' Mb 35' —M6 '
I
04.-xlitsagn h4-30.0(2ON
10'
Original ground surface
Figure 1-4
(Ord. 18-01 #2)
3. Exemptions from Height Standards.
a. Residential chimneys to the extent required by the Uniform Building Code; and
b. Wireless telecommunications facilities and structures, but only to the extent
allowed by the specific provisions set forth in Use Tables 4-1 and 4-4 in Chapter 4
and in §5.1.T of this Code.
F. Spacing Requirements. The required minimum space between a proposed use and an
existing use or lot shall be measured from the edge of the principal structure housing the
proposed use to the closest edge of the principal structure housing the existing use or to
the closest lot line.
G. Signs. For measurement provisions applicable to outdoor signs and advertising, see
Chapter 8 of this Code.
(Ord. 18-01 #1, 2, 10/23/01; Ord. 18-02 #3, 12/10/02; Ord. 8-05 #1, 6/14/05)
§ 1.10 TRANSITIONAL PROVISIONS
This Section addresses the applicability of new substantive standards enacted by this Code to
activities, actions and other matters that are pending or occurring as of the effective date of this
Code. (For definition of "effective date of this Code," see Chapter 13.)
Supp. 6
1-8
OD
04
voV.-07r- r... r- ti r- r- N ti N-r F-n I,
In r 0 r CO t- r r r r r r r r-xt r r r
0 In . In co 47 4) 4I) 11) to 10 41 In 10 In In L )
p)O+-Q r, OOOrOQN. 0 0 00�000 r
a0 CV o0 p, 00 CO CO OD OD CO CD co 0.) OD 0 00 OD 0 OD OD CO 07
CD
A-OOOO"'000cn00�c.,)0o0u`i00°DOOOo
N UcoU❑UOUcbUUc0MUcoUoCVUODUUCO
r N �Ou) YYU `Ow �O.YiYO `O
-0 > N ns ro al N al as U to us U co Co us c`o vi a) co co U
rgTa. t� CLa.0_�O_d WCL .:CL CI_ CL.CCLCL0_
{yr,," C co j CO N N N p N W j Z N j N N N co p N N co
•- N c) a) Ti; c). h. to y 7 u) Vl Q) x co a) c, j, 115 rh 15 () fiq 6)
O 0 W❑ W (A W W W H W W Q❑ W Q W J W W LL W W W Q
cc
U L U e 6-1
Y
co
L
co � Cv Q0 CD co cn ao 0 o o ❑ i� � J CD
1--
In N Or N �V N '�5 N KIN § 141 .r- `$ O i eis G) cov
N ., co
E
a1 0 0 0 0 O Z Q 0 0 0 co� YC a s d- p y c'
"CO03 COCLI=CO c\I ra7 mCOIn in co °)—<0QOm¢'tCrJ
'a000Oco70u"�)r1000r.c40°r°)' ° °° �r-N
Q CL aL CL CL co CL r a CL a co t7 CL co N .- co r co O_ N c7 co
Christian Center
a)
Uzi
J
C C
co . a; "0 �E a� troy
cal U cal Y E
W _ oQ a�a as
Osa
5 E oa 22 oN0 °) P$ �, N E 2 z ro
ias 0 n --I ase)a) a)U�' a
�� x �y n— �•-� OQ a o cam= a) c�J5
U ill 03 Q L ?+c UU) )❑067Q § a�i o 0ts-c W
C ,= 0 eL
W M C c0 (d V ? fn a 2 1J- co L
C to o yS.os ° y QS . y N C co' -'
CC 05 c a L .0 c Ea)
w c H
3 a m N m U 3 ns 0 0N� ) m c`d a) .== _c cLd cUa 5 co_ cp
Stanely Park Grandstands - Variance and Special Review APO
Contact Information
0
rom-Durnty Pr\
0
11
General Notes
"• •••• • • ""• .
tit tttt
.t.".7'
q
Fr,
1-1-t
JUI P
I•g• p
- ttt
Pt H
rtk It -ttt
0
CN
-0
0
V)
—0
0
0
o_
eD
C3
(1)
1209 Manford Avenue
Estes Park, Colorado 80517
a_
L.
win
0
ra
a)
EL'
cr)
(1)
I 1 r.
L()