HomeMy WebLinkAboutPERMIT B-8445 ptwin 3501 Fall River Rd 2007-11-15Date:04/29/OS Permit #:8445
By:Carolyn McEndaffer &Job Address:3501 Fall River Road
Will Birchfield,CBO Della Terra
PROJECT CONTACTS
OWNER &GENERAL CONTRACTOR Della Terra,LLC
Hill Country Custom Homes,Inc.
Contact:Pamela Amelang
3501 Fall River Road
Estes Park,CO 80517
Phone:970-586-4563
Phone:970-393-5639
Cell:970-
Fax:970-498-9837
Email:panwlaiial@vahoo.com
ARCHITECT Architecture West,LLC
Stephen 3 Steinbicker,AlA
Phone:970-207-0424
Fax:970-207-9191
Email:arehwest@comcast.net
CIVIL ENGINEER Shear Engineering Corporation
Contact:Brain W.Shear,Mike Cole
4836 So.College Ave.Suite 12
Fort Collins,CO 80525
Phone:970-226-5334
Phone:970-226-4451
Fax:970-282-0311
Email:mcole@shearenaineerinp.com
STRUCTURAL ENGINEER Weeks &Associates
Contact:Gary Weeks
4700 South College Ave.#1
Fort Collins,CO 80525
Phone:970-225-2422
Fax:970-225-2622
Email:
MECHANICAL &PLUMBING ENGINEER Integrated Mechanical,LLC
Contact:
223 Linden Street,Suite 204
Fort Collins,CO 80524
Phone:970-556-0570
Cell:970-498-9837
Fax:800-656-4359
Email:
ELECTRICAL ENGINEER APS,Inc.Electrical Engineers
Contact:
7726 Park Ridge Circle
Fort Collins,CO 80528
Phone:970-206-0369
Fax:
Email:
\\Servera\Comm_Dev\Building\REVIEWS\COMMERCIALPIan Review\3501 Fall River Road Della Tena Code Anaylsis.doc Page I
Printed:4/30/2008 Permit Record Report Page 1 of 7
Permit Number:8445
Parcel Number:3516000002 Address:3501 Fall River Road
Estes Park,CO 80517
Applicant:Della Terra,LLC Applicant Role:Owner
Address:3501 Fall River Road Phone:586-4563
Estes Park,CO 80517
Status:Approved On Hold By:
Filing Date:11/15/2007 App Accepted By:
Decision Date:Decision By:
Application Expiration:5/15/2008 Team Leader:
Permit Expiration:10/29/2009 Default Inspector:
Last Edit Date:11/15/200
Last Edited By:Connie Bowser Appeal Filed:
Comments:22.4/30/08-Approved and sent to Finance.Decision:
CS Date:
21.4/29/08-Rec’d 2 sets stamped plans A8,Appeal Comments:A21,A25.2 sets stamped rafter beam
connection details.Provided to CM for
review/approval.CB
20.4/25/08-Rec’d 2 sets revised construction
plan stamped sheets A2,A4,A24,P28,A30,
1 set non stamped plans A8,A21,A25,wall
tire rating info,response to plan review dated
4/21/08.Per Contractor-stamped copies for 3
sheets.to follow after bldg dept
review/approval.Provided to CM for
review/approval.CS
19.4/18/08-Notified Pam Amelang-Per WB
with Dave Fisher as Firestop contractor,will
approve fire stop deferred submittals.CB
18.4/7/08-Recd 2 sets plan review response,
2 sets stamped mechanical plan revisions
(MPO.1,M5.1,M5.2),1 set fire stop plans
from Lighten Up Electrical Svcs &1 set fire
stop plans from Hill Country Custom Homes,2
sets updated stamped site/accessibility plans,
1 wet stamp copy of heightlelevation
certificate.(CT prey reviewed/approved faxed
copy),2 sets stamped revised plans for
foundation and framing (S0.1,S1.1,S1.2,
S2.1,S3.1,S3.2,S4.1,S5.1),2 sets
preliminary elevator detail,1 copy of
preliminary fire water detail,2 sets
stamped/revised construction details.
Provided to CM &WB for review/approval.CB
17.3/28/08-Rec’d 1 copy
window/door/hardware info.Provided to CM
for review/approval.CS
Printed:4/30/2008 Permit Record Report Page 2 of 7
Permit Number:8445
16.3/14/08-WB rec’d grease interceptor info.,
reviewed/approved.Copy in address file.CS
15.3/3/08-Planning Dept recd 2 sets
stamped plans S1.1,52.1,53.1,55.2,
provided to CM for review/approval.CR
14.2/29/08-Rec’d 2 sets revised site plans,1
set preliminary plan for elevator.Provided to
CM for review/approval.CB
13.2/28/08-Rec’d 1 faxed copy of HD
approval of water system and guidelines.
Provided to WB for review/approval.CS
12.2/26/08-Rec’d 2 sets revised site plans,2
sets revised 51.1,52.1,S5.1 and response to
plan review comments.Provided to CM for
review/approval.CS
11.2/20/08-Rec’d 2 sets stamped structural,
1 set originals of comcheck,mech
requirements,integrated mech response.
Provided to CM for review/approval.CB
10.2/19/08-LJM for Pam-expl still need
structural before releasing F&F,provided
Jackie Williamson phone#,and expl will
provide permit fees as soon as Carolyn sets
valuation upon completion of plan review.CS
9.2/18/08-Rec’d 1 faxed copy of geo tech
letter,letter to WB re:dev sched for firewater
and road,1 copy Planning dept requirement
for infrastructure.Put letter in WB inbox,all
other paperwork with new submittals in file
room fo review/approval.CS
8.2/18/08-Per Dave Shirk:will approve F&F
permit,sts still needs letter of credit before
approving release of full permit.CS
7.2/15/08-Rec’d 1 set faxed copy of
mechanical response-Integrated Mechanical,
Inc,1 copy of revised rescheck.Notified CM &
WS of receipt,copies in file room for
review/approval.CS
6.2/15/08-Recd 2 sets revised mechanical
plans,notified CM &WB of receipt,copies in
file room for review/approval.CS
5.2/12/08-Aec’d 2 sets revised site plans,2
sets revised construction plans (per Pam-
structural and mechanical plans to be
submitted at end of week)1 copy of
equipment specs,1 copy response to plan
review questions,1 copy electrical revisions,1
copy hood specs,1 copy bar specs.Notified
CM &WS of receipt,copies in file room for
review/approval.CB
4.1/11/08-Faxed copy of town demo and
state demo permit to Pam Amelang for
bathroom bldg.Notified Pam that if connected
to Sanitation-should contact San dept to
ensure credit for any plumbing.CS
?1!?/Q?-9cc’1 c2py Qf !n!
Printed:4/30/2008 Permit Record Report Page 3 of 7
Permit Number:8445
drainage/erosion control/water quality report,
1 copy grade plan A-23 sheet.Notified
contractor need 1 more copy of A-23,will
provide to CM for review/approval.CS
2.12/17/07-spk w/Pam Amelang-Pam to fax
required letter to Planning and PW,Planning
to sign off this week w/approval of dev
agreement,etc.PW to sign off after review of
letter &drainage report(s)provided by bldg
dept.Pam to provide additional copy of
drainage report to bldg dept for file.ExpI do
not have fees yet,reviewed release time
frame.CB
12/6/07-Rec’d copy of fire protection water
supply and fire protection system by Kramer
Design,LLC.Provided toWS for
review/approval.Scott Dorman to contact WB
has approved project and dry hydrant,to
provide Will update.Copy also in address file.
CB
Owners:
Name:Purchase Date:
Della Terra,[[C
Contractors:
Name:Type:Local Phone:Primary?
Hill Country Custom Homes Builder 970-493-5639 El
Materials:
Type Rate Units Value
Total Value:$3,332,411.70
Fees and Receipts:
Number Description Amount
Light &Power SCUD
Zoning Compliance Review Fee $180.00
Building Permit Fee (Auto)514,124.20
Certificate of Occupancy $50.00
County Tax (CaIc)$13,329.65
Plan Review (CaIc)$9,180.73
Total Fees:$36,864.58
Total Receipts:$0.00
Inspection Schedule:
Type:Request Date:Requested By:Status:
Printed:4/30/2008 Permit Record Report Page 4 of 7
Permit Number:8445
Inspections:
Inspection #Type Pass?Date Inspector
Inspection Correction:
Correction Description:
Inspection Condition:
1
Condition Description:
Approvals:
File Received:Decision Date:Status:Department:
11/15/2007 4/29/2008 Approved Building
Comments:04/22/08 As staled in pre-construction meeting notes,corrected as built
plans 10 reflect the actual construction and detail will be required prior
to CO issuance.
Approval Reviews:
File Received:Review Completed:Reviewer:Status:
12/18/2007 1/9/2008 Carolyn McEndaffer Approved
Comments:02/12/08 Response received.See permit package.
emailed to Pam &Steve (Architect)
1/9/2008 1/11/2008 Carolyn McEndaffer Approved
Comments:Reviewed submitted information on grade plane.Meets grade plane and 50%s
long as foundation walls,slab,and finished floor are at heights shown.Finishe
grade per heights shown.Called Pam.CM 1/11/08
1/9/2008 1/28/2008 Carolyn McEndafter Approved
Comments:2/12/08 Recieved response to Struct,MEP.See permit
01/28/08 Faxed to Pam.
2/11/2008 2/11/2008 Carolyn McEndaffer Approved
Comments:02/12/08 Received response.
02/11/08 Faxed to Pam (Gas Review)
2/19/2008 2/19/2008 Carolyn McEndaffer Approved
Comments:02/19/08 Faxed 2nd review of Civil Sheet 1 of 1.CM
3/12/2008 3/12/2008 Carolyn McEndaffer Approved
Comments:04/07/08 recieved response.See permit.
emailed and faxed Pam
Approvals:
File Received:Decision Date:Status:Department:
11/15/2007 11/15/2007 Approved County Health
Comments:
Permit Record Report Page 5 of 7Printed:4/30/2008
Permit Number:8445
Approvals:
File Received:Decision Date:Status:Department:
12/6/2007 12/6/2007 Approved Fire
Comments:04/29/08 Please see attached recommendations for wildfire abatement.
Comply prior to release of Co.
Approvals:
File Received:Decision Date:Status:Department:
11/15/2007 11/30/2007 Approved Light and Power
Comments:12/1 7/07-OK to release per Bob Goehring with note that infrastructure
fees have not been paid at this time.
Approval Reviews:
File Received:Review Completed:Reviewer:Status:
11/30/2007 11/30/2007 Mike Mangelsen Approved
Comments:
Approvals:
File Received:Decision Date:Status:Department:
11/15/2007 4/18/2008 Approved Planning
Comments:Full compliance with Development Plan 07-14.
Erosion control shall be maintained throughout construction process
Shall contact planning staff one month prior to request for Certificate of
occupancy to arrange site visit and allow ample time to comply with
development plan issues such as revegation,parking,lighting,etc.
HEIGHT LIMIT:Surveyor shall provide certification the structure
complies with maximum height limit set forth in the EVDC.
Approval Reviews:
File Received:Review Completed:Reviewer:Status:
4/15/2008 4/18/2008 Dave Shirk Approved
Comments:
Approvals:
File Received:Decision Date:Status:Department:
11/15/2007 1/15/2008 Approved Public Works
Comments:1/15/08-Approved permit for release per Scott Zurn.CB
Approvals:
File Received:Decision Date:Status:Department:
Permit Record Report Page 6 of 7Printed:4/30/2008
Permit Number:8445
11/15/2007 11/15/2007 Approved Sanitation
Comments:
Approvals:
File Received:Decision Date:Status:Department:
1 1/1 5/2007 11/16/2007 Approved Water
Comments:Approved per CT-no charges at this time.
Certificates:
Temporary Certificate of Occupancy Certificate of Occupancy
Issued:Issued:
By:By:
Expiration:Occupancy:
Conditions:
Date:Status:Code:
Condition Description:
Condition Comments:
Violations:
Violation Date:Violation #:Agency:Status:Deadline:
Violation Description:
Other Fields:
Work Discription New 14 Unit Accommodation/Wedding Bldg.
A-3
213 New Hotels,Motels,Cabins
Permit Type Building
Permit Record Report Page 7 of 7Printed:4/30/2008
Permit Number:8445
V-B
Assembly
$3,332,411.70
No
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Sig