Loading...
HomeMy WebLinkAboutPERMIT B-8445 ptwin 3501 Fall River Rd 2007-11-15Date:04/29/OS Permit #:8445 By:Carolyn McEndaffer &Job Address:3501 Fall River Road Will Birchfield,CBO Della Terra PROJECT CONTACTS OWNER &GENERAL CONTRACTOR Della Terra,LLC Hill Country Custom Homes,Inc. Contact:Pamela Amelang 3501 Fall River Road Estes Park,CO 80517 Phone:970-586-4563 Phone:970-393-5639 Cell:970- Fax:970-498-9837 Email:panwlaiial@vahoo.com ARCHITECT Architecture West,LLC Stephen 3 Steinbicker,AlA Phone:970-207-0424 Fax:970-207-9191 Email:arehwest@comcast.net CIVIL ENGINEER Shear Engineering Corporation Contact:Brain W.Shear,Mike Cole 4836 So.College Ave.Suite 12 Fort Collins,CO 80525 Phone:970-226-5334 Phone:970-226-4451 Fax:970-282-0311 Email:mcole@shearenaineerinp.com STRUCTURAL ENGINEER Weeks &Associates Contact:Gary Weeks 4700 South College Ave.#1 Fort Collins,CO 80525 Phone:970-225-2422 Fax:970-225-2622 Email: MECHANICAL &PLUMBING ENGINEER Integrated Mechanical,LLC Contact: 223 Linden Street,Suite 204 Fort Collins,CO 80524 Phone:970-556-0570 Cell:970-498-9837 Fax:800-656-4359 Email: ELECTRICAL ENGINEER APS,Inc.Electrical Engineers Contact: 7726 Park Ridge Circle Fort Collins,CO 80528 Phone:970-206-0369 Fax: Email: \\Servera\Comm_Dev\Building\REVIEWS\COMMERCIALPIan Review\3501 Fall River Road Della Tena Code Anaylsis.doc Page I Printed:4/30/2008 Permit Record Report Page 1 of 7 Permit Number:8445 Parcel Number:3516000002 Address:3501 Fall River Road Estes Park,CO 80517 Applicant:Della Terra,LLC Applicant Role:Owner Address:3501 Fall River Road Phone:586-4563 Estes Park,CO 80517 Status:Approved On Hold By: Filing Date:11/15/2007 App Accepted By: Decision Date:Decision By: Application Expiration:5/15/2008 Team Leader: Permit Expiration:10/29/2009 Default Inspector: Last Edit Date:11/15/200 Last Edited By:Connie Bowser Appeal Filed: Comments:22.4/30/08-Approved and sent to Finance.Decision: CS Date: 21.4/29/08-Rec’d 2 sets stamped plans A8,Appeal Comments:A21,A25.2 sets stamped rafter beam connection details.Provided to CM for review/approval.CB 20.4/25/08-Rec’d 2 sets revised construction plan stamped sheets A2,A4,A24,P28,A30, 1 set non stamped plans A8,A21,A25,wall tire rating info,response to plan review dated 4/21/08.Per Contractor-stamped copies for 3 sheets.to follow after bldg dept review/approval.Provided to CM for review/approval.CS 19.4/18/08-Notified Pam Amelang-Per WB with Dave Fisher as Firestop contractor,will approve fire stop deferred submittals.CB 18.4/7/08-Recd 2 sets plan review response, 2 sets stamped mechanical plan revisions (MPO.1,M5.1,M5.2),1 set fire stop plans from Lighten Up Electrical Svcs &1 set fire stop plans from Hill Country Custom Homes,2 sets updated stamped site/accessibility plans, 1 wet stamp copy of heightlelevation certificate.(CT prey reviewed/approved faxed copy),2 sets stamped revised plans for foundation and framing (S0.1,S1.1,S1.2, S2.1,S3.1,S3.2,S4.1,S5.1),2 sets preliminary elevator detail,1 copy of preliminary fire water detail,2 sets stamped/revised construction details. Provided to CM &WB for review/approval.CB 17.3/28/08-Rec’d 1 copy window/door/hardware info.Provided to CM for review/approval.CS Printed:4/30/2008 Permit Record Report Page 2 of 7 Permit Number:8445 16.3/14/08-WB rec’d grease interceptor info., reviewed/approved.Copy in address file.CS 15.3/3/08-Planning Dept recd 2 sets stamped plans S1.1,52.1,53.1,55.2, provided to CM for review/approval.CR 14.2/29/08-Rec’d 2 sets revised site plans,1 set preliminary plan for elevator.Provided to CM for review/approval.CB 13.2/28/08-Rec’d 1 faxed copy of HD approval of water system and guidelines. Provided to WB for review/approval.CS 12.2/26/08-Rec’d 2 sets revised site plans,2 sets revised 51.1,52.1,S5.1 and response to plan review comments.Provided to CM for review/approval.CS 11.2/20/08-Rec’d 2 sets stamped structural, 1 set originals of comcheck,mech requirements,integrated mech response. Provided to CM for review/approval.CB 10.2/19/08-LJM for Pam-expl still need structural before releasing F&F,provided Jackie Williamson phone#,and expl will provide permit fees as soon as Carolyn sets valuation upon completion of plan review.CS 9.2/18/08-Rec’d 1 faxed copy of geo tech letter,letter to WB re:dev sched for firewater and road,1 copy Planning dept requirement for infrastructure.Put letter in WB inbox,all other paperwork with new submittals in file room fo review/approval.CS 8.2/18/08-Per Dave Shirk:will approve F&F permit,sts still needs letter of credit before approving release of full permit.CS 7.2/15/08-Rec’d 1 set faxed copy of mechanical response-Integrated Mechanical, Inc,1 copy of revised rescheck.Notified CM & WS of receipt,copies in file room for review/approval.CS 6.2/15/08-Recd 2 sets revised mechanical plans,notified CM &WB of receipt,copies in file room for review/approval.CS 5.2/12/08-Aec’d 2 sets revised site plans,2 sets revised construction plans (per Pam- structural and mechanical plans to be submitted at end of week)1 copy of equipment specs,1 copy response to plan review questions,1 copy electrical revisions,1 copy hood specs,1 copy bar specs.Notified CM &WS of receipt,copies in file room for review/approval.CB 4.1/11/08-Faxed copy of town demo and state demo permit to Pam Amelang for bathroom bldg.Notified Pam that if connected to Sanitation-should contact San dept to ensure credit for any plumbing.CS ?1!?/Q?-9cc’1 c2py Qf !n! Printed:4/30/2008 Permit Record Report Page 3 of 7 Permit Number:8445 drainage/erosion control/water quality report, 1 copy grade plan A-23 sheet.Notified contractor need 1 more copy of A-23,will provide to CM for review/approval.CS 2.12/17/07-spk w/Pam Amelang-Pam to fax required letter to Planning and PW,Planning to sign off this week w/approval of dev agreement,etc.PW to sign off after review of letter &drainage report(s)provided by bldg dept.Pam to provide additional copy of drainage report to bldg dept for file.ExpI do not have fees yet,reviewed release time frame.CB 12/6/07-Rec’d copy of fire protection water supply and fire protection system by Kramer Design,LLC.Provided toWS for review/approval.Scott Dorman to contact WB has approved project and dry hydrant,to provide Will update.Copy also in address file. CB Owners: Name:Purchase Date: Della Terra,[[C Contractors: Name:Type:Local Phone:Primary? Hill Country Custom Homes Builder 970-493-5639 El Materials: Type Rate Units Value Total Value:$3,332,411.70 Fees and Receipts: Number Description Amount Light &Power SCUD Zoning Compliance Review Fee $180.00 Building Permit Fee (Auto)514,124.20 Certificate of Occupancy $50.00 County Tax (CaIc)$13,329.65 Plan Review (CaIc)$9,180.73 Total Fees:$36,864.58 Total Receipts:$0.00 Inspection Schedule: Type:Request Date:Requested By:Status: Printed:4/30/2008 Permit Record Report Page 4 of 7 Permit Number:8445 Inspections: Inspection #Type Pass?Date Inspector Inspection Correction: Correction Description: Inspection Condition: 1 Condition Description: Approvals: File Received:Decision Date:Status:Department: 11/15/2007 4/29/2008 Approved Building Comments:04/22/08 As staled in pre-construction meeting notes,corrected as built plans 10 reflect the actual construction and detail will be required prior to CO issuance. Approval Reviews: File Received:Review Completed:Reviewer:Status: 12/18/2007 1/9/2008 Carolyn McEndaffer Approved Comments:02/12/08 Response received.See permit package. emailed to Pam &Steve (Architect) 1/9/2008 1/11/2008 Carolyn McEndaffer Approved Comments:Reviewed submitted information on grade plane.Meets grade plane and 50%s long as foundation walls,slab,and finished floor are at heights shown.Finishe grade per heights shown.Called Pam.CM 1/11/08 1/9/2008 1/28/2008 Carolyn McEndafter Approved Comments:2/12/08 Recieved response to Struct,MEP.See permit 01/28/08 Faxed to Pam. 2/11/2008 2/11/2008 Carolyn McEndaffer Approved Comments:02/12/08 Received response. 02/11/08 Faxed to Pam (Gas Review) 2/19/2008 2/19/2008 Carolyn McEndaffer Approved Comments:02/19/08 Faxed 2nd review of Civil Sheet 1 of 1.CM 3/12/2008 3/12/2008 Carolyn McEndaffer Approved Comments:04/07/08 recieved response.See permit. emailed and faxed Pam Approvals: File Received:Decision Date:Status:Department: 11/15/2007 11/15/2007 Approved County Health Comments: Permit Record Report Page 5 of 7Printed:4/30/2008 Permit Number:8445 Approvals: File Received:Decision Date:Status:Department: 12/6/2007 12/6/2007 Approved Fire Comments:04/29/08 Please see attached recommendations for wildfire abatement. Comply prior to release of Co. Approvals: File Received:Decision Date:Status:Department: 11/15/2007 11/30/2007 Approved Light and Power Comments:12/1 7/07-OK to release per Bob Goehring with note that infrastructure fees have not been paid at this time. Approval Reviews: File Received:Review Completed:Reviewer:Status: 11/30/2007 11/30/2007 Mike Mangelsen Approved Comments: Approvals: File Received:Decision Date:Status:Department: 11/15/2007 4/18/2008 Approved Planning Comments:Full compliance with Development Plan 07-14. Erosion control shall be maintained throughout construction process Shall contact planning staff one month prior to request for Certificate of occupancy to arrange site visit and allow ample time to comply with development plan issues such as revegation,parking,lighting,etc. HEIGHT LIMIT:Surveyor shall provide certification the structure complies with maximum height limit set forth in the EVDC. Approval Reviews: File Received:Review Completed:Reviewer:Status: 4/15/2008 4/18/2008 Dave Shirk Approved Comments: Approvals: File Received:Decision Date:Status:Department: 11/15/2007 1/15/2008 Approved Public Works Comments:1/15/08-Approved permit for release per Scott Zurn.CB Approvals: File Received:Decision Date:Status:Department: Permit Record Report Page 6 of 7Printed:4/30/2008 Permit Number:8445 11/15/2007 11/15/2007 Approved Sanitation Comments: Approvals: File Received:Decision Date:Status:Department: 1 1/1 5/2007 11/16/2007 Approved Water Comments:Approved per CT-no charges at this time. Certificates: Temporary Certificate of Occupancy Certificate of Occupancy Issued:Issued: By:By: Expiration:Occupancy: Conditions: Date:Status:Code: Condition Description: Condition Comments: Violations: Violation Date:Violation #:Agency:Status:Deadline: Violation Description: Other Fields: Work Discription New 14 Unit Accommodation/Wedding Bldg. A-3 213 New Hotels,Motels,Cabins Permit Type Building Permit Record Report Page 7 of 7Printed:4/30/2008 Permit Number:8445 V-B Assembly $3,332,411.70 No 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sig