Loading...
HomeMy WebLinkAboutPERMIT 1754 Fish Hatchery Rd Floodplain Dev 2016-01-28Received Date [ p TOWN OF ESTES PARK FLOODPLAIN DEVELOPMENT C/AY') SPECIALTY APPEICATICY /PE 1 IT Inspection Request Line: (970) 577-3731 Permit Number FP- Received By i ...._ Applica i n Expires / ' / :2 Closed Date y This permit does not replace/exempt Permit xpireS I required building permits. JobAddress: 1754 Fish Hatchery Road ParcelNumber:16000938 Owner Name: Town of Estes Park Phone 4: 970-577-3732 Owner Address: 170 . _Gregor Avenue Estes Park, Colorado 80517 Street) OW) (State) 00 Engineer Name: Matrix Design Group, Inc. Town Business 303-572-0200 Only Colorado PE s may apply) tiCen.WM MA Phone 4: Engineer Address: 1601 Blake Street, Sul e 200 Denver, Colorado 80202 (Street) (City) (State) 00 Contact Email Address (required): scott schreiber@matrixdesigngroup. com SEE REVERSE PAGE FOR SUBMITTAL REQUIREMENTS - TWO SETS OF DOCUMENTS ARE REQUIRED. INCOMPLETE APPLICATIONS WILL NOT BE ACCEPTED. Work description: 0 pLojecL rtco is 2, suu lineal LeeL oi tdllRTvei tThcii11 located q.D flLL1eS west of downtown Estes Park, near the Fish Hatchery Road Bridge. The project will be completed in two phases. This permit is prepared for Reach 1 work only 14- . IPivr TTyrrrtp1nt IJppr Fiqh Rpt y Strpm (labor and material): Work will fill eroded bank, remove loose materialand de s is Contractors F yWate . 150,000 Authorization Only Colorado registered engineers may apply for floodplain development permits. I hereby certify this application is true and correct. After project completeness, I agree to certify whether or not the work was performed according to the approved permit. II certify that I have the property owner's authority and permission to apply for this permit. , „-- 0 7,„ ' , $ . ,,i - " Print Name: Scott Schreiber Signature: '';,,,;„-,, -., Date: 0 -27- 6 OFFICE USE ONLY All required information has been provided. The Base Flood Elevation(s) of the project reach is/are K#49/1:::' feet El Source: FIRM Profile(s): 0 Elevation to which structure(s) is/are to be elevated / floodproofed: evi,„4 feet Required deferred submittals: 0 EC on FEMA form by Colorado licensed surveyor. A164 ED Certificate of fioodprcofing by Colorado Architect or Engineer. EjThe proposed development islocated in the: (21:Floodway Efload Fringe [1404 Permit No Rise Cert. Staff Approval: 7' ,,za , 71.L.,-, ,-;,,,.-7;;;:' ,/, ,c:,,, Date: Ze, i do"; — 49,2 - ey Permit Fee r, ,4'merit'''' 77; d. ALAYEi v tl V loodpIdem Marqgernont:q IP 06 I orny, P Forum PPI mut 0codpl,Hn Dev App ?I) 31Rewsed Drdtl xbc E Filed . _ TOWN OF ESTES PARK DIVISION OF BUILDING SAFETY 170 MACGREGOR AVE. I P.O. BOX 1200 I ESTES PARK, CO 80517 I PH. 970-577-3726 I FAX 970-586-0249 I WWW.ESTES.ORG ItY � 1 Complete, and submit a Town Floodplain Development Application/Permit! for any and all construction activity proposed within fkoo6p|ainboundaries. y� (A) Accurately describe the activity proposed. QJ (B) Submit individual applications for each property, [] ([) Submit $SU.UOfee per Section l7.2&.O90o/the Municipal Zoning Code. ����NN���UA�������U�������� ... ~ ~~~~....~.. ..�~�~~~..�.~.~~~.~ FLOODPLA0N DEVELOPMENT PERMIT 2 Provide the following documents: (A)Anaccurate site plan, detailing all construction activity proposed within floodplain boundaries, including: [] (1)Flood-fringe and fl�modwayboundaries [� (2)AU reference marks [� (3)AUproperty lines El (4)AU existing and proposed structures located within the Special Flood Hazard Area (SFHA). (5) If applicable, the lowest floor elevation (crawl space, basement, etc.) of all structures on the property within the SFHA. [] (6)|fapp||cabUe^ specify the lowest elevation to which structure(s) are/will be f|oodprooted, [l (7)A|| easements [] (8) All public rights -of way. (Rights -of -Way work permits may be required,) DM (B)[nnstructiun plans and specifications, sealed by Colorado Registered Engineer. Said Engineer shall be the Engineer of Record. Special inspections and letters of compliance are required. FLI (C) A copy of the relevant section of the applicable FIRM (Flood Insurance Rate Map), and identify the specific location and reach nfthe proposed activity. FX1 (D) A copy ofthe appropriate profile from the Flood insurance Study (RS)' with the reach and Base Flood E|evatinns(8FEs)nfthe proposed project accurately identified. (E) If proposed activity occurs within a floodwaiy or wetlands, submit the following: (1)Acopy of the approved pennitbsued by the United States Army Corps ofEngineers (USACE)'OR (2)Acopy ofthe letter issued byU5A[Estating apermit isnot required. (3)|fapplicable, describe any alterations tothe Moodway (bank stabilization, fill, excavation, etc.) (4) An accurate cross section of the channel at the site of the proposed activity, inclucling� (a)Depiction and ;abe�ngofboth existing and proposed conditions. (b) Vertical (eAevations)and horizontal dimensions (distances) and references, (c) Base Flood Elevation(s) (BFE), including flood fringe and floodway boundaries. 000E100E1 3 The Engineer of Record shall be responsible for monitoring work authorized by this permit, and SHALL SUBMIT: (A) ALetter nfCompliance upon completion nfsaid activi�ty, stating whether ornot the work was performed iocompliance with plans and specifications apprnvedbythe permit. Subnn/ttOI222OI6 o/Do�e — — R (8) No -Rise Certification for work performed within the fluodway, Su bmittal 0I222OI6 _�o�e ��"±'������ United States Army Corps ofEngineers, Omaha District Denver Regulatory Office /Permits 9307S.Wadsworth Blvd. Littleton, CO 80128'6901 USACEPhome: 383'979'4I20 FEMA Regional Manager: Matthew Buddie TOWN OFESTE6PARK DIVISION OFBUILDING SAFETY 1rvmACGREGORAVE, I pO.BOX 1zvv1EST6aPARK, Conom71PH. e7u-57r372a|FAX g7o-540-0, $!mvVVv,FSTFS.ORG o:\nvvuplam,Momagoment\pp_10o m,ms\pp_Fv,rns_penna\Fmmun/am_oev_Apm_Subm/ua/_mmu/,ememts_20z3_Ro,/,eu.x/m ASSO rA, -rEs January 29, 2016 Mr. Scott Schreiber, PE Matrix Design Group 1601 Blake Street, Suite 200 Denver, CO 80202 RE: Floodplain Development Permit for Fall River Hydroplant Reach 1 Dear Mr. Schreiber, Thank you for submitting the Town of Estes Park Floodplain Development Permit (FPDP) for proposed activities on Fall River near the Hydroplant. The FPDP contains 68 pages of information and is signed and sealed by you, Colorado P.E. #46577, as the Owners' Agent. All attachments to the FPDP are dated January 22, 2016, and have been reviewed by me on behalf of Will Birchfield of the Town of Estes Park. The submittal includes a description of construction activities and the anticipated impact to the floodplain, site photographs, and detailed construction documents. All proposed activities qualify as development in a FEMA-regulatory floodway and flood fringe, and are subject to the standards of Title 17 of the Town of Estes Park Municipal Code (Title 17 Code). have reviewed the FPDP and supplemental information packet and recommend it be approved. Please be aware that you will need to provide a certification, post -construction, that the work performed meets that approved in the attached permit. If you have questions, concerns, or require clarity on any of the review items included herein, please let me know by phone or e-mail. I am at your service, and look forward to assisting you to successful completion of this project for Estes Park. Sincerely„ Amber Kauffman, PE, C Group Leader, Olsson Associates akauffrnanolssonassociates.00171 970.635.3710 Cc: Will Birchfield, CBO, CFM, Floodplain Administrator, Town of Estes Park Alison Chilcott„ Town of Estes Park Karen Thompson, Town of Estes Park Tina Kurtz, Town of Estes Park 5285 McWhinney Blvd., Sulte 160 TEL 970.461.7733 Loveland, CO 80538 FAX 970.635,3709 www.olssonassocl es.corn Scott Schreiber, PE Page 2 January 29, 2016 General Comments: 1. Upon project completion, a Letter of Compliance and a No -Rise Certification will be required by the Engineer of Record stating that the construction was performed in compliance with plans and specifications approved by the permit. 2. It is recognized that the application does include the required site plan information, on separate documents. A phone call to Scott Schriber detailed the green Iinework on the Annotated FIRM map as property lines and that the full project occurs on Town of Estes Park property. The submittal included construction plans, a hydraulic model that evaluated the impact of the proposed improvements against the existing channel conditions, a US Army Corps of Engineers 404 permit, and a letter detailing the proposed improvements and their impact to the floodplain of Fall River. 5285 McWhinney tivd Sude 160 TEL 970A61 7733 LoveFarid, CO 80538 FAX 970.635.3709 www.olssonassociales.COM