Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 1976-04-27BRADFORD PUBLISHING CO., DENVER RECORD OF PROCEEDINGS Public Works Committee ✓ April 27, 1976 Committee: Chairman Dannels; Trustees Petrocine and Sutter Attending: Chairman Dannels; Trustee Sutter Also Attending: Town Administrator Hill, Director of Public Works Van Horn Absent: Trustee Petrocine EAST RIVERSIDE PUBLIC REST ROOMS: Remodeling of the interior of the public rest rooms located on East Riverside Drive cannot be accomplished prior to the summer tourist season and, therefore, the Committee recommends temporary repairs for the existing facility at a cost of $643. MUNICIPAL BUILDING PAINTING: Three bids were requested for painting the wood fascia surrounding the exterior of the Municipal Building (approximately 7,000 square feet). One bid was received from Van Camp totaling $1,600. The Committee recommends accepting the bid from Van Camp. POLICE DEPARTMENT AIR CONDITIONING: Bids for the Police dispatching room air conditioner were submitted in two phases. First phase is the electrical service for which Canyon Valley Electric, Inc. submitted the only bid of $260. The second phase involves installation and supply of the air conditioner for which two bids were submitted as follows: Rowe Heating & Service Co. Estes Park Gas Company 18,000 BTU $1,114.00 24,000 BTU: $1,098.30 The Committee recommends accepting the Canyon Valley Electric, Inc. bid of $260 and the Estes Park Gas Company bid of $1,098.30 making the total cost of the project $1358.30. 1976 STREET IMPROVEMENTS: Director of Public Works Van Horn submitted a list of proposed street improvements for 1976 (a copy of which is attached to these minutes). The estimated cost of these proposed improvements is $39,996 whereas the amount of revenue sharing funds budgeted for this item is $50,000. The Committee authorized the Director of Public Works to begin ob- taining bids for the street improvements. WEST RIVERSIDE PARK - SPRINKLER SYSTEM: Of the three bids requested, one bid was received from Chief's Land- scaping in the amount of $2,125.68 for an automatic sprinkler system in the West Riverside Park. The Committee recommends accepting this bid and will submit its recommendation at the Board of Trustees meeting of April 27, 1976. STREET NAMING & NUMBERING: A final list of street name changes was submitted and discussed. The Committee authorized the Director of Public Works to prepare and submit for approval an official street map of the Town incorporating these proposed changes. BRADFCRD PUBLISHING CO., DENVER RECORD OF PROCEEDINGS Public Works Committee April 27, 1976 Page Two (2) STANLEY PARK - IMPROVEMENTS - LIVESTOCK PENS REQUEST: Director of Public Works Van Horn reported that an asphalt pan at the exhibitors' gate onto Community Drive along with a culvert inside the gate will be installed at Stanley Park. Dr. Wesley Metzler, representing the Horse Show and Rodeo Committee, requested that the livestock pens on the west side of the arena be rebuilt. The total cost estimate of the project is $7,000. The Horse Show and Rodeo Committee will fund approximately $4,000 of the project and the Town will handle the removal and site preparation in-house. The Committee recommends approval. A.P.W.A. ANNUAL CONGRESS: The American Public Works Association Annual Congress will be held in Las Vegas from September 25th through 30th. KIWANIS CLUB - PLAYGROUND REQUEST: Phil Switzer of the Kiwanis Club, appeared requesting that the Town designate an area downtown for a playground in which the Kiwanis Club would donate and maintain the equipment. The Committee directed the staff to study the proposal further and report back at the next meeting. MICROPHONES - BOARD ROOM: The existing sound reinforcement system in the Board Room has proven inadequate in producing clear, distinct recordings for transcriptions. A possible solution would be to increase the number of microphones to allow a microphone to be placed directly in front of each Board member. The cost of adding five microphones and a preamplifier would be $1066.60. The Committee recommends increasing the sound system as proposed. PUBLIC WORKS BUILDING: The following cost analysis was submitted on the Public Works Building which is 98% complete: Estimated project cost as of 12-18-75 $177,384.69 Contingency 15,000.00 Total estimated budget 12-18-75 $192,384.69 Estimated project cost as of 4-15-76 $178,931.00 Estimated remaining contingency $ 13,453.69 There being no further business, the meeting adjourned. APPROVED: MAY 11 1976 TO'l:il OF ELITES Pia( BOARD OF TRUSTEES Joan Van Horn, Secretary RECOMMENDED 1976 STREET IMPROVEMENTS PRIORITIES COST 1. 1st Street - 600' x 36' 1" Overlay $ 2,160.00 2. Highway 36 junction 2nd & 3rd - 60' x 36' Stabilize and pave 2' mat $ 410.00 3. Comanche - 800' x 28' 1" Overlay $ 2,240.00 4. Dunraven - 800' x 28' 1" Overlay $ 2,240.00 5. James -Winters Road - 1320' x 24' Pave 2" mat $ 6,160.00 6. Stanley Circle Drive - 4224' x 24' Slurry $ 6,200.00 7. Ponderosa Drive - 2640' x 20' Slurry $ 3,230.00 8. Country Club - Cedar Lane - 2376' x 24' Slurry $ 3,490.00 9. Willow Lane - 1320' x 24' Slurry $ 1,936.00 10. Westly portion Country Club 600' x 24' Slurry $ 880.00 11. Old Ranger Road - 1850' x 24' Slurry $ 2,710.00 12. Old Man Mountain Rd. - 1320' x 24' Slurry $ 1,940.00 13. Fall River Lane - 800' x 24' Slurry $ 1,160.00 14. Landers - 450' x 24' Pave 2" mat $ 2,040.00 15. Miscellaneous parking lot repair $ 3,200.00 T O T A L: B U D G E T: TOWN OF ESTES PARK Bill Van Horn Public Works Department April 27, 1976 $39,996.00 $50,000.00