SOUTH SAINT VRAIN HIGHWAY WALKWAY/TRAIL:
Letters were received from Lee Hartland dba Miles Cottages, Edward
Eisenhauer dba Branding Iron Motor Inn, and Emmy Hesse on behalf of
the owners of Peak to Peak Motor Lodge, objecting to portions of the
South Saint Vrain Highway walkway in front of their establishments.
All three letters complained about the potential damage of the loose
gravel being blown or washed out. Lee Hartland appeared before the
Committee offering to mark the trail in front of his cottages with
edge stripping and eliminate the gravel at his own expense. The Com-
mittee had no objections to his installing the edge stripping similar
to Bond Park's but would not allow the gravel to be removed and assured
Mr. Hartland that an attempt would be made by the Street Department to
hasten the compaction of the gravel in this area.
STANLEY PARK TRACTOR - BIDS:
The following bids were received for an Integral Industrial Tractor -
Loader Unit for Stanley Park (these bids do not include a trade-in):
Frontier Tractor & Equipment Company (Ft. Collins) $ 7,851
NorthernColorado Equipment Company (Ft. Collins) 9,649
Mountain Truck & Equipment Company (Longmont) 8,394
Larimer County Equipment Company (Ft. Collins) 11,770
Denver East Machinery Company (Aurora) -Model MF 30-B 9,756
Model MF 40DSL 9,285
Longmont Farm Supply 9,729.52
Case Power & Equipment (Commerce City) 9,476
The Committee recommends the Horse Show and Rodeo Committee be autho-
rized to select the bid for the tractor -loader.
TALLANT PARK FOOTBRIDGE: ABUTMENTS BIDS AND ALTERNATIVE STRUCTURES:
The following bids were received for the Tallant Park footbridge
abutments:
Emerson S. Ellett, Inc. (Denver)
Doyle McCarthy (LaSalle)
Tom's Concrete (Estes Park)
Diamond Contracting Corporation (Longmont)
The B. W. Fellers Corporation (Denver)
Proto Construction & Paving, Inc. (Aurora)
George Bargelt & Company, Inc. (Greeley)
Centric Corporation (Denver)
Fran & Sons Construction, Inc. (Greeley)
Roche Constructors, Inc. (Greeley)
$14,760
10,700
5,100
9,000
18,800
12,700
13,877
19,800
19,750
13,750
BRADFORD PUBLISHING CO.. DENVER
RECORD OF PROCEEDINGS
Public Works Committee
February 17, 1977
Page Two (2)
The Committee recommends accepting the bid submitted by Tom's Concrete.
Although a suspension footbridge with railroad tie framing was orig-
inally planned for Tallant Park, it was felt that a more rigid struc-
ture would achieve better support of the sewerline. A twin T pre-
stressed concrete structure with wood deck and a laminated wood struc-
ture were researched. A laminated wood footbridge has erecting advan-
tages but is double in cost compared to a concrete bridge. Director of
Public Works Van Horn obtained two price estimates on the concrete
bridge of approximately $7,000 erected. The Committee directed the
Public Works Director to pursue the concrete bridge alternative further.
INFORMATION CENTER - LOBBY FLOOR:
The oak floor in the lobby of the Information Center has deteriorated
in spite of the gymnasium -type finish. Floyd Reister of DMJM-Phillips•
Reister surveyed the situation and recommended an epoxy quartz overlay
material. This type of flooring has proven to be extremely durable in
ski area lobbies and cafeterias where the foot traffic is heavy and
rough. Although the aesthetics of the oak flooring would be sacrificed,
this flooring will require no maintenance and is available in several
colors. The Committee recommends the omnituff epoxy quartz flooring
at an installation cost of $1,080.
OFF-STREET PARKING:
The Committee reviewed and discussed a May 1974 off-street parking
analysis and possible future parking locations and directed the staff
to obtain further information regarding capacity, advantages and dis-
advantages of the various locations.
GRAVEL SUPPLY:
Director of Public Works Van Horn reported that the Town's gravel
supply needs to be replenished and flood recovery funds to pay for the
replacement of the material used in the flood will not be available for
sometime. A reasonably priced supply could be obtained by contracting
with Sterling Paving Company presently to excavate the proposed water
shop site. The Committee recommends expending $10,000 of the street
improvements fund for obtaining the gravel supply.
C.E.T.A. - MUNICIPAL SERVICES WORKER I:
C.E.T.A. funds are available to pay one half the salary of a Municipal
Services Worker I for seven months which includes the summer months.
The Committee recommends obtaining a Municipal Services Worker I through
the C.E.T.A. program.
EAST RIVERSIDE REST ROOMS - BROKEN WATERLINE:
The Committee recommends replacing the broken waterline serving the
East Riverside rest rooms with a larger sized line when the ground has
thawed. A larger waterline would enable the little Park's irrigation
system to be tied in at a later date.