Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 1977-04-11BRADFORD PUBLISHING CO.. DENVER RECORD OF PROCEEDINGS Public Works Committee J April 11, 1977 Committee: Chairman Dannels, Trustees Petrocine and Sutter Attending: Chairman Dannels, Trustees Petrocine and Sutter Also Attending: Town Administrator Hill, Director of Public Works Van Horn Absent: None 1977 STREET IMPROVEMENTS: Director of Public Works Van Horn submitted a list of proposed street improvements for 1977 (a copy of which is attached to these minutes). The Committee discussed in length the last item on the list regarding the South Saint Vrain bikeway. The bikeway is not receiving a great deal of use due to lack of compaction at this point in time. The existing horse use appears to be hindering the compaction somewhat. The Committee recommends paving the bikeway portion along DeVille Sub- division which has not yet been constructed and that this section serve as a "test area" for future bikeway materials. The Committee also recommends the Public Works Director proceed with obtaining bids for the 1977 street improvements as submitted. SALE OF TRUCKS: The Committee recommends proceeding with newspaper advertising to sell the Stanley Park dump truck and dog patrol truck in their current con- dition. TALLANT PARK - GRASS - BRIDGE: The Committee discussed alternative types of grass and sod for Tallant Park. Also discussed was the possibility of utilizing effluent from the Estes Park Sanitation District. The Committee tabled the matter for further study. The abutments for the Tallant Park footbridge have been completed and the bridge will be set on April 19th. REPORTS: OFF-STREET PARKING - Town Administrator Hill briefly reported on the progress of off-street parking acquisition. DRAFTSMAN/SURVEYOR - Mr. Roger Root has been hired as the new draftsman/surveyor and will begin work on April 19th. There being no further business, the meeting adjourned. jl (CA 1 J CA, \ ) C11. 2 tr.J Joan/Van Horn, Secretary APR 121977 STREETS: PUBLIC WORKS COMMITTEE Proposed Asphalt Work April, 1977 1" Overlay Lexington 1550'x24' 4134 yds. 228 ton Brook Drive 670'x24' 1787 yds. 99 ton Davis -Courtney 840'x24' 2240 yds. 124 ton Panorama Circle 620'x24' 1653 yds. 91 ton 542 ton 2" Mat Davis -Courtney @ $18.00/ton = $9,756.00 335'x24' 893 yds. @ $18.00/ton = $1,782.00 TOTAL $11,538.00 99 ton PARKING LOTS: 1" Overlay Municipal Building 275'x24' 734 yds. 41 ton 2" Mat Post Office 300'x28' 934 yds. 103 ton 144 ton @ $18.00/ton = $2,592.00 Estimated preparation work = 2,000.00 TOTAL $4,592.00 TALLANT PARK: 2" Mat Accel. lane 753'x12' 1007 yds. 112 ton Drives 230'x24' 615 yds. 67 ton 150'x24' 400 yds. 44 ton 620'x24' 1653 yds. 182 ton TALLANT PARK cont'd. Parking (10 spaces) ( 4 spaces) ( 7 spaces) ( 9 spaces) (22 spaces) BIKEWAYS: 55'x30' 60'x12' 120'x40' 120'x12' 70'x35' 90'x35' 70'x110' 183 yds. 67 yds. 534 yds. 160 yds. 272 yds. 350 yds. 855 yds. @ $18.00/ton = $12,132.00 Estimated preparation work = 4,000.00 TOTAL $16,132.00 2" Mat South St. Vrain - Manford Ave. to Graves Ave. 1140'x6' 760 yds. @ $18.00/ton = $1,512.00 Estimated preparation work = 1,000.00 TOTAL $2,512.00 GRAND TOTAL ' '$'34,'774'.00 20 ton 8 ton 59 ton 18 ton 30 ton 39 ton 95 ton 647 ton 84 ton