Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 1979-03-15BRADFORD PUBLISHING CO., DENYER RECORD OF PROCEEDINGS Public Works Committee March 15, 1979 Committee: Chairman Dannels, Trustees Houston Attending: Chairman Dannels Also Attending: Mayor Tregent, Town Administrator Director Widmer Absent: Trustees Houston and Wagner 7ti ;:i ErEs Flip:( [i?;;i:D OF T USTEES an Aagn:ei`"^'^'"'~- Hill, Public Works ROBERT HUNT - EAST RIVERSIDE DRIVE BRIDGE: Bob Hunt appeared before the Committee requesting cooperation in the completion of the East Riverside Drive bridge. Specifically, he re- quested the contractor ask permission before placing equipment on his property and that he be notified prior to the street and sidewalk being torn up. Public Works Director Widmer agreed to arrange a meeting with Mr. Hunt and the contractor to discuss these items. MAINTENANCE AGREEMENT FOR STANLEY PARK: A proposed maintenance contract for Stanley Park was reviewed in which the grounds keeper would be an independent contractor rather than an employee of the Town. The Committee discussed adding a provision specifying the months of service to be rendered and directed the staff to contact the Horse Show and Rodeo Committee regarding such a provision. The Committee recommends approval of the contract. PINE TREE MEMORIAL: Roxann West requested permission to to be placed in Bond Park in memory mends approval with the location to Director. donate a two to three foot pine tree of Ida Morris. The Committee recom- be determined by the Public Works BASE MAP PROPOSALS: The Committee reviewed base map proposals, a summary of which is attached to these minutes. Bids from local surveyors were also obtained for additional paneling. The Committee recommends accepting Kucera & Associates'bid for the base mapping and Estes Park Surveyors' bid for the additional paneling. Total contracts will amount to $24,956. STREET IMPROVEMENT BIDS FOR 1979: The Committee reviewed the street improvement bids which are attached to these minutes and recommends accepting the bid of Coulson Excavating Company, Inc. for $30,100.00 WATER SHOP BUILDING BIDS: The Committee recommends accepting the bid from Roche Constructors, Inc. for the Water Shop Building including alternate #2 and that the Public Works Director negotiate with Roche Constructors regarding Alternate #1. (Bid summary is attached). BECKORD PROPERTY DEVELOPMENT: A parking design for the recently purchased Beckord property was sub- mitted which proposes approximately 42 parking spaces. The Committee recommends removing the house, salvaging any worthwhile material for a future Town surplus property auction, and proceeding with preparing the property for the parking as proposed for this summer. The Committee also recommends designating the parking as Parking Lot #11 (Morris). MORAINE AVENUE REST ROOMS: Public Works Director Widmer suggested a contractor be hired to the waterline to the Moraine Avenue rest rooms because the Town adequately equipped to handle the amount of rock involved. The recommends the Public Works Director be authorized to negotiate ject with local contractors. There being no further business, the meeting was,adjourned. A J mot .) )I A J Jo 'Van Horn, Town Clerk lower is not Committee the pro - March 13, 1979 TO: Dale Hill, Town Administrator FROM: ichard Widmer, Director of Public Works Re: Base Mapping Proposals Attached please find a summary of the proposals received for the Base Mapping Program. The low proposal, submitted by Kucera and Associates of Denver, appears to be also the most responsive and therefore I would recommend awarding the con- tract to them for Phase I plus a few topo maps as described below with a provision for Phase II to be budgeted in the near future. I also took proposals from the two local surveyors for some additional paneling or targeting work prior to the actual flight date. These additional panels would increase the ac- curacy and reliability of both our aerial photos and topo- graphical maps. The low proposal (copy attached) was sub- mitted by Estes. Park Surveyors. The amounts recommended for funding now are as follows: 1. Light & Power; 1"..200' Aerial Photos $ 4,500* 2. Town; 1"."100' Aerial Photos 7,185 3. Ground Control 10,450 4. Additional Paneling:19 "easy" @ $22.26 1,021 12 "hard" @ $49.86 5. Topographical Base Maps; CBD area; 3 @ $600/ea. 1,800 Total Items 2 thru 5 $ 20,456 (Total Budgeted 20,500) Total Phase I, Items 1-5 : $'24,956 * To be paid for by the Light & Power Department LI H H O W E.. t Ifl x a ttl Nl Cn w cn to VI- to O. r-1 . CO to yr O o. .o .O ur O O to .. CV IN. yr N O, to .. N. h it O to Cr. w as yr m o a> P. TI o a H ti O'... 0 ri ,--1 - P 'q r-1 d It .-1 or 0 Cl or 0 t•. N or O Cfl Or In try C or c' a} W Cn Q _ O- 1"=100' Aerial Add'1. Copies to ,--1 VI- N .T Vr O to h (NI Vr 0 or $ 40/60 . VT • Price Adjustment After 1 Year Cost of living index O 1% per ,month Renegotiate Renegotiate C" 1"=100' Topo Maps; 8320 Ac. •K r-1 to a.t 0 E4 0 O N . r-1 cn or 0 •O .7 w ,_4 cn VI- $ 32,240 $ 48,100 N h r-1 to ur .7 N N .O CA- . .•. u .,-I L. 0 .O ur O .o yr N .O yr N O. Ur Oi at or O. r-I ra yr t+l F-. w N Q = n._ Phase I Total (1+2+3) WI crl N CV V} $ 26,735 $ 32,450 $ 24,400 $ 25,800 N Q. N 'N' Phase I Sub -Total (2+3) to co .O r- .-1 43- to .O 0 0 N N $ 25,000 O 0 ul CO ...I 1 VT co 0 O. h r-1 ilr $ 21,841 Ground Control C.0 .S ., 0 ri yr 0 0 .. 0 r-I is} 0 0 vl .. .O r-I in- 0 0 O . .-I r-I ar 0I In .O . O. CO- Cr, CO Lr) r-I ur 1"=100' Aerial Photos; 21.6 Sq. Mi. co '-1 h ar in 0 O r1 br 0 to O- yr 0 to h Vr 0 N co il}- 0 O. to or 1"=200' Aerial Photos; L & P 73.2 Sq. Mi. O O V, .7 0 C.. .O .o y, 0 ,ll .7 h L} C. 0 as t/l or O ' 0 C. , h t . to ao t h C/r N w KUCERA & ASSOC. Denver REIDS AERIAL MAPPING -Aurora DELTA AERIAL SURVEYS -Denver MERRICK & CO. Denver M & I CONSULTANT Ft. Collins R&D AEROGRAPHICS Loveland ** .-{ I t-sl. i c•I -.7 ,.0 a 0 O a 0 v 0 ti 4-1 iJ Ca al 0 a 1-. N rl 0 O approximately 160 Acres; 52 Sheet Total Cr, Bid Date: March BID TABULATION co co A • in 0 1-4 l BEST -WAY PAVING CO. —r a 0 4 0 o • 00 o co co cv 0 to cv cr, - 0 o o 0 co $ 10,000.00 � � 0 o - 0 o Lc) cv 11111 — II 0 0 4-1 a $ 32.00 � , 1 0 • cv o „I. cn- $ 20. � OO | in . cv - v-,- co 4.) o E-• 1111111 FLATIRON PAVING CO. Extention $ 26,100,00 » 2,700.00 o ocp .n V o r rs 0 0 V) CO -�Unit Price $ 29.00 0 44-; <1> � $ 275.00 r— . ....7 .—t </ 0 0 . c.4 u)- ,--1 al 4.) 0 E-, 11111 III $ 44.700.00 / . / COULSON EXCAVATING Unit Price Eoteutioo � 0 0 0 .., c.,.. 0 c.1 o o 0 ., ,,, .. U 0 0 . 0 ,„ $ 2.60 $ 2,600.00 | | 0 0 . 0 0 , .. 0 4.1 .0- 1 Ex+ootloo c' 990 • 0 0., rs, c.4 4). • 0 cl .-4 V} • 0 0_ rq 41- � $ 13,000.00 — i $ 22.50 ; Lrl [NI tn- 0 0 • r-I 41-' Total STERLINoPAV' Unit Price 0 0 CN1 4)- | | |s 3O,00 | $ 700.00 0 0 • CV 41- 0 0 • -4)- ..-1 4-) 0 03). 4.) 113 el 4-1 fll 1 ------ Extautiou n 0 ul N. c0 Lr) 4%1 v4 0 0 4,1 c0 , g 45O,0O � CD CI 0 0 0 .0 - 4)- 0 0 0 P1 <11. 0 0 LI" tri r-I w t•-•• c,) Ch. I III S- (1. (I -,- . t r 1" Unit Price| vl 1.-.. CO 04 4)- C Lc, . . C VT '-- i S225.O0 � 0 0 O4 e--1 4)- 0 0 CO 4)- Total . — Bit. Conc. - or. Ex. 900 rnu � 3/4" oit, Con.- Gr. E. uo r^u Manhole Adjustment 2 Each Street Patching - 2" 500 S.Y. / i | 900 Ton � 2 Each k 0 0 H .0 ..0 >4 u) 0 0 ul a 0 0 CD ., .—I Item Description �'�Bit. Conc. - or. Ex. • 1 0 i . 0 0 0 • 44 ri P Z.7 .-- MI Manhole Adjustment Street Patching - , | .0 1) ta. P., H I .0 1.4 7 0 4.4 •,-4 0' ... ,.. (-4 in .4. tn .. _ TOWN OF ESTES PARK BID TABULATION Q\ r-I Bid Date: Contract Time: Thomas Kress Project Engineer: ►� O H 0 0 O 0 ir1 N r-I $ 135,729.00 $ 143,740.00 $ 149,372.00 $ 178,153.00 Rock Excavation r••1 O O H O O O 0 M 0 0 Ul On $ 600.00 0 0 O O 4 r-I $ 400.00 Unit Price P/cu. yd. O O ul r { vl I-- 4 0 0 O cn 0 0 O t-. 0 0 O N Alternate #2 (Stepped Building) O O u'1 n u1 rI 0 0 M ri 0 N $ 2,819.00 $ 1,481.00 $ 16,400.00 Alternate #1 (Storage Deck) $ 2,700.00 $ 6,200.00 $ 7,303.00 O 0 cn N Li $ 5,080.00 Base Bid O O Lrl N -4' O N r-1 0 0 r,.l N .7 r N r-I • 0 0 CO r-I 0 cr1 M r-I $ 139,248.00 0 O M n N VD 111 r-1 2 44 Engineer's Estimate Roche Constructors, Inc. - Greeley Concrete Construc- tion - Loveland Mountain Plains Const. - Ft. Collin Bachler Constructioli Inc. - Longmont II r 1 N rl III 1 .7 in•p r� CO O� O .--I cu. yd. of Rock Excavation O N Total based on estimated quantity of