Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 1982-11-18BRADFORD PUBLISHING CO., DENVER RECORD OF PROCEEDINGS ✓ Public Works Committee November 18, 1982 Committee: Chairman Dannels, Trustees Houston and Wagner Attending: Chairman Dannels, Trustees Houston and Wagner Also Attending: Mayor Tregent, Town Administrator Hill, Public Works Director Widmer REQUEST FOR FENCE - EAST RIVERSIDE BRIDGE: A letter dated October 26, 1982, from Mr. and Mrs. Bill Nelson, regarding a fence on the southwest corner of East Riverside Bridge, was referred to this Committee. Mr. Nelson appeared before the Committee to express his concern for the safety of pedestrians crossing this bridge and requested a fence be installed. After a lengthy discussion, the Committee recommends that the Public Works Director design a rail -type fence and report back to the Committee next month with the estimated cost for this project. PRIVATE BRIDGE PROJECT - DISCUSSION OF BRIDGE SIZES: Public Works Director Widmer and Disaster Recovery Manager Kistner reported to the Committee on the replacement of the private bridges lost in the flood. The engineering bid was awarded to Rocky Mountain Consultants, Inc. of Estes Park. The preliminary engineering estimates to replace six single lane bridges at $38,000 and three double lane bridges at $63,000 are within the $400,000 budget. When the construction bids are received, if it is within the budget, the bridges will be built as indicated above. If it is necessary to balance the budget, the double lane bridges will be reduced to single lane bridges. NAGL WALKWAY BRIDGE: Director Widmer reported that the Nagl walkway bridge would be lifted and moved aside in order to put in a new abutment on the north side of the river. Director Widmer stated that he had designed the abutment and requested the Committee allow him to negotiate the concrete work with Pinson Concrete. Director Widmer also stated that the crane needed to lift the bridge would cost approximately $1,500. The Town will pay 25% of the cost to repair the bridge. The Committee recommends that Director Widmer negotiate the concrete work with Mr. Pinson. CURB, GUTTER, SIDEWALK - 172 W. ELKHORN AVENUE: dz. e. ate- c� The Town Board referred the curb, gutter, and sidewalk along"172 j! W. Elkhorn Avenue to this Committee. The Committee recommends the property owner install a 6 foot sidewalk with curb and gutter alongf .e .a U this property to match the bridge. TOWN RECOMMENDATIONS FOR STATE HIGHWAY PROJECTS: A list was received from Larimer County of its requests to the State Highway Department for future highway projects. The following Estes Park area projects are included on the list: Priority #10 Signalization at U. S. 36 at Mary's Lake Road Priority #17 U. S. 36 from Lyons to Estes Park Priority #18 Colorado 7 from Meeker Park to Estes Park The Committee recommends requesting that Larimer County place the following state highway projects on the list as Estes Park priorities one and two: BRADFORD PUBLISHING CO., DENVER RECORD OF PROCEEDINGS PUBLIC WORKS COMMITTEE - November 18, 1982 - Page 2 Priority #1 Expand U. S. 34 to three lanes from the existing three lanes east of Estes Park to the intersection of U. S. 34 and U. S. 36. Priority #2 Redesign the intersection of U. S. 36 and S.H. MUNICIPAL BUILDING ENERGY USAGE: Director Widmer reported that the October, 1982, electrical usage for the municipal building was 60,480 KWH compared to a five-year average of 63,360 KWH for the same period. We used 11% less electricity for a theoretical savings of $430.00. BOY SCOUTS REQUEST TO USE PARKING LOT #2: A letter dated November 15, 1982, from Gary Shanfelt was received requesting permission to use the front portion of parking lot #2. Mr. Shanafelt stated that the Boy Scouts would like to sell Christmas trees from December 5th to December 23rd at this lot. The Committee recommends approval of this request. REPORTS: Director Widmer reported that the Stannie Jones house was sold for $1,367 to Mr. Todd Plummer and that Mr. Plummer had posted a performance bond and would be moving the house sometime next week. The Fall River Drive repair is underway - scheduled for completion by December 1, 1982. There being no further business, the meeting adjourned. 1 Wit ii'r Estes KM CJARD OF TRUSTEES j n NOV 2 31982