HomeMy WebLinkAboutMINUTES Public Works Committee 1983-08-23BRADFORD PUBLISHING CO., DENVER
RECORD OF PROCEEDINGS
Public Works Committee
August 23, 1983
Committee: Chairman Dannels, Trustees Houston and Wagner
Attending: Chairman Dannels, Trustee Houston
Also Attending: Town Administrator Hill, Public Works Director
Widmer, Planner Cole, Clerk Jensen
Absent: Trustee Wagner
RIVERFRONT PARK - DESIGN PROPOSALS:
The Public Works Committee considered two proposals for design
services for Riverfront Park. The firms represented were EDAW, Inc.
of Fort Collins, and The Landplan Design Group, of Englewood, Colorado.
Each firm gave background information and presented the scope of
services to be provided. Mr. Herb Schaal, Principal, and Mr. Russ
Butler, Senior Associate of EDAW, Inc. explained that they would
provide the landscape design and would work with McLaughlin Water
Engineers for the river hydraulics and civil engineering work, and
Larsen Associates for architectural services. The estimated cost
to design Riverfront Park as presented by EDAW, Inc. is $29,666.50.
Mr. Neal Bastable, Principal of The Landplan Design Group, and Mr.
Tony Pierce, Principal with Roecker Pierce Design Group, explained
that they would be working together on the project. The Landplan
Design Group, Inc. would be responsible for the landscaping design;
Roecker Pierce Design Group would do the architectural design work;
Greenhorne and O'mara for the river hydraulics; Mr. Richard Lee,
President of Technology Constructors, for construction pricing, along
with design and material alternatives to keep construction costs
within budget; Mr. Dave White to provide fishery design guidelines
and performance standards for the river; Aspen Companies to provide
the irrigation design work; Van Horn Engineering to provide surveying
and base mapping services. The Landplan Design Group estimated cost
for design is $30,000.00
The Committee considered the various aspects of each proposal. After
a lengthy discussion, the Committee recommends that The Landplan
Design Group be awarded the design proposal contract for Riverfront
Park conditional upon all the land problems being resolved.
There being no further business, the meeting adjourned.
Ann E. Jisen, Town Clerk