Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 1984-03-14BRADFORD PUBLISHING CO. RECORD OF PROCEEDINGS < Public Works Committee March 14, 1984 Committee: Chairman Dannels, Trustees Houston and Wagner Attending: All Also Attending: Mayor Tregent, Town Administrator Hill, Public Works Director Widmer, Clerk Jensen VEHICLE BIDS: The Committee reviewed the attached vehicle bids for a 1/2-Ton Pickup, a 1/2-Ton Truck and a 1-Ton Truck for the Public Works Department. The Committee recommends the bids be awarded as follows: 1/2-Ton Pickup 1/2-Ton Truck (Bronco) 1-Ton Truck Davidson Chevrolet Sill-Terhar Ford Fisher Chevrolet $ 5,422.00 $10,641.22 $11,151.63 $27,214.85 1984 STREET IMPROVEMENTS: Public Works Director Widmer presented the 1984 Proposed Street Improvements to the Committee for their review (see attached list). Director Widmer stated that the priorities for the most part were established using the Pavement Management Study. Using a two-inch overlay, this year's budget will allow a little over three miles of streets to be overlaid. After a brief discussion, the Committee recommends approval of the 1984 Street Improve- ments. REPORTS: The Riverfront Park drawings and specifications have been de- livered. Wp haye the deed r the 291 West Elkhorn Avenue and the old -S AiitS NSgt�'aYltI uil inq'h8s been torn down. Because of the legal problems with the remainder of the property, the park will not be built this spring. The trash receptacles and benches for the park were ordered along with the ones the URA ordered for the streetscape project. NCE, Inc. will be presenting a price to construct Peacock Park sometime next month. The Highway Department informed us that we need to change the width of the Crags Drive Bridge. The bridge had been 26 feet wide with two six-foot sidewalks. The deck is now 28 feet wide with two five-foot sidewalks. The Highway Department approved the contract but it will cost the Town approximately 20% of $2,000.00 for the design change. The streetscape project will impact the Public Works Department. Mike Mangelsen will be spending several hours a day on the project to insure that the storm sewer flow lines, etc. are installed to Town standards. Mike's time will be charged to the Urban Renewal Authority. There being no further business, the meeting adjourned. MAR 2 71984 Ann E. Jensep'( Town Clerk DEALER TURNPIKE FORD Town of Estes Park Estes Park, Colorado 80517 VEHICLE BID - PUBLIC WORKS DEPARTMENT (1) I -Ton Pickup, (1) z-Ton Truck & (1) 1-Ton Truck 1-Ton 4x4 Cab & Chassis No Bid 2-Ton 4x2 Pickup $ 6,560.02 - 800.00 $ 5,760.02 Bronco II S-10 Blazer $10,911.41 Total 3 Vehicles (No Trade) Total 3 Vehicles (w/Trade) DAVE TAYLOR No Bid $ 7,179.87 $10,876.97 GHENT MOTOR CO. (Ford) $11,492.63 $ 6,510.43 $10,777.11 $28,780.17 $28,780.17 (2) SILL-TERHAR FORD $12,550.06 $ 6,426.79 $10,641.22 $29,618.07 $29,018.07 - 600.00 (2) $ 5,826.79 RAINS FORD $12,431.50 $ 6,660.43 $10,780.51 $29,872.44 $29,272.44 - 600.00 $ 6,060.43 CANYON FORD $13,029.50 $ 7,517.00 $11,319.50 $31,866.00 $31,566.00 - 300.00 $ 7,217.00 FISHER CHEVROLET $11,151.63 $ 6,287.23 $10,594.58 $28,033.44 $28,033.44 DELLENBACH CHEVROLET $11,992.00 $ 6,630.00 $10,919.00 $29,541.00 $28,641.00 - 900.00 $ 5,730.00 (2) DAVIDSON CHEVROLET $11,601.00.. $ 6,422.00 $10,968.11 $28,991.11 $27,991.11 -1,000.00 $ 5,422.00 * Budget $17,000.00 $ 8,000.00 $12,000.00 TOTAL - 3 Lowest Bids $27,168.21 w/Ford Bronco $27,214.85 Town of Estes Park Estes Park, Colorado 80517 1984 PROPOSED STREET IMPROVEMENTS A. 2" Overlay (In approximate order of priority) LOCATION 1. Prospect Avenue 2. Brodie Avenue 3. Community Drive - S.H. 7 to Graves Ave. 4. Community Drive - Graves to Manford 5. Stanley Circle - North 6. Stanley Avenue - U.S. 36 South 7. East Riverside - Ivy to Crags Drive 8. West Riverside 9. Ivy Street 10. Third Street 11. Grand Estates Drive - East 12. Lexington Lane - Concord Street 13. Highland Lane 14. Steamer Drive 15. East Riverside - Elkhorn South 16. Driftwood Avenue 17. Brook Drive - Avalon to Acacia 18, Virginia Drive - Bank Alley North 19. Peak View - Longs Drive to Devon Drive 20. Elm Avenue, etc. LENGTH (Ft.) 1126 1977 2621 425 2080 480 1145 1156 120 882 1295 656 846 1534 90 AVG. WIDTH (Ft.) 24 24 24 40 20 31 23 24 41 32 20 21 19 22 50 AREA EST. $COST(1) SY 3003 $ 19,000(2) 5272 20,000 6989 1889 4622 1653 2926 3083 547 3136 2878 1531 1786 3750 500 1984 CUTOFF 26,600 7,200 17,600 6,300 11,100 11,700 2,100 11,900 10,900 5,800 6,800 14,300 1,900 867 20 1927 7,300 1227 23 3136 11,900 1200 24 3200 12.200 760 28 2364 9,000 838 20 1862 7,100 TOTAL (1 - 15) $173,200 TOTAL BUDGET $183,100 The above list represents the approximate priorities for 1984. Depending upon bid prices, the list may be added to or subtracted from. NOTES: (1) (2) Overlay costs estimated using $32.50/ton + 2% patch @ $11.25 = $3.80/sy. Prospect Avenue estimated using 4" overlay + petromat @ 1.25/sy from Stanley Avenue to Columbine (406 lf) and 2" overlay + petromat from Columbine west (720 lf). Town of Estes Park 1984 Proposed Street Improvements Page two Estes Park, Colorado 80517 B. Parking Lot Improvements: Municipal Building - remove dirt area at rear of building, pave, create two new parking spaces, remove and pave three islands - 80 tons @ $35.00/ton $ 2,800 Dirt Removal and preparation, labor 1,200 Concrete curb - 150 if @ $10/lf 1,500 Base - 30 cy at $7.50/cy 225 TOTAL $ 5,725 TOTAL BUDGET $219,130