HomeMy WebLinkAboutMINUTES Public Works Committee 1985-04-18BRADFORD PUBLISHING CO.. DENVER RECORD OF PROCEEDINGS / Public Works Committee April 18, 1985 Committee: Chairman Wood, Trustees Brown and Hix Attending: Chairman Wood, Trustee Hix Also Attending: Town Administrator Hill, Public Works Director Widmer, Finance Officer Vavra, Clerk O'Connor Absent: Trustee Brown MUNICIPAL BUILDING - REVIEW OF BIDS FOR POLICE DEPARTMENT REMOD- EL: The following bids were received on April 16, 1985 for the Police Department Computer Room Remodel: 1. Concept Design/Build (Paul F. Brown) $ 9,448.03 2. Dan Brown Construction $11,954.00$11,95.00 3. Hillery Parrack Builders, Inc is All bids included $3,900 to relocate a tolephone brdiscussion Ud th which is presently in the storage room. Following Chief Ault, it was decided to leave the telephone board in its present location, cover it, and eliminate the door leading from the hallway into the Computer Room. This adjustment of 03enawouldireduce the low bid of Concept finalDeprice to be negotiated. The Committee recommends d, with the recommends the bid be awarded to Concept Design/Build with the stipulation as stated above. MUNICIPAL BUILDING - REVIEW OF "INTERPLAN" PROPOSAL:public Works the Committee March 21, 1985, Asi requested bytheir proposal to Director Widmer contacted Interplan the Municipal regarding Building facility. provide facilities planning 4, 1985 indicating a few Interplan submitted a letter dated April reduc modifications that io d be made baddressed atewouldollowse the Scope of Work; issues that Personnel projections per department; Adequacy of space allocations for workCations; Specialized equipment and storage systems;storage, public Special requirements, i.e.: security, access, etc. Based upon the above, Interplan anticipated of maximthe uIntee of $4,000. The Committee recommends approval proposal for a maximum fee of $4,000. 1985 STREET IMPROVEMENT PROGRAM - REVIEW OF BIDS: resented the attached B d Tabu- Pub lation Works Director Widmer presented Program. Or ieSheet for the 198authorization Street izati Improvementand analysis with Widmer also requested authorizatioenter testing a contractttotal of Pavement Management Systems for dynaflect Lane; Aspen Avenue, Grand Estates Drive4andNorth Ridge will enable the of 6,060cfeet at a cost of $2,400. an overlay appropriate to the Public Works Department to designthe length of these streets. variedhconditions that exist along Improvement Program be s. awardedT 5 Street wCototee Best Way Pavi g ds efor 8a total bid of $196,130.50 and Way BRADFORD PUBLISHING CO., DENVER RECORD OF PROCEEDINGS Public Works Committee - April 18, 1985 - Page two that Public Works Director Widmer be authorized to enter into an agreement with Pavement Management Systems to perform dynaflect testing and analysis for a contract amount of $2,400. STREET EQUIPMENT - REVIEW OF MOTOR GRADER BIDS: The Committee reviewed the following bids received for a new motor grader: BIDDER H. W. Moore Commerce City H. W. Moore Commerce City MacDonald Equip. Commerce City Larimer Equip. Fort Collins Central Colo. Equipment Colorado Springs Honnen Equip. Commerce City Power Motive Commerce City Wagner Equip. Denver Western States Machinery Denver 1984 Galion Model A550 1985 JD570A 1985 Champion 710/710A 1985 JD570A FLEET VEHICLE BASE PRICE DISCOUNT TRADE-IN NET PRICE $71,800.00 $9,800.00 $62,000.001 No Bid $115,287.00 $40,350.00 $7,000.00 $67,937.002 $94,406.00 $21,713.38 $3,200.00 $69,492.62 1985 JD570A $94,500.00 $20,000.00 $2,000.00 $72,500.00 1985 JD570 $74,309.00 $2,500.00 $71,809.00 No Bid No Bid No Bid 1Used machine, 950 hours, 9,000 pounds heavier than specifications, on greater turning radius than specifications, do not pick-up/deliver warranty service work. 2Larger machine than specifications, 7,000 pounds heavier than specifications, 7' greater turning radius than specifications - 25' in lieu of 18'. Public Works Director Widmer stated warranty service work, if needed, would be performed by the Town Mechanic. Also requested was a two-way radio in the amount of $1,275. The grader cur- rently being used will be the trade-in vehicle. The Committee recommends the low bid in the amount of $67,937 submitted by MacDonald Equipment with the inclusion of the two-way radio in the amount of $1,275 be accepted making a total bid package price of $69,212. Total amount budgeted was $74,422. TO PURCHASE MULTI -PURCHASE PARKS EQUIPMENT - AUTHORIZATION VEHICLE (TURF TRUCK): The Committee reviewed the following vehicle) on a "turf eturfpedtruck" (a gasoline engine -powered golf cart -type small dump box, power -takeoff unit, top -dresser attachment and aerator: BRADFORD PUBLISHING CO., DENVER RECORD OF PROCEEDINGS Public Works Committee - April 18, 1985 - Page three BIDDER VEHICLE BASE PRICE DISCOUNT Boyd Distributors Denver L. L. Johnson Denver Jacobson T-2000 base unit w/box, power take -off, top dresser Ryan Aerator Cushman 530 base unit w/box, power take -off, top dresser Ryan Aerator $6,960 1,769 $1,052 1,465 $6,982 1,750 1,465 Included NET PRICE $ 9,142 $10,197 The Committee recommends awarding the low bid in the amount of $9,142 to Boyd Distributors for the Jacobson T-2000 turf truck. NATIONAL PUBLIC WORKS WEEK - AUTHORIZATION FOR "OPEN HOUSE": National Public Works Week is scheduled for May 19 - 25, 1985. In an effort to bring greater awareness to the general public, Public Works Director Widmer requested authorization to hold an "Open House" for the Public Works Department on Saturday, May 18th. A proclamation concerning National Public Works Week was also presented. The Committee recommends approval of the "Open House" May 18, 1985 for National Public Works Week with the location to be determined at a later date. STATE MAINTENANCE CONTRACT - DISCUSSION: Public Works Director Widmer submitted a copy of a "maintenance contract" which the State uses between themselves and cities, counties or towns whereby the maintenance of the State Highway System inside the entity's jurisdiction is maintained by the entity themselves in lieu of the State. All painting, major overlaying, signing, traffic control, etc. would remain the responsibility of the State. Snow removal and patching of "pot holes" would be the responsibility of the Town. Pending further ee recommends information action on the State maintenance tcontract at this taking timeno . further PROSPECT MOUNTAIN DRAINAGE STUDY - AUTHORIZATION TO REQUEST PROPOSALS: Director Widmer submitted a drawing of the area included in the Prospect Mountain uosals for1nage Study Drainage and Planandted Storm authorization De ign. request proposals phase $125,000 was budgeted in 1985for theTownthe ability to first'phase" construction. The plan will g' the work that will be required. The Committee recommends ecomndsfor Public c Works Director Widmer be authorized to request proposals Prospect Mountain Drainage Study and that Member Hix be selected as the CApproximatelyttee's representative engineeringnfirmsinterviewing be selected, ering firms. Approximately of which will be local. REPORTS: Streetscape II is proceeding date is May 15, 1985. Wycon Construction is currently pouring the sidewalk for the Crags Drive Bridge; the guardrail should be set prior to the end of the month, with paving completed shortly thereafter. P r)T.fMETO'''haTifi further business, the meeting adjourned. APR 231985 ESTLS i`A K DWA1 OF TRUSTEES rapidly; the anticipated completion Vickie 0'Connor, Town Clerk CO O) L C. DID TABULATION Contract Time: 45 Cal. Project Engineer:M. Mangelsen Best Way Paving C m C CJ N f.%7 in 0 CV 112 m 0 0 /, Qli) 0 0 0 n 0 0 0 r an .` CT C') ... 0 O CD1n N u) 0 0 N CO.-. 0 0 0 u) 18,112.50 178,018.00 18 112.50 1g6_fli_Sn 1 Unit Price 1 in in p .... 32.60 1 0 co 17 1n en .-. 0 O sr N N 0 O In .225 7===1 Total Flatiron Paving Extension 00 sr Q1 Q - O 0 0 1n 1O tD 0 0 0 u) 1.. 0 0 0 O .. 0 u) CO .r 5,850.00 16,875.00 0 o O CV - 212,306.50 Ilo Bid fUnit Price O O t ...1 0 0 P C0 0 0 0 10 0 O in 0 to — 0 O 111 C 0 1n sr 0 O an N on Total Coulson Excavating Extension sr)O N IO N dd.c O O 1O 5,400.00 800.00 1 n 10 r` 1•) CO 00 0 O N 0 0 0 u) 0 0 0 .r 179,700.00 Ilo Bid Unit Price O u7 N ...1 m N 10 o tO O 0 tr 1On .-• 0 0 sr 2.00 0 O Total Engineer's Estimate C U ."1 N C 41 JJ % W 9,482.55 144,900.00 4,830.00 700.00 0 O 0 10 O •. ^" 0 O CO co CO sr 0 in CVO 10 0 . .�. O O 0 0 O . .-• 0 0 W m CVCVtr .. 1n 01n 000 C• ) 0 NCC CO COS . m_ rn 0 . a 4! U -.4 )•1 d L M C to 1n .•+ O N N en 32.20 0 1n 1) 0 10 .—s 0 tO P. r) an n en 100.00 J .16 Total Part 1 Total Part 11 Total y.1 J.) A an N CO _• )- 0 in.-. r `Cr _• H u) > N 0 0 iv Y N an CV N .. I 130 TU. 3,750 L.F. W CsG dd. Y 1/3 sn O 0 Part 1 item Description Street Patching - 2" T .O L CU O 2" Pavement Fabric Patching Fabric Underlavment Ped. Walkways Asphalt Curbing Water Valve Adjust. u 1.. CrU IReclamite Sur. Treat. E Extension d U •.1 w C1. 4.) C 0 1 Total C 0 .1 y C as J.l X W • Unit Price I Total l 'l C 0 .•1 N C 6) u x W Unit Price I ITotal Sterling Paving Extension 12,315.00 0 0 O u) CO tr 0 0 an LO In 400.00 I in N 0 — 0 O O N u) O O 0 in r\ O 0 in N .. 0 In N O N 10na r-u: •+ fc. N Q CO h Unit Price] O O 1n .-4 0 O C7 c) 0 O 01 en 0 0 N 0 C+ 0 O 0 sr O CO N O O u) N ^' •.25 I ...) JJ 0 F Y. ^') JJ C 7 Or r N es) CO 1- cm to v 1- an > N 0 N 1,225 S.Y. I )- 1') 3,750 L.F. . W —O r V) 0 0 1n 00 Part 1 Item Description Street Patching - 2" 2" Overlay u C C! E C) 0.as s N IFabric Patching Fabric Underlayment Ped. Walkways Asphalt Curbing Water Valve Adjust. Part 11 Reclamite Sur. Treat. C) 44 O N 144 1, CO .-.