Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 1987-12-02BRADFORD PUBLISHING CO. RECORD OF PROCEEDINGS -------- "Special" Public Works Committee December 2, 1987 Committee: Chairman Brown, Trustees Barker and Hix Attending: All Also Attending: Mayor Dannels, Trustees Dickinson and Habecker, Town Administrator Hill, Public Works Director Widmer, Finance Officer Vavra, Library Director Hoxsey, Library Board Members Lindsey, McHenry and Wood, Clerk O'Connor Absent: None NEW LIBRARY BUILDING SITE EVALUATION - DISCUSSION: Members of the Library Board appeared before the Committee and. requested reconfirmation from the Town that the "Bond Park Site" could be utilized for a. new library building should this site be selected- Dennis McHenry advised that on February 20, 1986, the Public Works Committee did authorize the Library Board to use Bond Park. The Library Board is evaluating Bond Park and the Birch/Bickel Property. Preliminary building features include a two-story structure with the building footprint containing approximately 9,000 square feet. The following criteria was used to prepare the site evaluation study: • Convenience of year-round vehicular access. • Pedestrian accessibility from residential and activity centers. • Probability of finding convenient parking upon arrival. • Land cost. • Site development cost, including sitework and landscap- ing. • Site utilization. suchas site access, building orientation and footprint, and parking. • Site characteristics such as views, environmental impacts and special features. • Simplicity of building configuration and.. capacity for expansion. Bond Park Site. Two (2) alternatives for placement of the new building in Bond Park were presented; however, the drawings do not reflect a final, decision as numerous de- cisions have yet to he determined. The community has expressed an interest in keeping the library in Bond Park. Birch/Bickel Site. A firm selling price has not been submitted for this property; however, the purchase price could be approximately $150,000/acre. This property con- tains a requirement that a pedestrian easement be maintained. along the stream running through the property. The Library Board's goal is to select a. site, inform the public, and request formation of a Library District by means of a ballot. question. The Board intends to place the question on the ballot for the General Election in November, 1988. BRADFORD PUBLISHING CO. RECORD OF PROCEEDINGS "Special" Public Works Committee - December 2, 1987 - Page two With regard to the Bond. Park site, Committee members expressed concern with minimum tree removal (a conservative approach must be taken), future expansion, retaining the "common" or "town green" conceptexisting in Bond Park, and retention of all existing parking spaces. General consensus and suggestions of the Public Works Committee were: (1) the new building not exceed 9,000 square feet on one level; (2) as much green. space as possible be preserved; (3) a very conservative approach be used in determining whether any trees must be removed.; (4) the existing structure he removed from the site; and (5) the Board of Trustees receive an opportunity to review the final design of the new library building. There being no further business, the meeting adjourned_ Vickie O'Connor, Town Clerk APPROVED DEC 8 1987 T(Mol Uf ESTES PARK L BOARD OF TRUSTEES