HomeMy WebLinkAboutMINUTES Public Works Committee 1990-04-19BRADFORD PUBLISHING CO.
RECORD OF PROCEEDINGS
/Public Works Committee
April 19, 1990
Committee: Chairman Dickinson, Trustees Barker and
Habecker
Attending: All
Also Attending:
Mayor Dannels, Trustee Hix, Town Admin-
istrator Klaphake, Public Works Director
Widmer, Finance Officer Vavra, Ass't.
Public Works Director Linnane, George
Clausen, Grace Lindemann, Clerk O'Connor
Absent: None
Chairman Dickinson called the meeting of the Public Works Commit-
tee to order at 2:00 P.M.
FAR VIEW DRIVE - REQUEST TO ASSUME OWNERSHIP/MAINTENANCE.
The Committee reviewed a letter submitted by 17 property owners
requesting the Town assume ownership, and provide surfacing and
maintenance of Far View Drive. The owners have agreed to deed a
30' right-of-way. Staff reported that when this area was annexed
in 1974, the property owners were advised that the Town would
pave the street if the necessary rights -of -way could be obtained.
Staff estimates a cost, including surveying, of $33,000 to pave
this street. The surveying portion of this project could be
accomplished during 1990. Following discussion, the Committee
recommends staff be authorized to perform surveying work in 1990,
and, if sufficient funds are available in the 1991 Budget, staff
complete the project, including obtaining deeds, paving, etc.
CLEAN UP WEEK - DISCUSSION.
Since 1965, the Town has supported a "Clean Up Week" Program.
The Committee discussed procedure, and recommends approval of the
following:
1. Proclamation - proclaiming the week of May 7 - 13, 1990
as Clean Up Week in Estes Park. Should inclement
weather deter clean up efforts May 7-13, the week of
May 14 - 20 will be reserved.
2. 1990 Clean Up Week Neighborhood Chairman, as presented.
3. Mayor's letter notifying each chairman of their assign-
ment and responsibilities.
As stated in the letter, household garbage, appliances, and
furniture will not be collected by the Town. The Committee
discouraged the community from including pine needles in this
clean up effort.
PUBLIC WORKS WEEK - DISCUSSION.
National Public Works Week will be observed May 20 - 26. Rep-
resentatives from all divisions of the Department have suggested
a display be presented in the Municipal Building Lobby area
during the week. Personnel will be on hand for approximately 2
hours on Friday to answer questions. Refreshments will be served
and tree seedlings will be given to all who attend. A luncheon,
including a speaker, will be held May 23rd. The estimated budget
is $1,100. The Committee recommends approval of the budget and
schedule as presented.
BRADFORD PUBLISHING CO.
RECORD OF PROCEEDINGS
Public Works Committee - April 19, 1990 - Page two
SIDEWALK/U. S. HIGHWAY 36 - REQUEST AUTHORIZATION TO BID.
Staff has completed design for the 8' sidewalk adjacent to the
pedestrian bridge on U. S. Highway 36. Plans will be available
April 20, and staff is proposing the following construction
schedule: bids due by May 4, Notice to Proceed be issued May 9,
with construction completed by June 8. In order to maintain this
schedule, staff requested authorization to proceed in lieu of
returning with bids during the May Committee meeting. The
project, in the amount of $50,000, was included in the 1990
Budget. The pedestrian bridge is being placed this date.
Discussion included drainage and streetscape lighting. The
Committee recommends staff proceed with the project, directing
staff to advise them of the bid results prior to the Town Board
meeting scheduled May 8. Should unusual bids be submitted, a
special meeting of the Committee will be scheduled.
PARK SHOP HAZARDOUS MATERIAL STORAGE SHED - REVIEW OF BIDS.
The Committee reviewed two bids for the aforementioned storage
shed:
Safe Environmental Storage Corp. $12,310.00
Safety Storage Inc./Carl Hime Assoc. 8,890.50
$10,000 was budgeted for this steel structure. The Committee
recommends the low bid in the amount of $8,890.50 submitted by
Safety Storage Inc. be accepted, suggesting consideration of an
unobtrusive color be given to the exterior walls.
MUNICIPAL BUILDING:
Lease/Colorado Department of Revenue. The Committee reviewed a
standard lease between the Department of Revenue and the Town for
Room 207 which will house the driver's license facility. The
2-year lease, which has been reviewed by Town Attorney White,
will become effective following the remodeling/relocation proj-
ect. The Committee recommends approval of the lease as present-
ed.
Remodeling Project. Director Widmer reported that the bid
opening has been postponed to April 23rd due to questions arising
on the electrical system and records vault. In the interest of
„.time, staff requested bids be submitted directly to the Town
„`� oard during their meeting April 24. The Committee recommends
approval of the request; however, should unusual bids be submit-
ted, a special Committee meeting will be held April 23rd.
FLEET MAINTENANCE:
Diagonal Data Users Meeting. Public Works Director Widmer
requested the Fleet Manager be authorized to attend the
aforestated meeting in Bloomington, Minnesota June 11 - 13, 1990.
The Town has purchased the Diagonal Data fleet management soft-
ware, and the meeting will provide a networking opportunity for
staff. An estimated expenditure is $1,000, and adequate funds
have been budgeted. The Committee recommends approval of the
request.
Equipment. The Committee reviewed the following equipment bids:
Pressure Washer
Hotsy Equipment/Denver $3,129.94
ii /Lakewood 2,934.36
II /Boulder 2,448.00
/Greeley 2,215.46
BRADFORD PUBLISHING CO.
RECORD OF PROCEEDINGS
Public Works Committee - April 19, 1990 - Page three
Portable Generator
Estes Park Rent All
1,499.00
The portable pressure washer will be shared between the vehicle
repair shop and the Parks Division. The unit will be used to
clean vehicles undergoing repair, and sidewalks, patios, etc. A
total of $6,000 was budgeted. The Committee recommends accepting
the low bids in the amount of $2,215.46 submitted by Hotsy
Equipment/Greeley, and $1,499.00 submitted by Estes Park Rent
All.
Lube Equipment
Mile Hi -Lubrication $2,399
Mile Hy-Draulics 2,119
With the purchase of the hydraulic fluid dispenser, all shop
fluids will be distributed by retractable, metered dispensing
units. The 1990 budgeted amount for this equipment was $2,150.
The Committee recommends accepting the low bid in the amount of
$2,119 submitted by Mile Hy-Draulics.
12" WATER LINE/HIGH STREET AND PORTION OF LOOP PROJECT - REQUEST
AUTHORIZATION TO BID.
Assistant Public Works Director Linnane briefed the Committee on
the 12" High Street water line, and the 6" Dunraven/Comanche
portion of the Loop Project. The engineer's estimate for both
projects is $89,000. Completion of these projects will result in
increased fire protection and improved water quality. The
remainder of the Loop Project will be completed following receipt
of the Windy Gap Payment. The Committee recommends approval of
the request to bid the aforementioned projects.
CORROSION CONTROL REPORT - DISCUSSION.
George Clausen/RMC, reviewed the Executive Summary of the Corro-
sion Control Report. The study was prepared to determine how the
colored water, a by-product of corrosion, could be treated.
Discussion included chemical inhibitors, public health and
safety, and the corrosion of water lines and the resulting
extensive damage to water pipe. The Colorado Department of
Health, in a letter dated April 16, advised that the use of zinc
orthophosphate, as a corrosion control agent, has been approved
for use in drinking water for many years. The zinc is not a
health concern when used according to the manufacturers di-
rections. In addition, a corrosion control agent will lower the
level of harmful metals such as lead and copper by preventing
their dissolving into the water. Staff reiterated that sodium
hexa-meta phosphate is an alternative; additional research will
be conducted prior to recommending this alternate. Staff is
recommending that zinc orthophosphate be the inhibitor selected.
Additional discussion will take place during the May 17th meet-
ing, and the Committee invited public testimony.
WATER FINANCIAL PLAN - PRESENTATION.
John Gallagher/Black and Veatch, presented the Water Utility
Financial Plan, and reviewed the cash flow analysis, revenue,
requirements, indicated water sales revenue adjustment, and
various tables. The conservative approach found that the water
fund is currently in a strong financial position, and that
certain portions of the 5-year Capital Improvements Plan may
require financing, i.e.; bonds, increased water rates. The
Committee expressed their appreciation to Mr. Gallagher for the
thorough presentation, and recommends the report be approved as
the financial guide for the Water Department for the years
1990-1994.
BRAOFORD PUBLISHING CO.
RECORD OF PROCEEDINGS
Public Works Committee - April 19, 1990 - Page four
REPORTS.
The Committee reviewed the Department's 1989 Annual Report which
listed continuing education and training sessions for its employ-
ees, and street division activity.
The Customer Service Response, and monthly water reports were
also reviewed.
Staff briefed the Committee on the current water projects,
including the Marys Lake Water Treatment Plant, Backwash Meter-
ing, Cascade/Fall River Line, Bailey Lane, Western Inter -Tie,
Fall River/Phase 3, and the Pedestrian Bridge. Concerning the
Moccasin Saddle Project, the contractor is in the process of
preparing the roadway for asphalt. Cement scheduling calls for
the road to be completed by Memorial Day.
Transfer Station fees will be increased by 10% effective May 1st.
Rates are based upon usage of the station.
Town Administrator Klaphake approved the placement of a con-
struction trailer in the parking lot east of the Municipal
Building. Following a brief discussion, the Committee concurred
with staff's decision and moved said placement be approved.
In the spirit of intergovernmental cooperation, staff also
authorized the placement of excess material from the Lake Estes
Project on the fairgrounds property.
The annual water line flushing will begin May 8th. The media
will be notified.
Staff will update the Committee on home mail delivery during
their meeting in May.
There being no further business, Chairman Dickinson adjourned the
meeting at 4:15 P.M.
Vickie O'Connor, CMC, Town Clerk
APR 2 4 1gg0 s;
1(I V OF BIBP�,PK
B_;"'O OF TRUSTEES
TOWN OF ESTES PARK
Public Works 1)rlrirrtrrrrirl
•
April 24, 1990
TO: The Honorable H. Bernerd
Town Board of Trustees
FROM: Richard D. Widmer
Public Works Director
MEMORANDUM
Dannels, Mayor
SUBJECT: Bids for Municipal Building Remodeling
Richard U. Widmer
f)irrclor
Estes 1'drk, Colorado 80517
Bids were taken yesterday for the various work packages for the Municipal Building
Remodeling project. A complete bid tabulation is attached for your information. The
low bids are summarized below:
Bid Package
1. Demo, Carpentry, Misc.
2. Deleted
3. Doors -Materials
4. Windows - Materials
5. Glazing
6. Structural Steel
7. Drywall
8. Acoustical Ceilings
9. Carpet
10. Painting
11. Folding Partition
12. Window Treatments
13. Plumbing
14. HVAC
15. Electrical
Labor None
TOTAL
Low Bidder
Colorado Doorways
Morgan Whiteman
A -Ability Glass
Boulder Steel
Ed's Drywall
Acoustics & Interiors
Carpet Trends
Rocky Mtn. Painters
Won -Door Corp.
Innovative Openings
EP Plumbers/Peak to Peak
Wehr Plumbing
Dehaan Electric
No bid was received for Bid Package 1.
labor to install doors, windows, and
manager, TCM, believes this package to
plumbing, was a tie between Estes Park
solution to this is to use a coin toss
Amount
N/A
$3,759.00
3,042.12
9,288.00
1,775.00
3,280.00
2,875.00
13,798.43
1,622.00
2,611.00
9,418.00
1,396.00
1,498.94
3,251.00
$57,614.49
This package is for demolition, carpentry, and
miscellaneous items. The Town's construction
be worth not more than $12,000. Bid Package 13,
Plumbers and Peak to Peak Plumbing. The normal
to decide the low bidder.
Total of the bids received, furniture, the estimate for Bid Package 1, and a contingency
would be approximately $103,000. The budgeted amount for this project is $112,110.
I recommend award of the bid packages to the low bidders as shown, with Bid Package 1
to be negotiated by TCM to a not -to -exceed figure of $12,000, and the low bidder of
Package 13 to be decided by a flip of the coin.
RDW:ck
TOWN OF ESTES PARK
MUNICIPAL BUILDING REMODEL, PHASE I
April 24, 1990
PKG NAME
2. Combined w/#1
3. Colorado Doorways
4. Morgan Wightman
Builders Supply Inc
Pozzi
Collins Cashway
5. A -Ability
Ilillcrest
6. Boulder Steel
7. Ed's Drywall
8. Acostics & Int
Quality Acostics
J&J Acostics
9. Carpet Trends West
Eheart
Wall 10.
Cover
Painting
Carpet Trends West
Rocky Mtn Painters
Painting McGillicuddy
11. Won -Door Corp
12. Inovative Openings
Cutting Corners
HL Hutcherson
13; EP Plumbers
Peak to Peak
Wehr Plumbing
14. Wehr Plumbing
Gibson Heating
15. Deilaan Electric
Craftsman Electric
J/P Electric
Atkins Electic
BID REPORT
FROM
Denver
Denver
Ft Collins
Denver
Loveland
Boulder
Longmont
Boulder
Estes Park
Ft Collins
Boulder
Ft Collins
Estes Park
Loveland
Estes Park
Estes Park
Estes Park
Denver
Boulder
Estes Park
Estes Park
Estes Park
Estes Park
Estes Park
Estes Park
Loveland
Estes Park
Greeley
Estes Park
Estes Park
PHONE
573-6442
394-2301
482-1320
295-0018
669-6043
443-2349
776-9511
442-7393
586-2962
223-3587
493-4759
586-4042
669-0288
586-4042
586-6518
586-6543
779-8900
449-6465
586-4186
586-2103
586-3698
586-2161
586-3123
586-2123
444-4900 M
586-5590
356-9560
586-8743
586-3657
BID
$ 3759.00
$ 3133.38
$ 3571.09
$ 4198.68
$ 4444.16
$ 9609.00
$ 9936.00
$ 1775.00
$ 3280.00
$ 2875.00
$ 3041.00
$ 4789.00
$13610.43
$16288.00
$ 188.00
$ 872.00
$ 2546.00
$ 2611.00
$ 9418.00
$13292.50
$14889.00
$ 1396.00
$ 1396.00
$ 1460.00
$ 1498.94
$ 3677.00
$ 3251.00
$ 3280.00
$ 3296.00
$ 4335.00
Construction Management
April 25, 1990
Mr. Richard Widmer, Director
Department of Public Works
Town of Estes Park
P.O. Box 1200
Estes Park, CO 80517
Re: Municipal Building Remodel, Phase I
Dear Richard;
Please find enclosed the recommendations of Estes Park TCM, Inc. regarding the
bids received April 24, 1990 on the above referenced project and estimated
amounts in packages for which no bids were received.
TOWN OF ESTES PARK
MUNICIPAL BUILDING REMODEL, PHASE I--1990
RECOMMENDATIONS
April 24, 1990
Bid Package Bid Amount
1&2 Demolition and Carpentry
No bids were received. Many options are available.
It would be our recommendation that a time and
materials contract with a local subcontractor be
obtained. Major materials could be purchased
through TCM, Inc.
Estimated Cost: $ 12,000.00
3 Door Frames, Doors and Hardware
The bid by Colorado Doorways appears to be complete
and we would recommend awarding the purchase order
to them.
Bid Amount: $ 3,759.00
P.O. Box 129, 131 Stanley Ave., Estes Park, CO 80517 Local: 586-9527 Metro: 534-1378
4 Wood Windows
Morgan Wightman was the low of four bidders.
Sales tax had been included, so has been deleted
from the bid. Recommend award of contract.
Bid Amount(less tax): $ 3,042.12
Note: The existing building windows were
manufactured by "Weathershield". The windows
supplied by Builder's Supply are made by
Shelter Supply and will be vary slightly in
size from the existing.
5 Glass and Glazing
A -Ability Glass is low of two bidders for the work as
specified. Sales tax was included which has been
deleted from the bid. Recommend award of contract.
Bid Amount(less tax): $ 9,288.00
Note: Is has been expressed that the existing
stops may not come out in one piece. Should this
occur, new stops will be required. This additional
cost will be $1.00/lineal foot of stop material.
6 Structural Steel
Boulder Steel in the low and only bidder. Their scope of
work appears to be complete. Recommend award of contract.
Bid Amount: $ 1,775.00
7 .Studs and Drywall
Ed's Drywall is the low and only bidder. Their scope
of work appears to be complete. Recommend award of
contract.
Bid Amount: $ 3,280.00
Acoustical Ceilings
Acoustics and Interiors is the low of three bidders.
Recommend award of contract.
Bid Amount: $ 2,875.00
9 Floor Finishes
Carpet Trends West is the low of two bidders. They are
very familiar with the project and scope appears to
be complete. Recommend award of contract.
Bid Amount: $13,798.43
10 Paint and Wall Covering
Rocky Mountain Painters is the low of two bidders. In
reviewing the scope of work, we determined that some
work had not been included. We recommend the contract
be awarded to them with the following adjustments made
to their bid:
Original Bid: $ 872.00
Additional Paint: $ 750.00 $ 1,622.00
11 Folding Door
Won -Door Corp. was the low and only bidder. The sound
transmission class (STC) is 43. Recommend award of
contract.
Bid Amount: $ 2,611.00
12 Window Covering
Innovative Openings is the low of three bidders.
Recommend award of contract.
Bid Amount: $ 9,418.00
13 Plumbing
Low bid was a tie between Estes Park Plumbers and Peak
to Peak Plumbers. A flip of the coin, in their presence,
will have to be made.
Bid Amount: $ 1,396.00
14 HVAC
Low bidder was Mike's Heating. He is on vacation until
May 14. Our concern is whether all work was taken into
consideration on the main floor. Gibson Heating has
indicated a bid as drawn with addenda.
No recommendation at present.
(Wehr) Mikes Heating Bid Amount:
Gibson Heating Bid Amount:
$ 1,498.94
$ 3,677.00
15 Electrical
DeHaan Electric is the low of four bidders. All bidders
read and understood addenda which explained electrical
needs. Recommend award of contract.
Bid Amount: $ 3,251.00
Rep�ec fully submitted,
Hal Wheatley UConstruction Manager
Estes Park TCM, Inc.