Committee: Chairman Barker, Trustees Doylen and Gillette
Attending: Chairman Barker, Trustee Doylen
Also Attending: Town Administrator Widmer, Public Works Director Linnane,
Mgr. Sievers, Water Supt. Goehring, Clerk O'Connor
Absent: Trustee Gillette
Chairman Barker called the meeting to order at 8:00 a.m.
STANLEY AVENUE/HIGHWAY 7 INTERSECTION RECONSTRUCTION PROJECT
(JANCO) — REQUEST APPROVAL OF: (1) DESIGN SCOPE OF SERVICES AND (2)
SOLICITATION OF CONSTRUCTION COST.
(1) This is a budgeted project and Van Horn Engineering has performed all of the right-
of-way work associated with the Plat revision, and prepared a preliminary design of the
proposed new intersection design. Staff requested and received a proposal from Van
Horn ($12,845) to prepare the Construction Plan and manage the construction.
The budget contains $15,000 for design and construction management, and $125,000
for construction. A June 15, 2001 construction completion deadline has been
established, and staff is requesting (2) authorization to proceed with cost solicitation
after the design is complete; the construction costs would be presented at a future
Committee meeting, possibly in March.
Preliminary plans include three lanes on each side of the highway and a future sidewalk
connection.
The Committee recommends approval of: (1) the design scope of services in the
amount of $12,845 submitted by Van Horn Engineering, and (2) the solicitation of
construction costs.
STANLEY AVENUE PEDESTRIAN TRAIL — REQUEST APPROVAL OF: (1) DESIGN
SCOPE OF SERVICES, AND (2) SOLICITATION OF CONSTRUCTIONS COST.
(1) This budgeted project is for a concrete pedestrian trail along Stanley Ave., from
Prospect Ave. to Hwy. 7, adjacent to KRKI. Budget funding is provided in 2001 and
2002. Staff requested and received a proposal from Estes Park Surveyors ($14,600) for
design and construction management scope of services.
The budget contains $60,000 for design, construction management and construction in
2001, and $50,000 for Phase II in 2002. Staff is requesting (2) authorization to proceed
with cost solicitation after the design is complete. Staff intends to bid the entire project
this year, with confirmed with prices.
The Committee recommends approval of: (1) the design scope of services for
both years, in the amount of $14,600 submitted by Estes Park Surveyors, and (2)
the solicitation of construction costs.
BRADFORD PUBLISHING CO.
RECORD OF PROCEEDINGS
Public Works Committee — January 18, 2001 - Page 2
MUNICIPAL BUILDING BUDGETED PROJECTS — AUTHORIZATION TO PROCEED.
Several improvement projects are slated for the Municipal Building to improve occupant comfort,
safety, efficiency and expansion. The Municipal Building was remodeled from an existing high
school 27 years ago and in some areas it may be considered functionally obsolete.
1) The elevator is due for a complete overhaul and modemization to meet current safety and
ADA standards. 2) Air flow in the building is insufficient to maintain a comfortable working
environment in the summer and hiring a mechanical engineering company to evaluate the
possibilities of adding air conditioning is desired. 3) Relocate the Board Room to the Police
Garage; hire an architect for design this year, with construction to occur in 2002. 4) Public
Meeting Room 202-203 can be made more efficient by dividing it further to provide a third room,
and the project includes remodeling and modemizing the kitchen. This improvement will enhance
control of access and use. In addition it will provide an efficient manner to serve food for
functions.
The 2001 Budget contains four line items to address these improvements:
1. Elevator upgrade
2. Air Conditioning design & build
3. Remodel Design
4. Room 203 Remodel
$ 45,000
$145,000 (plus $25,000 for Police wing)
$ 35,000
$ 35,000
Staff is requesting:
1. Hire Montgomery Kone (the only authorized service company) to perform the
necessary upgrades to the elevator at a negotiated cost of $38,959 and hold
the remaining $6,041 as a contingency. Total expenditure: $45,000
2. Solicit RFP's from mechanical engineering firms that can provide A/C design
plus construction management including construction and installation
completion at the combined budgeted value of $170,000
3. Hire an architect to develop design options and drawings for the remodel at a
cost of $35,000.
4. Hire a contractor to construct the remodeling and modernization of Room 202-
203 at the budgeted amount of $35,000.
The Committee recommends approval of Items 1 through 4, with associated
budget expenditures, as presented.
CAUSEWAY UNDERPASS/TRAIL PROJECT CDOT GRANT AGREEMENT —
REQUEST APPROVAL OF INTERGOVERNMENTAL AGREEMENT (IGA).
Director Linnane briefed the Committee on this project, and reported the Town has
received two CDOT grants for this project: the 2001 grant is for $157,000 with a $250,000
Town match, and the 2002 grant is for $167,000 with a $50,000 Town match. Similar to
the other CDOT Lake Trail Grants, CDOT requires a contract with the Town that is
adopted by a Town Resolution. The contract and resolution have been reviewed and
approved by Town Attorney White. Staff clarified the grant match calculation as stated in
the Resolution, adding that the Resolution is for year 2001 only. The Committee
commended Director Linnane in obtaining significant grant funding for numerous projects.
The Committee recommends approval of the IGA and subsequent Resolution.
BRADFORD PUBLISHING CO.
RECORD OF PROCEEDINGS
Public Works Committee — January 18, 2001 - Page 3
WATER DEPT. YEAR 2000 LOOP PROJECT — REQUEST APPROVAL TO EXPAND
SCOPE OF SERVICES WITH A CHANGE ORDER.
The replacement of the Wonderview 12" water main from Virginia Ave. to MacGregor
Ave. was budgeted in 2001. Kitchen & Co. is currently completing the 2000
Wonderview 12" from James St. to Virginia Ave., and the contractor will honor the 2000
unit prices of the James St. Project to construct the 2001 Project from Virginia to
MacGregor. The total estimated cost is $58,388.
The 2001 Budgeted amount is $50,000. Although the cost is $8,388 more than the
budgeted amount, the unit prices are year 2000 unit prices. The over -budget amount
can be funded from the 2001 Engineering Services under -budget.
RMC Representative Prochaska reported that due to the holiday season, the project
has been somewhat delayed, however, RMC has not received any complaints from
area residents.
The Committee recommends approval of the expanded scope in the amount of
$58,388, as presented.
WATER DEPT. YEAR 2001 LOOP PROJECT — REQUEST APPROVAL OF DESIGN
SCOPE OF SERVICES.
The following construction projects and design/construction management services have
been budgeted in 2001:
1. Fall River/Summerset 12"
2. Wonderview 12"; Virginia to MacGregor (construction management only)
3. Beaver Point 8"
4. Stanley Circle 6"
5. Devil's Gulch 12"
6. Mary's Lake Raw Water Pump
7. Annual Fire Hydrant Project
Director Linnane specifically reviewed the Water Line Priority List, confirming that by
taking an aggressive approach on this Project, the Water Department is approximately 5
years ahead of schedule.
RMC has submitted a Scope of Services in the amount of $113,930 for easement
preparation, design and construction management. This proposal represents 12% of
the construction budget, well within acceptable engineering standards.
The Budget includes $145,000 for design and construction management, and $985,000
for construction. The Committee recommends approval of the Scope of Services in
the amount of $113,930 submitted by RMC.
There being no further business, Chairman Barker adjourned the meeting at 8:39 a.m.