Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 2005-04-21RECORD OF PROCEEDINGS Town of Estes Park, Larimer County, Colorado, April 21, 2005 Minutes of a Regular meeting of the PUBLIC WORKS COMMITTEE of the Town of Estes Park, Larimer County, Colorado. Meeting held in the Municipal Building in said Town of Estes Park on the 21 st day of April, 2005. Committee: Chairman Levine, Trustees Jeffrey -Clark and Homeier Attending: All Also Attending: Town Administrator Repola, Utilities Superintendent Goehring, Construction and Public Facilities Manager Sievers, Office Manager Button, and Deputy Clerk Williamson Absent: None Chairman Levine called the meeting to order at 8:00 a.m. and welcomed Trustee Homeier. NORTH LAKE DRIVE AVENUE — REQUEST APPROVAL TO SOLICIT BIDS. Drainage damage occurred to the roadway shoulder and adjacent properties on each side of the Dry Gulch Road near Sombrero Stables during the summer of 2004. The preliminary drainage design began in December 2004 and the final design plan was submitted to the Public Works Department in April 2005; therefore, this item was not budgeted in the 2005/2006 budget. Staff recommends delaying the Twisted Pine Drainage Project budgeted in the Community Reinvestment Fund for 2005 ($20,000), making funds available for the North Lake Drainage Project (Preliminary Cost Est. $10,000), which is a higher priority. The Twisted Pine drainage can be managed this year through maintenance to prevent the culvert from becoming blocked. The Committee recommends Staff be authorized to solicit bids for the North Lake Avenue Drainage Project, returning to the Committee for final approval. EAST RIVERSIDE CULVERT REPAIR — REQUEST APPROVAL. In 2003, Staff became aware that the existing culvert under East Riverside Drive was old and in poor condition. The cost to dig up, replace, and asphalt patch the 290' of corrugated steel pipe is estimated at $50,000. Insituform Technologies is a worldwide pipeline rehabilitation company specializing in injection fiberglass tubing for underground facilities. Staff recommends the purchase of the custom fabricated pipe relining product from Insituform Technologies, Inc. at a cost of $26,680 with an additional $8,320 as a contingency for any unforeseen difficulties for a total of $35,000. Work would be completed this spring in 2 working days, unless high runoff impedes the schedule. The Committee recommends: (1) approval to purchase the fiberglass pipe lining for the East Riverside Culvert from Insituform Technologies at a cost up to $35,000, and (2) a news release to demonstrate how the Town is leveraging technology to limit disruption to the public. AMENDED ANNUAL TREE REPLACEMENT PROJECT (RIVERSIDE PLAZA) — REQUEST APPROVAL. The Public Works Committee approved the solicitation of bids for the Annual Tree Replacement Project scheduled this year in Confluence Park. One bid was received RECORD OF PROCEEDINGS Public Works Committee — April 21, 2005 — Page 2 from Estes Valley Home & Garden Center Inc. for $19,095. The proposed scope of work from Estes Valley Home & Garden Center Inc. is substantially different from the scope of work originally anticipated during the budget process. Due to the size of the current cotton wood trees, all pavers would be removed from the area to allow complete eradication of the root system. The contractor is confident, weather permitting, that the project could be completed within a week. Staff recommends the project take place after the Duck Race and before Memorial Day. The 2005 and 2006 budgets each include $10,000 for this project, arid Staff is recommending that half of the project be completed in 2005, with the remaining half in 2006. The project would start with Phase II which contains the most severe damage. The Committee recommends awarding the first half of the Confluence Park Tree Replacement project to Estes Valley Home and Garden Center, Inc. at a cost of up to $10,000. REPORTS. • Fish Creek Trail - 5 bids have been received for the trail construction. Northstar Concrete, Inc. submitted the low bid of $594,206.30. Construction will begin within the next 30 days with completion by the end of July. • CDOT has tabled the repaving of Hwy. 34 from Elkhorn Ave. to Rky. Mtn. Park Entrance due to a lack of funding. Hwy. 36 from Lyons to Estes Park will begin after Memorial Day. The road will remain open with some delays. CDOT will provide a press release. • Street Sign Replacement Project — Bid packets have been sent to local companies as well as major sign companies with bids due back by May 6th Chairman Levine stated that the next Public Works Committee meeting will be held on the second Thursday, May 12th There being no further business, Chairman Levine adjourned the meeting at 8:35 a.m. o..c i , , l ��, a 01 am.,,g.00.-. a ie Williamson, Deputy Town Clerk APPROVED APR 2 6 2005 TOWN OF ESTES PARK BOARD OF TRUSTEES