HomeMy WebLinkAboutMINUTES Public Works Committee 2006-06-08RECORD OF PROCEEDINGS
Town of Estes Park, Larimer County, Colorado, June 8, 2006
Minutes of a Regular meeting of the PUBLIC WORKS COMMITTEE of
the Town of Estes Park, Larimer County, Colorado. Meeting held at
Town Hall in said Town of Estes Park on the 8th day of June, 2006.
Committee: Chairman Levine, Trustees Blackhurst and Homeier
Attending: All
Also Attending: Town Administrator Repola, Construction and Public
Facilities Manager Sievers, Public Works Superintendent
Mahany, Deputy Clerk Schares
Absent: None
Chairman Levine called the meeting to order at 8:00 a.m.
PUBLIC COMMENT
None.
2006 STREET IMPROVEMENT PROGRAM — REQUEST APPROVAL. Mgr. Sievers
explained the 2006 Street Improvement Program is divided into three parts; chip seal,
overlay, and striping. Staff recommends purchasing the chip seal from A-1 Company in
the amount of $35,000 with the work being completed in July. Chip seal may be
completed on portions of Brook Dr., Lake Shore Dr., Country Club Dr., East St., Fall
River Dr., Fifth St., Steamer Pkwy, Fish Hatchery Rd., Birch Ave., Riverside Dr., High
Dr., North Lake Ave., Old Ranger Dr., Stanley Cir., Stanley Ct., David Dr., Boyd Ln., Ute
Ct., Weston Ln., and Driftwood Ave. The overlay will be bid in June with $135,000
budgeted for 2006.. Staff will return in July for approval of the bids. The striping will be
purchased and installed in October with a budgeted amount of $5,000. The budget also
includes $15,000 to expand the paved portion of the Park Shop parking lot, which was
completed during the CVB paving project.
Staff recommends proceeding with the 2006 Street Improvement Project expenditures,
bidding, and schedules. Following discussion, the Committee recommends approval
of the 2006 Street Improvement Program for an amount not to exceed $190,000 as
budgeted in account # 101-3100-431.35-60.
VISITORS CENTER DETENTION POND — REQUEST APPROVAL. Mgr. Sievers
stated the Estes Valley Development Code (EVDC) requires all development to include
landscaping and drainage control. The Visitors Center storm drainage retention pond
requires final shaping, containment, and retaining walls. The Community Reinvestment
Fund budget includes $50,000 for irrigation and landscaping. Staff advertised in the
local paper and received one bid from A-1 Excavating of Estes Park at a cost of $8,622
to install a rock retaining wall and a wood rail safety fence around the pond area. Staff
recommends approval of the bid from A-1 Excavating of Estes Park in the amount of
$8,622 with an additional $378 for any possible earthwork changes. Following
discussion, the Committee recommends approval of the bid from A-1 Excavating for
the amount of $9000 (Account # 204-5400-544.32-22).
TOWN HALL MAINTENANCE UPGRADES — REQUEST APPROVAL. Town
Administrator Repola reported $10,000 was originally budgeted to reconstruct the
exterior staircase behind Town Hall. It has been determined that the budgeted amount
is insufficient. Staff reported that they would be contacting an architect to get drawings
and a revised estimate. Staff will return to committee in July with the cost estimate and
proposed next steps.
RECORD OF PROCEEDINGS
Public Works Committee — June 8, 2006 — Page 2
CVB SOD — REQUEST APPROVAL. Supt. Mahany explained the Visitors Center
needs approximately 7500 sq. ft. of sod around the building. Staff has received the
following bids for sod:
• Greenlawn Sod Co (Ft. Collins)
Sportstuff $.325 / sq ft x 7500 sq ft = $2,438.00 (est)
Bluegrass $.308 / sq ft x 7500 sq ft = $2,310.00 (est)
• Rocky Mtn Sod (Ft. Collins)
Sportstuff $.343 / sq ft x 7500 sq ft = $2,573.00 (est)
Bluegrass $.318 / sq ft x 7500 sq ft = $2,385.00 (est)
Summary - $2,000.00 - Soil (delivered with Bond Park soil)
$2,438.00 - Sportstuff sod — delivered and installed (est)
$4,438.00 = Total sod and soil (est)
Staff recommends purchasing Sportstuff Sod from Greenlawn Sod Co. for a cost of
$2,438 with an additional cost of $2,000 for soil, which was delivered during the Bond
Park project. Following discussion, the Committee recommends approval to proceed
with the purchase of the sod from Greenlawn Sod Co. for the amount of $2,438 and
the soil in the amount of $2,000 (Account #204-5400-544.32-22).
Trustee Blackhurst questioned the condition of the sod at Bond Park and the excess
sod that could not be saved from Bond Park. Supt. Mahany stated some of the sod will
require re -seeding, but most of the sod has recovered. The excess sod was a mistake
on the part of the sod company and was not salvageable. The Town of Estes Park was
not charged for the unused sod.
PLAYGROUND EQUIPMENT REQUEST APPROVAL. Supt. Mahany explained
during the 2005 CIRSA property inspection, the playground equipment at Children's and
Riverside Parks were found to be non -compliant with industry safety standards. CIRSA
recommended the playground equipment be removed due to liability issues. Staff has
removed the equipment and recommends using the $35,000 savings from the purchase
of the Street Department snowplow truck purchased in May 2006 to replace the
playground equipment (which will be charged to the Parks Department budget within the
General Fund). Following discussion, the Committee recommends approval to
proceed with obtaining bids and purchase the playground equipment. Playground
equipment safety inspection training for Parks Dept staff has been arranged for later this
summer.
REMODEL WEST VESTIBULE — RE UEST APPROVAL. Mgr. Sievers reported the
site assessment and report conducted by Thorp - Associates in 2001 showed the Town
Hall interior space could be used more efficiently. One suggestion given was to delete
the south and the west public access points. The south vestibule has been remodeled into
an office for IT. Staff recommends converting the west vestibule into an office. Following
discussion, the Committee recommends leaving the entrance until staff can identify
a specific use for the space.
REPORTS.
1. CDOT HWY 34 REPAIR — Hwy 34 repair is currently running ahead of
schedule.
2. CDOT HWY 34 CHIPSEAL — CDOT will begin a Chip Seal project on Hwy 34
in July from Drake to Estes Park.
3. FISH CREEK TRAIL UPDATE —The trail project is currently out to bid.
4. CVB SITE WORK — LANDSCAPING - Irrigation will be completed in the next
two weeks and sod will be laid.
5. BOND PARK UPDATE - The information building will be delivered and will
open tomorrow. The building will not have electricity this year.
RECORD OF PROCEEDINGS
Public Works Committee — June 8, 2006 — Page 3
Miscellaneous.
None.
There being no further business, Chairman Levine adjourned the meeting at 9:33 a.m.
'-f r. PI
Suzy 'hares, Deputy Town Clerk
APPROVED
J U N 1 3 2006
TOWN OF ESTES PARK
BOARD OF TRUSTEES