Loading...
HomeMy WebLinkAboutMINUTES Public Works Committee 2010-01-28RECORD OF PROCEEDINGS Town of Estes Park, Larimer County, Colorado, January 28, 2010 Minutes of a Regular meeting of the PUBLIC WORKS COMMITTEE of the Town of Estes Park, Larimer County, Colorado. Meeting held at Town Hall in said Town of Estes Park on the 28t' day of January 2010. Committee: Attending: Also Attending: Chairman Blackhurst, Mayor Pro Tem Levine and Trustee Miller Chairman Blackhurst, Mayor Pro Tem Levine and Trustee Miller Town Administrator Halburnt, Deputy Town Administrator Richardson, Public Works Director Zurn, Project Mgr. Sievers, and Deputy Town Clerk Deats Absent: None Chairman Blackhurst called the meeting to order at 8:00 a.m. PUBLIC COMMENT. None PROSPECT AVENUE RECONSTRUCTION — PERMANENT AND TEMPORARY EASEMENTS. As improvements to Prospect Avenue move forward, temporary and permanent easements are required from residents affected by the reconstruction. Cornerstone Engineering and staff have designed and drafted the following easements: 1. Permanent Easement, Access, Utility, and Drainage Access Easement for Construction and Maintenance — dedicated to the Town of Estes Park by 401 Elm LLC, 401 Elm Avenue. 2. Permanent Easement, Access, Utility, and Drainage Access Easement for Construction and Maintenance — dedicated to the Town of Estes Park by 411 Elm LLC, 411 Elm Avenue. 3. Permanent Easement, Access, Utility and Drainage Access Easement for Construction and Maintenance — dedicated to the Town of Estes Park by 408 Fir LLC, 408 Fir Avenue. 4. Permanent Easement, Construction and Maintenance of Underground Electric, Telephone, Fiber Optics and Cable — dedicated to the Town of Estes Park by Elley Family Partners, LLC, 880 Comanche Street. 5. Temporary Easement, Construction easement — dedicated to the Town of Estes Park by 401 Elm LLC, 401 Elm Avenue. 6. Temporary Easement, Construction easement dedicated to the Town of Estes Park by 411 Elm LLC, 411 Elm Avenue. 7. Temporary Easement, Construction easement — dedicated to the Town of Estes Park by 408 Fir LLC, 408 Fir Avenue. 8. Temporary Easement, Undergrounding of overhead utilities — dedicated to the Town of Estes Park by Elley Family Partners, LLC, 830 Comanche Street. 9. Temporary Easement, Undergrounding of overhead utilities — dedicated to the Town of Estes Park by Elley Family Partners, LLC, 880 Comanche Street. The Prospect Avenue reconstruction project, which will make safety improvements to the roadway, is going out to bid next week. Dir. Zurn stated that these are the final easements required for the project and commended the property owners for their cooperation. The Committee recommends approval of the permanent and temporary easements as outlined above. Dir. Zurn also stated that a septic tank that is in violation of health department regulations was discovered on property owned by the hospital, and that he will be contacting the hospital to discuss the matter. RECORD OF PROCEEDINGS Public Works Committee — January 28, 2010 — Page 2 REPORTS. Reports provided for informational purposes and made a part of the proceedings. • Drainage Master Plan: The Town's first storm drain study encompassed approximately 11% of its area and was completed in 1985, resulting in two large capital projects in the northeast quadrant in 1986-87. A second study, a Master Drainage Plan was completed in 2009, by RG Consulting Engineers of Denver, for Prospect Mountain Southeast and the Elm Road Industrial Area. These areas were studied due to frequent flooding, private property damage, and storm water quality concerns. The study identified the original, historical drainage which has changed due to development, identified problem areas, and water quality issues. The study makes recommendations to solve these issues and includes approximate costs associated with the solutions which are $8,314,966 for proposed improvements within the Prospect Mountain southeast area quadrant and $1,529,893 within the Elm Road industrial area. Dir. Zurn stated this is a planning document and a tool to be utilized for funding considerations. • Colorado Department of Transportation (CDOT) Signal Conduit and Controller Upgrade: In Spring 2010, CDOT is planning to upgrade the intersection of Moraine Avenue and Elkhorn Avenue. Pedestrian movement will be modified so that pedestrians cross with the traffic flow, video detection cameras will be installed, an interconnected coordination system will be utilized to allow CDOT to more accurately control the phases from Greeley, and new signal coordination will be implemented. CDOT has budgeted $250,000 for this project, with no cost to the Town. • Prospect Avenue Bypass Reconstruction: This project is a priority on the Capital Improvement Plan with three years of funding having been combined to improve the alignment and function of the Stanley Avenue/Prospect Avenue intersection, replace and improve the storm drain system, add a 6 ft. pedestrian sidewalk to the south side of the roadway, provide intersection improvements to five adjacent streets, and reduce on -street parking along Fir Avenue. The project will go out to bid on February 1, 2010, with a bid opening planned for February 18, 2010. Bid approval will be taken as an action item to the February 23, 2010, Town Board meeting. Construction is scheduled for March 15, 2010 through May 27, 2010. In preparation for construction, underground conduit is being installed along the length of the project and is approximately 30% complete. TOUR OF THE PROSPECT AVENUE RECONSTRUCTION PROJECT. A tour of the site of the Prospect Avenue Reconstruction project was scheduled immediately after the adjournment of the regular meeting. There being no further business, Chairman Blackhurst adjourned the meeting at 9:17 a.m. Cynthiti Deats, Deputy Town Clerk APPROVED FEB - 9 2010 TOWN OF ESTES PARK BOARD OF TRUSTEES