Loading...
HomeMy WebLinkAboutMINUTES Building Code Committee 1964-04-29aD RECORD CF PROCEEDINGS Building Code Committee April 29,1964 Committee:Chairman C.M.Hunter;Trustees Harry Tregent and Henry Dannels. Attending:Chairman C.M.Hunter;Trustees Harry Tregent and Henry Dannels. Also Attending:Building Inspector Ted Hackett and Town Clerk Dale Hill. Mr.M.R.Thompson appeared before the Committee to express his opinion that the current illuminated sign permit fee was completely inequitable. He suggested the Committee consider changing the above-mentioned fee. Building Inspector Hackett presented the following fee schedules on the following cities: Fort Collins:Fees charged as per valuation of sign using the uniform Building Code Valuation Schedule of fees per thousand plus an additional charge for electrical signs of $3.00 for the first ballast and $1.00 for each ballast thereafter. Boulder:A flat fee of $3.00 per sign,plus $1.00 for each transformer on electrical signs. Creeley:Fee of $1.00 for the first 25 square feet or fraction thereof,and an additional $.50 for each additional 25 square feet or fraction thereof.No differential charge is made for electrical equipment. After considerable discussion,the Committee decided to recommend the Board of Trustees adopt the following schedule for all sign permits: Up to and including $700.00.$5.00 More than $700.00,to and including $1,000.00 6.00 Each additional $1,000.00 or fraction,to and including $25,000.00 3.00. Each additional $1,000.00 or fraction,to and including $50,000.00 2.50 Each additional $1,000.00 or fraction,to and including $100,000.00 1.50 Each additional $1,000.00 or fraction,more than $100,000.00 1.00 The above schedule is the same schedule now used by the Town of Estes Park for building permits with the exception of the $5.00 minimum. The Committee instructed Building Inspector Hackett to review the entire sign ordinance and recommend further changes if necessary. Meeting adjourned. Dale C.Hill,Town Clerk