HomeMy WebLinkAboutMINUTES Public Works Committee 1970-05-054fl RECORD OF PROCEEDINGS Public Works Committee May 5,1970 Committee:Chairman Steele;Trustees Tregent and Prosser Attending:Chairman Steele;Trustees Tregent and Prosser Also Attending:Town Administrator Hill,Street Superintendent McCracken,Light and Power Superintendent Sweetland, Building Inspector Mowery and Town Engineer Van Horn. RIVERFRONT: The Building Inspector presented a bid proposal from Mr.Jenista and Mr.Montz.This proposal covered a portion of the work scheduled to be completed.After reviewing this proposal plus the additional work to be completed by the Town,the Committee decided to recommend a de lay in the project until the fall of 1970.This is a matching Federal Aid project with a completion date of October 31,1971. RIVERSIDE PARKING LOT SIGN: The Building Inspector presented sign estimates from Spur Signs & Woodwork as follows: 1.Elkhorn Avenue walkway sign 39”x 72”routed wood same as signs on parking lot No.1 -$310.00 installed. 2.Two signs in the rking lot 39”x 72”with posts same as the signs on parking lot No.1 -$540.00 installed. The Committee decided to table any action on new signs for this parking lot until 1971. The present illuminated sign will be removed. ELTON JOHNSON SIDEWALK: The Building Inspector submitted the following quotations for the Elton Johnson sidewalk: 1.Pinson -$1,545.00 for concrete and labor,new sidewalk.Price does not include removal of old concrete. 2.H &H Concrete -$663.00 labor only for new sidewalk.Price does not include new concrete or removal of old concrete. The Committee recommends the Town Administrator be authorized to award this job when firm bids are received on the total job. ROOF BID ON MUNICIPAL COURT BUILDINGS: The Building Inspector presented the following roof bids on the Munici pal Court buildings: 1.Anderson -$1,452.00 2.Garcia -$1,890.00 The Committee recommends the low bid by Anderson Roofing be accepted. RECORD OF PROCEEDINGS Page two Public Works Committee May 5,1970 NEW BRIDGE ON EAST RIVERSIDE: Town Engineer Van Horn reported on progress to date on the proposed new bridge on East Riverside Drive.The Larimer County bridge crew will place the abutments for both the vehicle and pedestrian bridges.The design will be done by Town Engineer Van Horn.This portion of the bridge construction will be completed this fall.The pre-stressed con crete slabs will be scheduled for the spring of 1971.Cost estimates to date are as follows: Concrete -75 yards @ $20.00 $1,500.00 Steel 500.00 Excavating 200.00 Engineering 1,100.00 $3,300.00 STREET IMPROVEMENTS -1970: ____ LENGTH ____ 1.1,100’$3,226.00 2.300’880.00 3.500’611.00 4.500’1,466.00 5.950’2,322.00 6.1,400’4,106.00 7.2,000’4,888.00 8.1,500’3,666.00 9.300’733.00 10.2,525’6,171.00 11.2,500’5,500.00 12.1,450’3,544.00 13.1,800’4,399.00 16,825’$41,512.00 The Larimer County Road Department has agreed to resurface Community Drive and Brook Drive.They have also agreed to a temporary oil treat ment for the Riverside Parking Lot. There being no further business the meeting adjourned. fAPPRöVE7 MAY 111970 ,TUvth Ur bJS F L BOARD OF TRTEE3 -_t%n,_._( _-) street oiling program is COST After considerable discussion the following recommended with the priority assigned: NAME Big Horn Drive(overlay) Big Horn Drive (patch) Virginia Drive (patch) Miscellaneous repair Otis &Panorama Lexington Chap in Wi 1 low Boyd Grand Estates Ponderosa Tranquil Morgan strator