Loading...
HomeMy WebLinkAboutMINUTES Street Committee 1969-12-04o RECORD OF PROCEEDINGS Street Committee December 4,1969 Committee:Chairman Steele;Trustees Erickson and Tregent Attending:Chairman Steele;Trustees Erickson and Tregent Also Attending:Town Administrator Hill,Superintendent McCracken, Building Inspector Mowery,Town Engineer Van Horn SIDEWALK REPAIR: Building Inspector Mowery reported all sidewalk repairs ordered by the Board of Trustees have been arranged for or completed except No.10, Elton Johnson,W 5’of Lot 18 and all of Lots 19 to 23 inc.,Blk.3, 155-161 W.Elkhorn Avenue. The Committee instructed Mr.Mowery to obtain at least two (2)bids on the above mentioned sidewalk to be opened at the December 8th meeting of the Board of Trustees. The prescribed legal method of collection will be followed. PARKING LOT NO.7: After considerable discussion about the development of the parking lot and the sale and removal of the present buildings,the Committee re commends the following: 1.Town Engineer Van Horn’s cost estimates,dated November 17,1969, be accepted and approved.A copy is attached to these proceedings. 2.Lay sewer and water lines for the proposed public rest rooms prior to the fill for the parking lot. 3.The Town Engineer will survey the street right-of-way for East Riverside Drive during the survey of Parking Lot No.7. 4.Review the plan with the Beautification Committee prior to final adoption. 5.A sub-committee consisting of Street Chairman Steele,Town Ad ministrator Hill,Street Superintendent McCracken,Building In spector Mowery and Town Engineer Van Horn will review the bid documents on the removal of the present buildings prior to publication of invitation to bid. 6.Fill material from Virginia Drive near the Marshall property will be used in this lot. ALLEY NORTH OF PARK lANE: Street Superintendent McCracken reported the First National Bank will finish the work needed to properly repair and drain this alley as soon as the telephone company removes the pole now located in the center of the proposed sidewalk. RECORD OF PROCEEDINGS Street Committee (continued) December 4,1969 EU(HOPN AVENUE BRIDGE -SIDEWALK: The Conunittee recommends the property owners be required to finance the construction of a sidewalk on the north side of and parallel to the Elkhorn Avenue bridge should the Board of Trustees decide this sidewalk is necessary for pedestrian traffic. There being no further business,the meeting adjourned. // Dale G.Hill,Town Administrator ‘S Th ‘7 z’ DEC 1989 )Gi ‘S__n r%. BOX N’DNE 586-3484 FTI.1LTE of DESIGN and LAYOUT of DAFK IIOfSE PLFKING LOT :C VAN HORN,P:f. flad dl.Vaz dlo State Licenied Profeisional Engineer and Land Surveyor ESTES PARK,COLORADO November 17,1969 I.GFNEPJI LAYOUT: Parking pattern,traffic flow,drafting ————3OO.OO II.CROSS SECTIONS: Vertic1 layout,cuantity estimations —————————250.00 III.DESIGNof BRIDGE ——————————150.00 IV.PRPARATION OF BID DOCtR1RNT$AND SPECIFICATIONS ———200.00 V.CONSTRUCTION JPERVISION ———————————————————200.00 V PAUL H. I 1