HomeMy WebLinkAboutMINUTES Street Committee 1969-05-05Street Committee
May 5,1969
RECORD OF PROCEEDINGS
00
Commit tee:
Attending:
Also Attending:
Chairman Swanson;Trustees Erickson and Tregent
Chairman Swanson;Trustee Tregent
Town Administrator Hill,Street Superintendent
McCracken and Town Engineer Van Horn
Absent:Trustee Erickson
The Committee discussed at length and recommends to the Board of Trustees
that the attached Street Improvement Plan be authorized for this year.
This plan will be reviewed again early this fall and necessary changes
recommended at this time.
The Committee discussed the stOrm drainage problem on East Riverside
Drive.Town Engineer Van Horn informed the Committee he has written
the Cointy Engineer suggesting ways of controlling the storm drainage
coming from the Aerial Tramway.The Town Engineer will present a plan
and cost estimate for the storm drainage controll on East Riverside
Drive at the next Committee meeting.The Committee also discussed widen
ing East Riverside Drive to its limit.
The Committee decided to consider the request from the Museum group for
the oiling of the Museum parking lot during the 1970 budget hearings.
The Committee instructed the Town Engineer to check with the Building
Inspector as to the plans of the First National Bank curb cuts on Mc
Gregor Avenue.It was the opinion of the Committee that the curb,
gutter,sidewalk and drain should be installed at this time.
There being no further business,the meeting adjourned.
APPROVFD
MAY 12 1969
TOWN Uf ESIES PRi(
1,%B0AR1_OF 1iUSTEES
-
.-__nv S’e.r—’%.
G.Hill,Town nistrator
M —..l969
As adopted for 1969:
TOWN OF ESTE S PARK
STREET DEPARTMENT
REVISED STREET
IMPROVEMENTS
1969
1.Improvements
2.Equipment
3.Parking lot purchase
4.Parking lot improvements
PROPOSED:
1.Improvements
a.Stanley Circle
b.Big Horn Lane
c.Cedar Lane
d.Miscellaneous
e.Lake front
2.Equipment
a.Cat loader
b.Street sweeper
c.2 ton dump
d.ton
$42,000.00
10,500.00
28,000.00
10,500.00
$91,000.00
$7,280.00
10,080.00
4,363.00
1,400.00
1,092.00
$24,215.00
$9,000.00
2,650.00
3,950.00
1,600.00
$17,200.00
3.Parking lot improvements
a.Surface No.1
b.Mark No.1
4.Parking lot purchase
$11,000.00
200.00
$11,200.00
$28,000.00
Recap:
As ‘69 budget
Proposed
TOTAL $80,615.00
$91,000.00
80,615.00
$10,385.00BALANCE