Loading...
HomeMy WebLinkAboutMINUTES Street Committee 1969-05-05Street Committee May 5,1969 RECORD OF PROCEEDINGS 00 Commit tee: Attending: Also Attending: Chairman Swanson;Trustees Erickson and Tregent Chairman Swanson;Trustee Tregent Town Administrator Hill,Street Superintendent McCracken and Town Engineer Van Horn Absent:Trustee Erickson The Committee discussed at length and recommends to the Board of Trustees that the attached Street Improvement Plan be authorized for this year. This plan will be reviewed again early this fall and necessary changes recommended at this time. The Committee discussed the stOrm drainage problem on East Riverside Drive.Town Engineer Van Horn informed the Committee he has written the Cointy Engineer suggesting ways of controlling the storm drainage coming from the Aerial Tramway.The Town Engineer will present a plan and cost estimate for the storm drainage controll on East Riverside Drive at the next Committee meeting.The Committee also discussed widen ing East Riverside Drive to its limit. The Committee decided to consider the request from the Museum group for the oiling of the Museum parking lot during the 1970 budget hearings. The Committee instructed the Town Engineer to check with the Building Inspector as to the plans of the First National Bank curb cuts on Mc Gregor Avenue.It was the opinion of the Committee that the curb, gutter,sidewalk and drain should be installed at this time. There being no further business,the meeting adjourned. APPROVFD MAY 12 1969 TOWN Uf ESIES PRi( 1,%B0AR1_OF 1iUSTEES - .-__nv S’e.r—’%. G.Hill,Town nistrator M —..l969 As adopted for 1969: TOWN OF ESTE S PARK STREET DEPARTMENT REVISED STREET IMPROVEMENTS 1969 1.Improvements 2.Equipment 3.Parking lot purchase 4.Parking lot improvements PROPOSED: 1.Improvements a.Stanley Circle b.Big Horn Lane c.Cedar Lane d.Miscellaneous e.Lake front 2.Equipment a.Cat loader b.Street sweeper c.2 ton dump d.ton $42,000.00 10,500.00 28,000.00 10,500.00 $91,000.00 $7,280.00 10,080.00 4,363.00 1,400.00 1,092.00 $24,215.00 $9,000.00 2,650.00 3,950.00 1,600.00 $17,200.00 3.Parking lot improvements a.Surface No.1 b.Mark No.1 4.Parking lot purchase $11,000.00 200.00 $11,200.00 $28,000.00 Recap: As ‘69 budget Proposed TOTAL $80,615.00 $91,000.00 80,615.00 $10,385.00BALANCE