Loading...
HomeMy WebLinkAboutMINUTES Street Committee 1964-04-21cc RECORD OF PROCEEDINGS Street Committee April 21,1964 Committee:Chairman Harry Tregent,Trustees Dannels and Swanson Attending:Chairman Harry Tregent,Trustees Dannels and Swanson Also Attending:Superintendent V.L.McCracken and Town Clerk Dale Hill The Street Committee discussed the following projects and recommend to the Board of Trustees these projects be approved for bid: 1.Stanley Avenue-2”mat 24 feet wide. 2.Lexington Lane from Highway 7 to the first junction-- 2”mat 24 feet wide. 3.Big Horn Drive from Devils Gulch Avenue to Wonderview Avenue--seal and chip. 4.Chapin Lane from Big Horn Drive south to the inter section of Chapin Lane and Chiquita Lane then south on Chiquita Lane to Wonderview Avenue--Peneprime. 5.Morgan Street from Highway 7 to the first junction- Peneprime. 6.Hillside Lane south--coat of Peneprime. Superintendent McCracken was instructed to submit to the Street Committee an estimate of costs on a sidewalk--East Riverside Drive from the bridge near the Band Box Cleaners to the Post Office bridge. The Street Committee discussed Chapter 15.12-1 Notice to Repair--Collection of Costs--of the Town Municipal Code.The Committee recommends to the Board of Trustees this chapter be enforced and the adjacent property be required to pay the costs of sidewalk,curb,and gutter repair or construction. The Street Committee recommends the Town proceed with the above policy and notify the owners of the Boyd property on Elkhorn Avenue the curb is a hazard to the safety of the community and must be repaired as prescribed in Chapter 15.12-1 of the Municipal Code. The Street Committee discussed the condition of the Black Canyon stream bed north of the football field.Chairman Tregent has notified Mr.Finlay, President of the School Board,the stream bed should be cleaned before the spring run-off. Meeting adjourned. Town Clerk Dale G.Hill C 0 April 28,1964 Location Stanley Ave. Lexington Lane Big Horn Lane Chapin Chiquita Morgan Street Hillside Lane E.Riverside Total Cost $8,200.00 1,830.00 1,980.00 620.00 108.50 201.50 $12,940.00 1,000.00 $13,940.00 COST ESTIMATES ON STREET PROJECTS Material Length Cost Per Foot 2”mat 2465’$3.33 2”mat 550’3.33 Seal &Chip 3300’.60 Peneprime 2000’.31 Peneprime 350’.31 Peneprime 650’.31 Sidewalk 547’ Ceiaent