PUBLIC WORKS BUILDING PROPOSALS:
Two proposals were submitted for the new Public Works Service
Center.Attached is a list of included options and advantages and
disadvantages of both proposals.Due to greater advantages and
and lower cost,the Committee recommends the acceptance of the
Burton Builders bid at a cost of $129,186.Acceptance of this bid
rather than the Reid-Burton Construction bid will also allow the
Town to equip the facility and still remain within the budgeted
amount of $175,000.Confirmation of the bid will be discussed at
the September 26 special meeting of the Board of Trustees in order
to allow construction to commence as soon as possible.
PERFORMANCE BOND -INFORMATION CENTER:
The Committee discussed the problem one local contractor was having
in obtaining a performance bond for the Information Center.It was
decided that the reasons for requiring a performance bond were valid
and,therefore,a bond should be required of all contractors who
plan to submit a bid on the Information Center.Discussion of the
Town’s efforts to aid local contractors in submitting bids followed.
To date,no local bids have been received while a number of bids
from out of Town contractors has been received.
AUTHORIZATION FORM FOR MEETING ROOM USE:
Due to damages incurred in one of the Municipal Building’s meeting
rooms,the staff has proposed a new meeting room use system and
form.The new form records pertinent data about persons requesting
use of a room,and most important,the form assigns damage respon
sibility to a specific group member.Use of the form will involve
the issuance of a key,which will only open one of the outside doors,
by the Police Department to one group member.The key must be signed
in and signed out by the group,and while the one door is unlocked,
a group member must be present at the entrance.The Committee
recommends the adoption of the new form and room use system as well
as the making of new keys designed to fit only certain doors.The
new form is attached to these minutes.
USE OF MUNICIPAL BUILDING ROOMS:
The Committee discussed both the frequency of use and the amount
of use of the Municipal Building facilities by organizations.Due
to some damages and cleaning difficulties,the possibility of re
viewing room usages more closely was also discussed.No action
was recommended at this time.In order to allow better maintenance
and upkeep of the Municipal Building,the Committee recommends that
the building be closed periodically to organizations on weekends.
RECORD OF PROCEEDINGS
Public Works Committee
September 25,1975
Page Two (2)
RANGE REALTY REQUEST:
Attached to these minutes is a letter from Range Realty received
September 24,1975.The letter is a request to use three parking
spaces in the municipal lot adjacent to their building for the
purpose of storing construction materials to be used in the new
Range Realty Building.The Committee recommends approval of the
request.
REPORTS:
Public Works Director Bill Van Horn reported to the Committee that
in order to make the sides of Morgan Street parallel,a portion
of Town property will have to be vacated and a portion of Tom
Killinen’s land deeded to the Town.All costs of the project will
be to the owner of the property,Tom Killinen.The Committee in
structed the staff to draw the proper ordinance for submission to
the Town Board.Upon the approval of the ordinance,the land
owned by Mr.Killinen will be deeded to the Town.
Town Administrator Dale Hill reported to the Committee that on
the advice of the Town Attorney,the Steiner matter regarding
sidewalk obstructions will be settled in District Court.By going
directly to District Court,the Town will save time and expense
of lower court appearances and appeals.
Public Works Director Van Horn reported to the Committee on the
street numbering project.Some problems have been encountered
with street names and poorly numbered areas.The staff will have
recommendations on these problems for the next Committee meeting.
The end product of the street numbering project will be an official
map with numbers assigned by the Town rather than the Telephone
Company.
There being no further business,the meeting adjourned.
7d(I-’4 C.I
Robert C.Middaugh,Administrative
Assistant
IAPPr?0vE151
SEP 26 1975
u
8OD OF TRUSTEES
9-25-Q
PUBLIC WORKS SERVICE CENTER
PROPOSAL COMPARISON
Both proposals provide for complete construction of 9,200 square
foot building on a site prepared by the Town in a time of not to exceed
180 days.
INCLUDED ARE:
20 year roof warranty
roof insulation to U.factor 0.1
infa red radiant heating
floor finishes
interior office finishing
electric door operators
all inte±ior plumbing
all interior wiring and lighting
automotive exhaust venting
thermo —pane glass
METAL BUILDING ON 4 FT.CONCRETE ABUSE WALL —-BURTON BUILDERS
COST:$129.186.O0
A]JVANTACES:
a.Price.
b.No exterior maintenance
c.Walls will be insulated to U factor of 0.1
d.Speed of erection.
DISADVANTAGES:
a.Costof insurance —approximately $400/year or $12,000
for 30 years.
h.Metal shell can be dented or torn.
MASONRY BUILDING w/o STONE FACIA WITH CONCRETE ROOF —REID-BURTON CONST.
COST:$172,741 without sealing and painting
$174,230 with painting
(Reid—burt continued)
ADVANTAGES:
a -i--1
a.Insurance,(approximately $400.00 per year or $12,000 over
30 years)
b.Durability
c.Interior masonry wall
DISADVANTAGES:
a.Exterior requires periodic maintenance
5.Roof requires maintenance
c.Wall U factor of 0.16
S UMM ARY.
There is $175,000 budgeted for the building.Out of this amount
items such as automatic gas pumps,paving,fencing,gas tanks,hydraulic
lifts,tire changing equipment,etc.,were planned on being purchased.
If the metal building bid of $129,186 is accepted,the building accessories
will be possible.The concrete building accessories would have to be
budgeted out of next years budget.The Light and Power metal building
has proved satisfactory for this type of use and I feel that the concrete
building may be more building than is necessary.It is my recommendation
therefore,that the metal building proposal from Burton Builders be
accepted.
Respectfully,
TOWNQf ES,TES P
Bill Van Horn
Public Works Director
BVH/dbl
00
MEETING ROOM USE AUTHORIZATION
ORGAN IZAT ION
ADDRESS PHONE NUMBER
MEETING ROOM
ENTRANCE (EAST..WEST)SOUTH OR UPSTAIRS)
DATE(S)AND TIME(S)OF USAGE____________________________________________
PERSON ASSIGNING ROOM___________________________________________________
THE ABOVE ORGANIZATION HEREBY ACCEPTS ALL RESPONSIBILITY FOR DAMAGE
INCURRED TO THE ESTES PARK MUNICIPAL BUILDING DUE TO THEIR USAGE OF THE
SAME..WHETHER BY THEIR OWN MEMBERS OR BY OTHERS WHO MAY ENTER ENTRANCES
FOR WHICH THE ABOVE ORGANIZATION IS RESPONSIBLE.SOMEONE MUST BE PRESENT
AT THE ENTRANCE DURING THE ENTIRE TIME IT IS UNLOCKED.
PERSON(S)AUTHORIZED TO SIGN FOR THE ABOVE ORGANIZATION:
(MUST BE SAME PERSON(S)WHO PICKS UP THE KEYS)
************
ORGANIZATION SIGNATURE
(MUST BE SAME AS ABOVE)
(THIS FORM REMAINS WITH PID.)
*1EY CHECKOUT *********
OUT IN
DATE .TIME Disp,DATE &TIME Disp,
//
iiAN2 00
4EALTY
P.0.BOX 1604 •218 EAST ELKHORN •ESTES PARK,COLORADO 80517 •PHONE 303 •586-2345
September 24,1975
Town Council
Town of Estes Park
Estes Park,Colorado $0517
Gentlemen:
As you may be aware,I am in the process of
tearing down and reconstructing the business
building located at 218 East Elkhorn,known as
Range Realty.
In the construction process it would be most
desirable to have a location close by for con
struction materials;therefore,I request from
the city the use of possibly three parking spaces
to be used for this purpose.Construction is
to start on October 5,and be completed not later
than January 1,1976.
I would certainly appreciate any consideration
you might be able to give to us,and your blessings
on our project.It is felt that the finished
building will be truly an asset,not only as a
personal venture,but also for the entire core
area of the village.
Thank you very much.
Sincerely yours,
‘/
NEIL W •z0SENEE
N1R :b j m