RECORD OF PROCEEDINGS
Public Works Committee
j December 23,1975
Committee:Chairman Dannels;Trustees Petrocine and Prosser
Attending:Chairman Dannels;Trustee Prosser
Also Attending:Town Administrator Hill,Director of Public Works Van
Horn
Absent:Trustee Petrocine
TRAILS:
Information regarding funding for trails was received from the State
Department of Parks and Recreation.The minimum qualifications for
funding are designation of the trail system as part of the state recrea
tion trail system and location of the trails within 50 miles of a metro
politan center of 50,000 population or more.The current proposed Estes
Park trail system,according to State sources,would most likely not
qualify for designation.The Committee recommends not applying for this
particular State aid program.
The $15,000 Larimer County grant designated for the acquisition of open
space in the Town of Estes Park,has been transferred to the development
of the trail system along Highways 36 &7 which is currently underway.
The trail is completed to the schools and will consist of decomposed
material until Spring when concrete can be laid.
Requests for trails to West Park Center and the Holiday Inn were received
and discussed.The Committee recommends that any deviations requested
from the established Town trail system be pursued and obtained directly
from the State Department of Highways at the requester’s own expense.
PUBLIC WORKS BUILDING:
A minimum of three bids was obtained for the necessary changes in the
Public Works building and equipment.A cost analysis/breakdown of these
items is attached to these minutes.The Committee recommends approval
of the plan as submitted.
STANLEY PARK -CAMPER HOOK-UP FEE:
A use fee for camper hook-ups at Stanley Park was proposed to pay for
cleaning,maintenance and repair of the camping area.The Committee
recommends a $5 fee for each camper space per the duration of the show.
TOURIST INFORMATION CENTER -PUBLIC REST ROOMS:
The current contract with DMJM-PR for the Tourist Information Center and
Public Rest Rooms does not include review of shop drawings and change
orders.The Committee recommends obtaining this service of the original
designers at a cost not to exceed $2,500.
Director of Public Works Bill Van Horn proposed that the final site
grading for the Tourist Information Center be done “in house”rather
than by the contract at a cost savings of approximately $1,800.The
Committee recommends approval.
POLICE DEPARTMENT DISPATCH ROOM:
Two alternative solutions were submitted to alleviate the Police Depart
ment dispatch room ventilation problem.First alternative involves en
larging the room and venting to the outside at an estimated cost exceeding
RECORD OF PROCEEDINGS
Public Works Committee
December 23,1975
Page Two (2)
$5,000.The second alternative involves installing an air conditioning
unit on the storage room wall of the dispatch room.The Committee
recommends the second alternative of installing the air conditioner.
DRIVEWAY PERMIT -C.O.T.DEVELOPMENT COMPINY:
Director of Public Works Van Horn reported that the driveway permit
obtained by C.O.T.Development Company for the Cedar Chalet was issued
by the State Department of Highways in March 1973 without the knowledge
of the Board of Trustees of the Town of Estes Park.
CENTENNIAL SIGNS:
The Committee discussed the possibility of installing “Centennial Com
munity”signs on the main highways entering Estes Park,but the cost of
such a project does not appear to be feasible at this time.
BRIDGES:
Under the State Highway 219 program which is administered by the County,
the Town of Estes Park will receive funding in 1976 for its Wiest Drive
and Ivy Street bridge projects.The County requires that projects be
performed under contract account and,therefore,all project plans have
been submitted for bidding (which will be conducted by the State).
Construction is scheduled to begin in April.
APWA WORKSHOP:
The Committee authorized the Director of Public Works to attend an APWA
Workshop to be held in Salt Lake City on January 22 &23,1976.
REPORTS:
The new street sweeper has arrived and will be paid for with Revenue
Sharing funds.
There being no further business,the meeting adjourned.
Ct I )
Jäan Van Horn,Secretary
APPROVE6
J1\N 13 1976
RK
T JES,J
r 18,1975
CONTRACT &PAYMENTS
Burton Builders Contract (thru do #15)
Town Employee Labor (thru 12/12/75)
Relocation of County Service (Natural Gas)
Soil Tests
Hardware and Bolts
Eastwood &Cavell
Compressor Gas &Oil (Water Department)
SUB TOTAL
CONSTRUCTION COSTS
$131,226.00
2,991.68
339.88
135.00
1.90
1,654.58
_____
18.14
$136,367.18
Asphalt Paving at $4.OO/yd.
Perimeter Site Fence
Exterior Lighting
Sewage Disposal System
Insulate Overhead Doors (material only)
Sand Trap at Floor Drain
Handrail and Stairs at Storage Decks
Steel in Floor (for tie down)
Janitorial Sink in Work Area
Labor and Equipment Cost for Systems Installation
(in house expense)
SUB TOTAL
SERVICE EQUIPMENT
TOTAL BUILDING &SITE WORK:
$5,400.00
5,367.00
200.00
550.00
504.00
250.00
160.00
164.09
300.00
2,900.00
$15,795.09
$152.162.27
Lubrication Equipment including Air Motors and
Hose Reels
Lubrication Installation including Line Lubricators,
Guages,Piping and Couplers
Waste Oil Drain
Fuel Dispenser System with 2 each Submersible Pumps,
3 each Dispenser and 70 each Key Control System
Fuel Storage and Supply Including 2 each 10,000
Gallon Tanks with Fittings,Bushings,Manholes,Supply
Lines,etc.
Installation of Above Fuel Dispenser and Fuel
Storage Systems
Island Form for 3 Fuel Dispenser (4 x 18)
Air Compressor
Hydraulic Hoist with 27,000 capacity —Installed and
Oiled
Electric Chain Hoist with Chain Container
Electric Welder
Welder Accessories
Tire Changer
Brake Shop Equipment
$1,777.59
358.93
72.20
4,797.07
4,911.00
2,860.00
162.00
1,144.34
4,114.25
611.75
437.00
130.32
747.50
3,207.O0-
PUBLIC WORKS BUILDING
Cost Analysis/Breakdown
Public Works Building
Cost Analysis/Breakdown
Page two —December 18,1975
SERVICE EQUIPMENT continued
Tire Balancer
Tire Safety Cage
Heavy Duty 50 Ton Press
Engine Stand
Transmission Jack
“Air”Parts Washer
Electric Chord Reel (2 each)
Air Service Reel
Wheel Alignment Center
Recoil Air Hose (3 each)
6”Vice
Engine Diagnostic System
Warehouse and Work Area Shelving and Benches
Air Tools including 3/8”,1/2”,3/4”,Impact Wrench
Sets;Impact Hammer and Air Grinder
Tire Storage Rack
SUB TOTAL
$426.40
43.45
1,232.O0
145.00
226.21
186.96
54.12
111.90
5,4O1.O0-
53.91
52.65
1,615.50
2,100.00
1,O26.O8
300.00
$38,306.13
CARPENTRY EQUIPMENT
6”Jointer
10”Table Saw
10”Band Saw
$327.00
416.00
218.00
SUB TOTAL $961.00
Total plus contingency
MINUS
Air tools
Key Control System
Brake Shop
50 Ton Press
1 Ton Chain Hoist
Wheel Alignment Center
RESULTING TOTAL
$l91,42.4O
$15,000.00
$206,429.40
$1,026.08”
2,566.88”
3,2O7.OO
1,232.00”
611 .75—,
5,401
$192,384.69
BUDGET
1976 SHOP EQUIPMENT
1976 TRUCK
175,000.00
5,000.00
10,000.00
00 00
GRAND TOTAL
CONTINGENCY
TOTAL:$190,000.00