HomeMy WebLinkAboutMINUTES Water Committee 1963-12-02C
RECDRD DF PRDCEEDINGS
Water Committee
December 2,1963
Committee:Chairman,Henry Dannels;Trustees,Richard Snart and Carl Swanson.
Attending:Chairman,Henry Dannels;Trustees,Richard Snart and Carl Swanson.
Also Attending:Dale G.Hill,Town Clerk;V.L.McCracken,Water Superintendent.
Absent:None
W.W.Wheeler Engineering Report:
The Clerk reported Mr.Wheeler has almost completed the drawing of
the Water System located within the Town of Estes Park.Mr.Wheeler
will be in Estes Park next week to meet with Mr.McCracken and obtain
further information to complete the drawings of the Water System.
Mr.Wheeler has completed the preliminary cost report of the concrete
reservoir.This structure will cost $50,000.00.This figure in
cludes the structure only.It does not include excavation,distri
bution,etc.
Quasbarth and Thomas Subdivision Water Mains:
Supt.McCracken reported the following costs estimated for the
proper 4”water mains including 2 fire hydrants:
Quasbarth Thomas
Joint Use $203.12 Joint Use $203.12
Quasbarth 2,518.75 Thomas 3,575.00
$2,721.87 $3,778.12
The above figures are based on 2000 feet of 4”galvanised pipe
at a cost of $3.25 per foot installed.Also two fire hydrants
at a cost of $250.00 each.The above figures are estimates and
are not to be used in any future contracts,etc.
Water Accounts Receivable:
The Committee reviewed the current accounts receivable in the
amount of $4,784.87.The policy of water shut-offs will be
enforced.
There being no further business,the meeting adjourned.
Dale G.Hill,Town Clerk
DGH:klw