Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1963-12-02C RECDRD DF PRDCEEDINGS Water Committee December 2,1963 Committee:Chairman,Henry Dannels;Trustees,Richard Snart and Carl Swanson. Attending:Chairman,Henry Dannels;Trustees,Richard Snart and Carl Swanson. Also Attending:Dale G.Hill,Town Clerk;V.L.McCracken,Water Superintendent. Absent:None W.W.Wheeler Engineering Report: The Clerk reported Mr.Wheeler has almost completed the drawing of the Water System located within the Town of Estes Park.Mr.Wheeler will be in Estes Park next week to meet with Mr.McCracken and obtain further information to complete the drawings of the Water System. Mr.Wheeler has completed the preliminary cost report of the concrete reservoir.This structure will cost $50,000.00.This figure in cludes the structure only.It does not include excavation,distri bution,etc. Quasbarth and Thomas Subdivision Water Mains: Supt.McCracken reported the following costs estimated for the proper 4”water mains including 2 fire hydrants: Quasbarth Thomas Joint Use $203.12 Joint Use $203.12 Quasbarth 2,518.75 Thomas 3,575.00 $2,721.87 $3,778.12 The above figures are based on 2000 feet of 4”galvanised pipe at a cost of $3.25 per foot installed.Also two fire hydrants at a cost of $250.00 each.The above figures are estimates and are not to be used in any future contracts,etc. Water Accounts Receivable: The Committee reviewed the current accounts receivable in the amount of $4,784.87.The policy of water shut-offs will be enforced. There being no further business,the meeting adjourned. Dale G.Hill,Town Clerk DGH:klw