Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1964-05-11RECDRD DF PRDGEEDINGS Water Committee —Special Meeting May 11,1964 Committee:Chairman,Henry Dannels;Trustees,Carl Swanson,L.Leo Martin Attending:Chairman,Henry Dannels;Trustees,Carl Swanson,L.Leo Martin Also Attending:Mayor Clarence A.Graves,Town Clerk Dale C.Hill,Water Superintendent V.L.McCracken representing Phillips,Carter, and Osborn--Robert Crabtree anã Walt Caidwell Absent:None The purpose of this meeting was to review the engineering report submitted by Phillips,Carter and Osborn,on May 7,1964. Increase the Capacity of the Fall River Plant: The Water Committee recommends this project,at a cost of $2,000.00 to increase the capacity of the Fall River Plant to ½MCD,proceed at the earliest possible time.The Water Department can complete this project with their own crew. Extension of the 12”Fall River Pipe Line From Chiquita Lane to Highway #34: The Committee recommends this project be approved and that plans and specifications be drawn as soon as the State Highway obtains the right—of—way for the completion of the By—Pass.The cost of this project is estimated to be $25,000.00. Construction of Steel Storage Tank on the Fall River System: After considerable discussion,the Committee recommends immediate construction on the proposed storage tank at site No.2.The Committee recommends this project be numbered Schedule 1 of a bid,the plans and specifications to be completed by Phillips,Carter and Osborn.Paul Van Horn,Town Engineer,is to check with Phillips, Carter and Osborn for local surveying. Replace the Section of 4”Pipe Line on the South Side of the Big Thompson River connecting the 8”Glacier Creek Supply to the Existing 6”Line Running Easterly Towards St.Vram Avenue with an 8”Pipe Line: The estimated cost of this project is $2500.00.The Committee recommends this project be included in the first set of plans and specifications and numbered Schedule 2. Replace a Section of Wood Pipe From Bitners to Elkhorn Avenue: The estimated cost of this project is $10,000.00.The Committee recommends this project be included in the first set of plans and specifications and numbered Schedule 3. Replace Wood Stave Pipe Line from the Black Canyon Plant to Bitners: The estimated cost of this project is $60,000.00.The Committee recommends approval of this project. o 0 RECDRD OF PROCEEDINGS Water Rates: The Committee discussed a proposed rate increase in the amount of 20 per cent overall increase,plus changing the rural rate from 1 1/2 times the urban rate to 1 3/4 times the urban rate0 General Obligation Bonds: The Committee discussed Boettcher and Company’s recommendation that the proposed $300,000.00 bond issue be authorized and only the bonds needed would be sold.The balance of the bonds would be placed in the Boettcher and Company vault to be sold as needed at a later date. COST ESTIMATE 1.Increase Fall River Plant $2,000.00 2,Extend 12”Main on By.’Pass 25,000.00 3.400,000 gallon storage tank 60,000.00 4.Replace 4”with 8”on connecting Glacier Creek Line 2,500.00 5.Replace Wood from Bitners to Elkhorn Avenue 10,000.00 6.Replace Wood from Black Canyon to Bitners 60,000,00 $159,500.00 Engineering $8,000.00 Land and Right-of-Way $10,000.00 $177,500.00 There being no further bus ess,t rn ting adjourned. ale G.Hill,Town Clerk DGH:klw