Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1968-05-21RECORD OF PROCEEDINGS Water Committee Meeting May 21,1968 Committee:Chairman Dannels;Trustees Steele and Swanson Attending:Chairman Dannels;Trustee Swanson Also Attending:Superintendent McCracken and Town Clerk Hill Absent:Trustee Steele This special Committee meeting was called to open the bids on the four inch steel water line proposed for Devils Gulch.This line will run from the SW corner of the C.R.Hauge property in an easterly direction, a distance of approximately 4250 feet to the SW corner of the Sam McCreery property. The following bids were received and opened: 1.Eastwood &Gavell:$2.50 per foot for labor and material. 2.Rocky Mtn.Concrete &Const.Co.:$1.77 per foot for labor only.In order to compare this bid with the Eastwood &Gavell bid,the cost of material ($1.46½)would be added to the labor l.77)making a total of $3.28½per foot. The Committee recommended to the Board of Trustees that the above men tioned water main extension job be awarded to Eastwood &Gavell as per their low bid. The estimated total cost of this project is $11,000.00 including the tap to the existing water main. There being no further business,the meeting adjourned. Dale G.Hill,Town Clerk pru Li MA’t 27 1988 J-E.s .C >BDAi)o rL2S