HomeMy WebLinkAboutMINUTES Water Committee 1968-05-21RECORD OF PROCEEDINGS
Water Committee Meeting
May 21,1968
Committee:Chairman Dannels;Trustees Steele and Swanson
Attending:Chairman Dannels;Trustee Swanson
Also Attending:Superintendent McCracken and Town Clerk Hill
Absent:Trustee Steele
This special Committee meeting was called to open the bids on the four
inch steel water line proposed for Devils Gulch.This line will run
from the SW corner of the C.R.Hauge property in an easterly direction,
a distance of approximately 4250 feet to the SW corner of the Sam
McCreery property.
The following bids were received and opened:
1.Eastwood &Gavell:$2.50 per foot for labor
and material.
2.Rocky Mtn.Concrete &Const.Co.:$1.77 per
foot for labor only.In order to compare this
bid with the Eastwood &Gavell bid,the cost of
material ($1.46½)would be added to the labor
l.77)making a total of $3.28½per foot.
The Committee recommended to the Board of Trustees that the above men
tioned water main extension job be awarded to Eastwood &Gavell as per
their low bid.
The estimated total cost of this project is $11,000.00 including the
tap to the existing water main.
There being no further business,the meeting adjourned.
Dale G.Hill,Town Clerk
pru Li
MA’t
27 1988
J-E.s .C
>BDAi)o rL2S