Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1969-05-05Nfl Water Committee Meeting May 5,1969 RECORD OF PROCEEDINGS C onmd t tee: Attending: Chairman Dannels;Trustees Swanson and Steele Chairman Dannels;Trustees Swanson and Steele Also Attending:Superintendent McCracken,Town Administrator Hill Mr.Shanks and Mr.Smith appeared before the Committee to discuss the water extension contract between the Town and Lone Pine Acres.The Committee recommends to the Board of Trustees that the Town enter into the standard water extension agreement as requested by the owners of Lone Pine Acres. The following fees are suggested to be included in the above mentioned agreement: Lone Pine Block Block Block 2,Lots First Addition to Block 3,Lots Block 4,Lots Block 4,Lots Block 5,Lots Block 6,Lots Block 7,Lots Block 8,Lot 1 Block 8,Lot 2 8,9,10,11 &12 Lone Pine Acres 1,2,3,4,5,6, 1,2 &3 4,5 &6 1 through 19 3,4,5,7,8,9 &10 1,2,3,4,5 &6 Each lot $500.00 9,000.00 500.00 250.00 500.00 250.00 250.00 250.00 250.00 5,000.00 1,900.00 Total $1,000.00 9,000.00 2,500.00 2,000.00 1,500.00 750.00 4,750.00 1,750.00 1,500.00 5,000.00 1,900.00 $31,650.00 The total cost of the water distribution system in Lone Pine Acres was $42,168.22. The owners of the Elkhorn Lodge appeared before the Committee and re quested the Town install a water main of sufficient size to adequately provide fire protection to their property.Water Superintendent McCracken reported this will require the installation of a new six inch water main. Superintendent McCracken estimated 1200 feet of six inch main will cost about $4,800.00.The Committee will study this request for the 1969-70 budget.Superintendent McCracken requested to check with the Water Engineers as to their suggested design of this line. Water Applications: Wayne f.O’Kelly request to serve a single family residence in the Parton Subdivision.Approved. Win.C.and Donald D.Bender request to serve a 30 unit motel and 10 single family units at 2410 Fall River Road.The Committee tabled this application for additional information.The Committee will need a plat showing the water system design. The Committee recommends to the Board of Trustees of the Town of Estes Park that the proposal for engineering service from Phillips -Carter - Reister and Associates dated April 14,1969 be accepted.This proposal is attached to and made a part of these proceedings. Acres Addition 1,Lots 3 &4 2,Lot 1 7 &8 Cc RECORD OF PROCEEDINGS Page two Water Committee Meeting May 5,1969 The Committee recommends to the Board of Trustees of the Town of Estes Park that the Town approve the formation of a subdistrict to the Northern Colorado Water Conservancy District as suggested by the Six City Water Committee.The proper resolution will be presented for the consideration of the Board of Trustees at the next regular meeting of the Board. There being no further business,the meeting adjourned. Da e G.Hill,Town Administrator APPROVE j MAY 12 1989 TOWN u-ESEES P/(L BOARD OF TRUSTEES PHILLJPS CARTER REISTER AND ASSOCIATES ORLEYO.PHILLIPS.PE ENGINEERS.ARCHITECTS.PLANNERS.CONSULTANTS E.H.CARTER,pE 910—15TH STREET DENVER PHONE 266-248, FLOYD M.REISTER •AlA DONALD S.RAND.PE W.6.COLWELL,]R..PE JAMES D.McGILLIS •April 14,1969 Mr.Henry D.Dannels Chairman of Water Committee Town of Estes Park P.0.Box 1200 Estes Park,Colorado 80517 Re:Proposal for Engineering Services Dear Mr.flannels: In response to your request of April 7,1969 we submit herewith our proposal for performing the engineering services for the design and preparation of construction plans,specifications and contract documents for three specific components of the water system improve ment program that is delineated in a report titled “A Plan for Growth of the Estes Park Water System.The above named report constitutes the preliminary phase of engineering and the following proposal specifically recognizes that this phase of the engineering has been completed.The engineering services herein proposed will follow the concept and criteria established by the “Report”. This proposal is for three separate components of design in the presently envisioned “Project”and the three separate components are: 1.The Glacier Creek Water Treatment Plant Phase I.(3 mgd capacity). 2.An 18-inch treated water supply pipeline from the Glacier Creek Treatment Plant to a connection in Crags Drive. 3.Black Canyon filter Plant (0.5 mgd capacity). We herewith offer to perform complete engineering and architectural services in connection with this Project,consisting of design,preparation of construction plans and specifications and contract documents.The specific services which we offer to perform are explained in more detail as follows: PHtLLIPS •CARTER•REISTER AND ASSOCIATES Mr.Henry D.flannels Page -2- April 14,1969 1.Detailed field surveys of the plant sites as required for definitive design. 2.Detailed field surveys for the definitive design of the pipeline,consisting of alignment and profile surveys, and establishing reference points of the alignment for the eventual construction. 3.Test borings and soil analysis for design of the structures and sub-surface exploration to determine the physical quality of the excavation materials to be encountered along the route of the pipeline. 4.Preparation of the final design,preparation of the construction drawings,and the preparation of the specifications and contract documents for bidding purposes. 5.The drawings,specifications and contract documents for the Glacier Creek Treatment Plant and the Glacier Creek Pipeline would be included in one volume but with separate bidding schedules for the pipeline and plant.Specifications and contract documents for the Black Canyon Filter Plant would be a separate volume.The plans will be reduced to one half size and bound with the specifications.Sufficient copies of the specifications and reduced drawings will be furnished for the Town’s use,for bidding purposes and for construction purposes.Ten full size prints of all drawings will be furnished in addition to the reduced drawings.The final drawings will be prepared on cloth in pencil and the plan and profile drawings for the pipeline will be prepared on an acetate medium with aerial photogrammetric background. 6.Obtain the approval of the Colorado State Department of Health or other entities or authorities having jurisdiction. 7.Preparation of an estimate of cost based on final plans and specifications. During the preparation of the drawings and specifications we will consult frequently with the Town officials to ensure that the final plans and specifications represent the requirements of all parties concerned and that there is mutual agreement concerning all phases of the Project. cc 00 PHILLIPS•CARTER REISTER AND ASSOCIATES Mr.Henryfl.flannels Page -3- April 14,1969 We are in a position to commence work on the Project by May 1 and we will complete plans and specifications in their entirety on or before Sept.1,1969.We offer to perform the above described services for a lump sum fee of $38,000.00.Should the Black Canyon Treatment Plant component of the Project be deleted the lump sum fee would be $35,000.00. The scope and extent of additional engineering services required for the ultimate completion of the project are not defined in sufficient detail to establish a fee and such services are specifically excluded from the above proposal.These specific exclusions are: a.Right-of-way and boundary surveys. b.Detailed and general engineering supervision of construction. c.field surveys during construction. d.Checking of manufacturer’s shop drawings. e.Administration of the construction (paper work). At such time that the scope of these various features are known it is suggested that a separate proposal be submitted to accomplish the required services. We appreciate the opportunity to continue work with the Town of Estes Park and your acknowledgment of this proposal will be sufficient authority for us to proceed and to enter into a formal agreement. Very truly yours, PHILLIPS-CARTER -REISTER AND ASSOCIATES,INC. j%i ), W.B.Colwell,Jr.f WB C/lmm