Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1971-12-06RECORD OF PROCEEDINGS Water Committee Meeting December 6,1971 Committee:Chairman Dannels;Trustees Steele and Prosser Attending:Chairman Dannels;Trustees Steele and Prosser Also Attending:Town Administrator Hill,Superintendent McCracken, Business Office Manager Duncan,Town Engineer W. Van Horn RURAL WATER APPLICATIONS: Robert H.Bigler:One rural residence located on a portion of the Southeast ¼of Section 23,Township 5 North,Range 73 West of the 6th P.M.The Committee re commends approval. Herbert N.Floersch:One rural residence located on a portion of Lots 12 and 13,Stanley Heights “A”Subdivision.The Com mittee recommends approval. Cleo Cooprider-Hi C’s Motel:Thirty two commercial units including the existing Hi C’s Motel located on Fall River.The Committee recommends approval. Park Entrance Mutual Pipeline and Water Company:Request to purchase water for 24 lots located in Park Entrance Estates. The Town’s consulting engineer esti mated the cost of the 6 inch extension to be approximately $31,350.00.If the Water Company shows continued interest,the Committee recommends proceeding with all legal and engineer ing costs of the extension to be born by the applicant.Fees will be estab lished at a later date.Preliminary approval is recommended. LEONARD MURPHY SWIMMING POOL: Leonard Murphy appeared before the Committee voicing his objection to the water rights fee assessed for his swimming pool and also the water billing for the pooi.The Committee recommends deletion of the water rights fee in the amount of $97.20;however,the water bill in the amount of $110.16 will stand as billed.All water for Valhalla Cottages shall be metered by June 1,1972. CHARLES HEIGHTS SUBDIVISION: Town Engineer Van Horn and Superintendent McCracken made a policy recom mendation for future water connects in the subdivision.They recommend permitting eleven (11)residential taps on eleven undeveloped lots below the blue line on the first filing of the subdivision and allow no addi tional taps for lots in the second filing until the potential of the new 18 inch main has been determined. Water Committee December 6,1971 Page two RECORD OF PROCEEDINGS RAW WATER PROPOSAl: Town Administrator Hill reported on a proposal from Woodward-Clevenger and Associates,Inc.,offering to do a study on raw water requirements for the Town for a fee of $2,500.00 to $4,000.00.The Town’s consult ing water engineers do not recommend the study at this time.Preliminary results of the Phillips,Carter,Reister and Associates study indicate the Town of Estes Park should continue to be active in the Six City Water Committee. DELINQUENT WATER ACCOUNTS: The Committee instructed Business Office Manager Duncan to proceed with the publication of delinquent urban accounts followed by certification to the Larimer County Treasurer for collection.Delinquent rural accounts shall be disconnected. WATER C(STRUCTION PROGRESS REPORT: udent McCracken reported that the 18 inch Glacier Creek line tested for leaks.All the concrete has been poured at Black id 50 percent of the concrete poured at the Glacier Creek plant There beng no further business,the meeting adjourned. VED C Superint is being Canyon a site. Ll Duncan,Bus Manager APPRC DEC13 1971 T0V Uf Er BOARD OF T.