HomeMy WebLinkAboutMINUTES Water Committee 1972-06-05flfl RECORD OF PROCEEDINGS Water Committee Meeting June 5,1972 Committee:Chairman Prosser;Trustees Dannels and Sutter Attending:Chairman Prosser;Trustees Dannels and Sutter Also Attending:Town Administrator Hill,Superintendent McCracken, Business Office Manager Duncan RURAL WATER APPLICATIONS: Dwayne P.Herman:One rural residence locatedon Eagle Cliff between Valhalla and Machin’s Cabins.The Committee recommends approval subject to being connected to four inch line and located under the 7,850 foot blue line. Peter I.Van Ausdall:One rural commercial building located on Lot 5,Block 3,Larimer Terminals. The Committee recommends approval. Lee Parker:One rural commercial building located on Lot 9,Larimer Terminals.The Committee recommends approval. Eastwood &Gavell:One rural residence located on Lot 4, Block 3,Larimer Terminals.The Committee recommends approval. David S.Binns:Two rural residences located on Devils Gulch road near the Gem Lake Trail- head.The Committee recommends approval subject to installation of four inch line extension and location under the 7,850 foot blue line. HIGII PINES SUBDIVISION: To date,Mr.Joel Bacon has not provided the Town with a deed to the four inch water extension serving High Pines Subdivision.However,Mr. Bacon has advised that he will proceed with obtaining the necessary signatures from land owners in the subdivision. HIGH DRIVE WATER RESUME: The Committee acknowledges receipt of the resum,dated April 21,1972, from Mr.Andy Anderson to be used for future consideration of the High Drive water system. WATER CONSTRUCTION STATUS REPORT: Town Administrator Hill presented a construction status report from Phillips, Carter,Resiter and Associates,Inc.The attachment is made a part of these minutes. 00 00 RECORD OF PROCEEDINGS Water Committee Meeting June 5,1972 Page two WATER SYSTEM MAPPING: The Committee recommends utilizing the services of the Town Engineer to continue updating the present water system map as changes occur. TOM JOHNSTON WATER LINE: Mr.Tom Johnston appeared before the Committee as spokesman for a party of six water users,all of whom are connected to a private water line that is grossly inadequate.Mr.Johnston requested assistance from the Town in correcting the supply problem which requires the installation of approximately one thousand feet of four inch water line.The Committee recommends that the present policy of the Town not be changed and that a new line be installed by the property owners.The Committee also recommends that each property owner involved be notified by letter as to the Town’s water extension policy. There being no further business,the meeting adjourned. Lloy\Duncan,Business Office Manager JUN121972 TOWN OF ESIES PARK I L_BOARD OF TRiSTEE3 QQ 1 PHILLIPS •CARTER •REISTER AND ASSOCIATES,INC. ORLEYO.PHILLIPS,P ENGINEERS •ARCHITECTS •PLANNERS.CONSULTANTS E.H.CARTERPE 910-15TH STREET •DENVER PHONE 266-2481 FLOYD N.REISTER,AlA DONALD S.RAND,DE W.B.COLWELL,JR..PE JAMES 0.MCOILLIS,PE 3uno 2,197Z WESTERi1 STATES COSTRUCTION CO. P.0.Box %93 Loveland.Colorado C0537 Re:1S-CCL0-9O GlacIer Creek and slack Canyon Water Treatiient Plants Gentl en: We ask you in the interest of cooperation with the Town of Estes Park to exert some effort to place the slack Canyon Plant in oprt1on.Only minor 1ters are required to do so prior to your yet unstated c!ate for final inspection nd tt1nq.The contract docu;ents provide for liquidated darras on this Schedule C past arch 12,1972 whIch has been waived by the Town up to this point since the water production from flack Canyon has not been critical to ther.Continued xcCptiOn in thfs rosp:ct can not be assured. The contract coip1etioa date for Schedule A,qiacier Creek Tretnent Plant is Juno 10,1972 and of course tha facility iiIU not be usable to th Town on that date.Again the Contract Oocuiicnts provide for liquidated dnages for lato corn pletf on and in this case there are both Intanqible and tnqib1e danagcs the Town may in part be compensated by the Contract amount of $1O0.O per day that the Contract is late. Very truly yours, P!LLIPS-CARTER-REISTER AD ASSOCIATES,ThC. W.L3.C1we1L Jt. WC:vw cc:Town of Estes Park # 141)0 -Denver Mr.Hartwell •••. •.Co CONSTRUCTION STATUS REPORT Western States Construction Co.,Inc. WS-COLO-90 For the Period May 5 thru June 1 ,1972 BLACK CANYON TREATMENT PLANT (SCHEDULE B) The project has been completed with the exception of completing the site grading and backfill and the completion of very minor items within the build ing.With the completion of these minor items the plant could be put into operation and the “shake down”at least started. No effort is being made on the part of the contractor to complete the small amount of work remaining to deliver a usable facility to the Town. GLACIER CREEK TREATMENT PLANT (SCHEDULE A) Considerable progress has been made by the Contractor during this period, however it is a case of a lot-too late. The concrete work,masonry,pre-cast roof and yard piping are complete.Por tions of the equipment are installed and some electrical work is “roughed—in”. The work remaining consists mainly of tying units together,piping and structure finishes. FORECAST BLACK CANYON PLANT -Could be placed into operation with the cooperation of the Contractor. GLACIER CREEK PLANT -Will requite at least the entire month of June to reach a point use could be made of the plant and at least another month to complete the plant finish and site work./ PHILLIPS-CARTER-REISTER &ASSOCIATE jNC. Project Engineers V