Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1974-05-07RECORD OF PROCEEDINGS00 Water Committee Meeting May 7,1973 Page three TOWN PURCHASE OF EQUIPMENT(continued): required equipment such as a tapping machine,pipe saw,etc. WATER MAIN CONSTRUCTION PROGRAM: The Committee recommends implementation and construction of the follow ing distribution system improvements: No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. Description Highway 7 Highway 7 Xing at Devon Highway 7 Xing at Twin Dr. Twin Drive Line West of Highway 7 4”No.at Highway 66 Nary’s Lake Road Xing -Spruce &Cleave Stanley Upper &Lower Broadview High Pines “Y”Junction No.of Devil’s Gulch Highway 34 &Summit Birch and High Back of Dump TOTAL Estimated Cost coii PLT $80,5O0’ 2,500’, 7,000 ‘ 13,500 19,500 32,500 8,500 21,000 5,500 16,500 5,000 8,000 vy49r’. 5,000w 6,500 20,000 $254,000 The Water Superintendent and Consulting Water Engineer will decide which items will be bid and which items will be constructed by the Town Water Department. WATER MAIN EXPANSION POLICY: The Couimittee recommends the water main extension policy cost participa tion shall be determined by the applicable methods set forth below: A.The customer shall pay for the total cost of system ex tension if the extension is for annexor’s benefit alone and the expansion or extension is not a designated “(A)”item of the “Plan”. The minimum pipe size shall be 4-inch. B.If the Town determines that it is to the Town’s advantage to increase the pipe size,that the customer is installing for his benefit, the Town shall pay for only the cost increase in pipe size that the Town requests. C.If a particular annexation requires an enlargement of an “(A)”designated improvement the cost of enlargement shall be determined in the following manner: (1)The customer and the Town shall share equally the construction cost of excavation,backfill,installation of pipe,pavement replacement and all other items of construction except the cost of pipe. 17 14 15 20 19 13 23 8 27 25 22 V rbidityColor(CobaltScale)U,0________________________>0rossBetaActivity{adium2260County:LarimerCHEDJCALANi\1.YS1SOFWATC.COLOR\D0DEPAR1lENTOFUEALtimerCo.H.D.200W.OakSt.Ft.Collins_________________________________DateArt:ilyd:1—28—74Municipality:EstesParkThereCliecodrTownHallDateandTiaeSumpled:2—1—7410:45SourceofSupply(Ifwellvedept):______-_________Ciiectcc1bv:C.ç___Chest:_0]on__—_____________________________________________-zw,-crzn,.LCT.-jWZU:L;_:-;-_..._:,tt,t______________________‘Nixirmimallnr’ah\;fo’indjRecomonded_LimitlAsfound______________________5rirdts1.0______-Total!iame-2415units5Calcium(Ca)(asCaCO’)-I16ThresholdOdorNumber—0.05mg/iArsenic(As)0.01mg/irecoirmiended0mg/ICadmium(Cd)0.01mC/I0+6Chromium(Cr)0.05mg/i0mg/IFluoride(F)2.4mg/I0.12mu/iAad(Pb)0.05mg/i-0mg/iSelenium(Sc)f).0imu/I0mg/iBarium(Ba)L0m/1-mg/i0.2mg/ICyanide(CN)0.01mg/irecommended—mg/lSilica(Si)1Molybdenum(Mo)0rossAlphaActivityuuc/lIFB-uuc/lIFBuuc/lMagnesium(Mg)125mg/i2PhenoiphthaleinAikalinitL—0mg/iTotalA1ki__-16mg/iTotalSolids——500m/133mg/iSpecificConductance-35m;cror’.hoSodi(N)___________-4mg/iNethyleneBlueActiveSurfactants-0Copper(Ci).1.0mg/i0mg/IZinc(Zn)5.0mg/i0.05mg/IIron(Fe)0.3mg/i0.2mg/iManganese(Mn)0.05mg/i0mg/IChloride(CI)250mg/I7mg/INitrate(N03)45mg/I0mg/iSulphate(SOt)250mg/i2mg/IPhosphate(4)-0mg/iAnunonia(NTh)-0mg/iBoron(B’)iifl/imdlESENG44-L(Rev.1-68-20)