Loading...
HomeMy WebLinkAboutMINUTES Water Committee 1984-01-120 0 BRADFORD PUBIJSHING CO.,DENVER R E C 0 R D 0 F P R 0 C E E D I N G $ V Water Committee January 12,1984 Committee:Chairman Wagner,Trustees Dannels and Hix Attending:Trustees Dannels and Hix Also Attending:Mayor Tregent,Town Administrator Hill,Water Superintendent Richards,Finance Officer Duncan,Clerk Jensen Absent:Chairman Wagner AUTHORIZATION TO REPLACE VEHICLES: Water Superintendent Richards requested permission to replace the 1971 Jeep and the 1979 Dodge pickup with a 1/2 ton and 3/4 ton 4 by 4 pickup.These replacements were allotted for in the 1984 budget.The Committee recommends Superintendent Richards go out for bids on the vehicles. 1984 WATER DEPARTMENT PROJECTS: The Committee reviewed several relatively small 1984 Water Department needs.The Water Department will proceed with these as time permits.(See attached list.) REPORTS: Munchiando Construction has agreed to complete the water line installations by May 15,1984 and has entered into a written agreement stating the same.The Town has retained $4,000 in payment subject to the completion. December 1983 water use showed a +44.36%increase from November 1983 anc a +2.10%increase from December 1982.The total percent of water accounted for as of December 13,1983 is 64.35%.Bob Richards indicated that he has asked both water plants to monitor their water use figures to see if they compare with the Towns. Prospect Estates Water Agreement —acceptance:Superintendent Richards stated that he had inspected the Prospect Estates Pumping Station and it did not pass due to some electrical problems.Superintendent Richards stated the Town would require electrical drawings as well a one—year warranty on the system prior to acceptance by the Town.Administrator Hill stated that Don Spomer had previously agreed that no one would connect to the system until it was completed.The Committee recommends again that no connections be allowed until the system is accepted by the Town.Town Attorney Greg White will prepare the acceptance agreement transferring ownership to the Town,which will provide for the utility right-of-ways. There being no further business,the meeting adjourned. . Ann E.Jensep Town Clerk 4 ,Th /“ JAN 2 41984 U EThS iUt O TittE.ES ..‘‘..%.aS.i.ijJ C 1984 WATER DEPAPTMENT PROPOSED PROJECTS 1.Finish 6”line to Stanley Avenue 2.Reconnect taps and 1½”loop 3.Hydrant Steamer Drive -raise to grade 4.Hydrant Big Horn and Cleave Street -raise to grade 5.Hydrant Stanley Avenue -raise to grade 6.6”River crossing -Elkhorn Lodge 7.Connect 6”main above Stanley 2.Stanley Park -$5,000 9.Pipe rack 10.Check dock 11.Valve box Eagle Cliff -raise to grade 12.Valve box Moraine &Davis Street —raise to grade 13.Water Dispenser -Repair valve and 1½”for Public Works 14.New Main from Aspen to Morgan 15.Limitorque at Big Thompson Water Plant 16.Glacier Water Plant -Check gate house 17.Cross—connection,etc.at Blue Arrow Campground 18.AL2 (SO4)3 Feed at Big Thompson Water Plant 19.Insulate pump house at Big Thompson Water Plant 20.Micro strainer -Big Thompson Water Plant 21.Organize yard 22.Flush mains 23.4¼”Mueller —Pinewood Lane —raise to grade 24.Virginia Drive 25.Marking posts on obscure hydrants 26.Build chemical storage at Glacier Creek 27.System mapping