HomeMy WebLinkAboutMINUTES Light and Power Committee 1986-09-04•0 0
RECORD OF PROCEEDINGS
Light and Power Committee
September 4,1986
Committee:Chairman Laing,Trustees Brown and Habecker
Attending:All
Also Attending:Town Administrator Hill,Light and Power
Director Dekker,Finance Officer Vavra,
Cashier Szydlo,Clerk O’Connor
Absent:None
DEPOSITS ON ELECTRIC ACCOUNTS -DISCUSSION:
In commercial buildings containing several electric meters,a
deposit,based upon the number of electric meters and estimated
usage,is collected from the owner.As units become rented,the
Town also collects a deposit from the lessee.The owner’s
deposit is not returned when a unit is rented.A commercial
deposit is held for approximately three years.The owner does
have the option of disconnecting vacated units;however the Town
may collect a fee for this service.Generally,commercial
accounts do not desire electric service disconnected during the
winter months.The Town’s electric rate attorney has suggested
the Town require owners of commercial buildings to sign an
agreement whereby the owner would request the electric service be
shut-off in vacant units.The Committee also discussed the
possibility of reducing deposits on multiple units,perhaps
attaching a percentage,and the clarification of existing rules
and regulations governing electric customers.The Committee
recommends no change at this time in the existing policy of
collecting two deposits on commercial accounts where an owner and
lessee are involved,instituting the aforementioned letter of
agreement.Light and Power Director Dekker will ensure customer
deposits are addressed in the rate study currently underway.
STANDBY POWER MODULE FOR MAIN-FRAME COMPUTER -FINANCE OFFICE:
Finance Officer Vavra presented a memorandum stating the recent
power fluctuation necessitated repair of the main—frame computer
plus programming for a total expenditure of $3,350.00.Finance
Officer Vavra reported NCR has a “Standby Power Module”available
which is a battery pack that will keep the unit at full power for
up to seven minutes.Purchase price is $1,295.To completely
protect the system,a second smaller unit could be connected to
the cash register and the control terminal for a price of
$800.00.The second unit would enable staff to exit any program
and “power—down”the system during a prolonged outage.Total
price of the units is $2,100.00.Following discussion,the
Committee recommends Finance Officer Vavra prepare and submit a
report identifying options of installing a device that would
protect all Town-owned equipment in the Municipal Building,
authorizing Officer Vavra to investigate the possibility of
renting the Standby Power Module for the main—frame computer on a
lease/purchase basis during the interim period.
AUTHOPIZATION TO PURCHASE TWO (2)PERSONAL COMPUTERS -FINANCE
OFFICE:
Finance Officer Vavra submitted a summary of bids received for an
IBM XT personal computer.A total of $11,000 was budgeted in
1986 which included one unit each for the Finance Department and
Light and Power Department.The Light and Power Department will
not be requesting a computer in 1986,therefore,Finance Officer
Vavra submitted a request for two complete units with one letter
quality printer and one dot matrix printer.One unit would be
used for word processing,the other for auxiliary financial
0 0
RECORD OF PROCEEDINGS
Light and Power Committee -September 4,1986 -Page two
reports.Discussion followed concerning expanding the program
capabilities on the main—frame computer in lieu of a purchasing a
second personal computer.The Committee recommends:(1)Finance
Officer Vavra be authorized to purchase one (1)IBM XT unit from
Pioneer Office Supply for $2,400.00,one (1)IBM Quietwriter
printer for $1,199.00 and the “Word Perfect”Software word
processing package for approximately $500.00,expending a total
of $4,099.00;(2)Officer Vavra prepare and submit a list of
priority projects necessitating an additional personal computer;
and (3)Finance Officer Vavra contact NCR to discuss an in-depth
study of the current computer system,with the possibility of a
representative attending the next Committee meeting.
AUTHORIZATION TO NEGOTIATE PURCHASE OF REEL TRAILER:
Director Dekker reported $27,000 was budgeted in 1926 for the
purchase of a reel pole and utility trailer.The existing reel
trailer was constructed in—house,is approximately 30—35 years
old,and does not contain brakes,which poses a safety hazard.
The trailer is used in underground and overhead construction
approximately twice/week.It has been determined there is only
one distributor in the area for such trailers.Teague Equipment
Company submitted a quotation for one (1)Hogg and Davis Model
TR-37 combination trailer for $9,261.00 excluding freight.
Including the desired options and freight,the total price is
$13,438.00.Discussion followed with the Committee recommending
Director Dekker be authorized to negotiate purchase of the Model
TR-37 Trailer from Teague Equipment Company for an amount
not—to-exceed $13,438.00.Delivery is anticipated to be 90-120
days.
REPORTS:
The Animas La Plata Dam and Irrigation Project located in the
southwestern portion of Colorado is being considered again for
construction.Federal preference power customers are willing to
accept slightly higher power rates to help finance this project
if the standard historic 50-year amoritization schedule is used.
The Federal Government,however,has indicated they will support
the project financially only if this schedule is reduced to a
30-year straight line.This matter will need to be resolved
prior to getting the project underway.
In an effort to reach the source of recent power disturbances,
staff met with representatives of the Western Area Power Adminis
tration (WAPA),Bureau of Reclamation,and Platte River Power
Authority (PRPA).WAPA was advised the disturbances,including
the lack of voltage control,was totally unacceptable.Director
Dekker will advise when additional information is available.
The Cascade Dam Project was delayed approximately ten days due to
the National Park Service advising the Federal Energy Regulatory
Commission (FERC)would most likely not issue a permit.Upon
contacting FERC,the Town was advised it was not under FERC’s
jurisdiction;however,the Town should contact FERC concerning
the permit at a later date.The project will now proceed.The
National Park Service stated they would pay all expenses incurred
by the Town should the Park Service stop the project at a later
date.
The feasibility study for the Olympus Dam Project has been
completed.Preliminary information suggests bid prices will
exceed the $160/175,000 figure previously established.The
Committee will review the study at the next meeting scheduled in
October.
All equipment has been ordered for the Marys Lake Substation.
Construction contracts have been drafted and they should be
0 0
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Light and Power Committee -September 4,1986 -Page three
advertised in approximately one week.All work is on—schedule at
this time.
The Line Truck authorized April 3,1986 has been delivered.
The first draft of Platte River Power Authority’s 1987 Budget is
now complete.The preliminary budget total is $147,000,000.
PRPA will be conducting an informational meeting for all members’
councils September 29,1986.A tour of Rawhide will take place
at 2:30 P.M.followed by the meeting at 5:00 P.M.All Board
Members are urged to attend.
Trustee Habecker requested a tour of the Town’s electric system;
a tour will take place as soon as possible.
There being no further business,the meeting adjourned.
Vickie O’Connor,Town Clerk
SEP161986
J -.